Djibouti - Power Access and Diversification Projectprocurement Plan

Djibouti - Power Access and Diversification Projectprocurement Plan

<p>DJIBOUTI - POWER ACCESS AND DIVERSIFICATION PROJECTPROCUREMENT PLAN</p><p>WORKS</p><p>PRIO PLAN Launching CONTR CONTRA R/ Evaluation Package METH VS. of Bank No- CONTRACT ACT CT DESCRIPTION POST BidOpening Rpt to the Contractor identification OD ACTU BiddingPr Objection AMOUNT US$ SIGNAT COMPLET REVI Bank AL ocess URE ION EW TEC International 03/2006/UGPE/C Supply& Installation (€ 824 697) 08/11/0 17, rue Daniel ONT ICB Prior Plan 3/29/06 06/01/2006 07/01/2006 07/11/2006 08/11/07 Projet Initial Distribution Lines 1,056,520 6 Stern 75015 Paris (France) 12/11/0 Actual 3/29/06 06/07/2006 07/08/2006 11/09/2006 05/15/08 6 Supply and Installation TEC of Balbala Distribution International 04/2010/UGPE/C Extension & Emergency 17, rue Daniel ON ICB Prior Plan 01/30/12 03/28/12 05/30/12 06/20/12 3 546 814 $ 08/20/12 03/31/14 FI 20KV line to Arta- Stern Additional Financing 75015 Paris Project (France)</p><p>Actual 02/02/12 03/28/12 05/15/12 06/05/12 09/18/12 03/31/14</p><p>TEC Amendment TEC N°1 International (04/2010/UGPE/CONT (137 352,74 € 17, rue Daniel FI Distribution Extension & 33 282 829 fdj) 02/10/14 03/31/14 Stern Emergency 20KV line to 188 038,581 $ 75015 Paris Arta) (France) STEG International Services et Supply and Installation SAGEMCOM 05/2010/UGPE/C of Smart Metering Centre Urbain ON ICB Prior Plan 01/30/12 03/28/12 05/30/12 06/20/12 2 048 101 $ 08/20/12 03/31/14 FI Program-Additional Nord, Tunis Financing Project 92848 Rueil- Malmaison (Tunisie / France) Actual 02/05/12 31/10/12 05/15/12 06/05/12 12/19/12</p><p>Total Cost 6 839 473,581 DJIBOUTI - POWER ACCESS AND DIVERSIFICATION PROJECTPROCUREMENT PLAN</p><p>BID EVALUATI Bidding ON REPORT C O N T R A C PRIOR/ PLAN CONTRAC Package Launching of Evaluation CONTRAC T METHO POST VS. Bank No- T identificatio DESCRIPTION BiddingProces BidOpening Rpt to the T AMOUNT S Contractor D REVIE ACTUA Objection COMPLETI n s Bank US$ I W L ON G N A T U R E 0 2 / 1 0 Plan 01/10/06 1/20/06 1/30/06 02/05/06 3/28/06 / 2 0 Warsama Trade 1. Computer 0 Corporation co,ltd BC 13 (hardware) 6 Projet Shopping Prior 14 972 Quartier 1 bvd 8, Acquisition for 0 Initial Djibouti PMU 2 (Djibouti) / 0 9 Actual 1/28/06 02/04/06 2/13/06 2/14/06 03/04/06 / 2 0 0 6 01/2007/UG 2. Vehicule for Shopping Prior Plan 6/30/06 7/15/06 7/30/06 08/10/06 31 386 8 10/20/06 A.C RIES P/BL PMU / Zone Industrielle Projet 2 Boulaos, Djibouti DJIBOUTI - POWER ACCESS AND DIVERSIFICATION PROJECTPROCUREMENT PLAN</p><p>0 / 0 6 0 2 / Initial (Djibouti 0 3 Actual 12/12/06 1/21/07 1/31/07 02/01/07 2/13/07 / 2 0 0 7 0 2 / 1 0 Plan 01/10/06 1/20/06 1/30/06 02/05/06 3/28/06 / 2 ETS WASSEL 0 BC 14 3. Furniture for Av Brazaville, Projet Shopping Prior 2 859 0 PMU Djibouti Initial 6 (Djibouti) 2 / 1 Actual 1/28/06 02/04/06 2/13/06 2/14/06 5 2/25/06 / 0 6 0 2 / 1 Plan 06/15/08 12/17/08 01/31/09 01/21/09 05/31/09 5 / FAL OIL Co, Ltd 01/2009/UG 0 PE/CONT 4. Supply of 6600, Sharjah UAE ICB Prior 4 288 820 8 Projet Heavy Fuel Oil (United Arab 2 Initial Emirates) / 1 Actual 09/29/08 12/17/08 01/21/09 2/14/08 4 06/19/09 / 0 8 DJIBOUTI - POWER ACCESS AND DIVERSIFICATION PROJECTPROCUREMENT PLAN</p><p>1 1 / 2 Plan 08/05/09 11/17/09 12/01/09 12/10/09 12/02/09 5 / 0 9 S.V.A.M.C BC 41 5. Vehicule for 1 Zone Industrielle Projet Shopping Prior 15 755 Initial ONEAD 2 Sud, Djibouti / (Djibouti) 0 5 Actual 10/28/09 11/17/09 11/25/09 11/30/09 12/12/09 / 2 0 0 9 Total Cost 4 353 792 GOODS</p><p>FINANCEMENT ADDITIONNEL II</p><p>GOODS & NON CONSULTANTS SERVICES DJIBOUTI - POWER ACCESS AND DIVERSIFICATION PROJECTPROCUREMENT PLAN</p><p>Biddin BID EVALUATION REPORT g Launc CONTRAC Package PRIOR/ hing of Evaluation CONTRACT METH PLAN VS. Bank No- CONTRACT T identific DESCRIPTION POST Biddin BidOpening Rpt to the COMPLETI Contractor OD ACTUAL Objection AMOUNT US$ SIGNATUR ation REVIEW gProce Bank ON E ss 02/01/ Plan 02/15/2014 03/01/2014 03/08/2014 3/15/2014 3/31/2014 Procurement of oil 2014 FII ICB Prior products (HFO) Actual </p><p>02/01/ Plan 02/15/2014 03/01/2014 03/08/2014 3/15/2014 3/31/2014 2014 Procurement of FII ICB Prior oil products (Diesel) Actual </p><p>12/01/ Plan 12/15/13 12/01/2014 12/15/2014 08/15/2013 3/31/2014 Horizon 13 Djibouti FII Fuel Storage Rental DC Prior Terminals Actual Ltd</p><p>Total Cost DJIBOUTI - POWER ACCESS AND DIVERSIFICATION PROJECTPROCUREMENT PLAN</p><p>CONSULTING SERVICES</p><p>Prio r/Po st Launchin Contra Package Descriptio Contract Revi Plan vs. g of RfPOp ContractAm Contract t SelectionMethod Contractor Comments identification n Type ew Actual biddingPr ening ount US$ Signature compl by ocess etion Ban k 1. 09/06/0 03/31/ Plan 6/19/04 10/06/04 LAHMEYER Feasability 4 05 International 01/2005/UGPE/ study and LUMP- CONT QCBS Prior 273 733 Friedberger, preparatio SUM 09/09/0 01/31/ Projet Initial Actual 02/06/04 1/16/05 Frankfurt n of bid 4 05 (Allemagne) documents 2. 09/06/0 05/31/ Plan 6/19/04 10/06/04 BRL Ingéniérie Environme 4 05 02/2005/UGPE/ LUMP- 30001 Nîmes CONT ntal Impact QCBS Prior 107 145 SUM 09/09/0 06/30/ cedex Projet Initial Assessme Actual 02/06/04 1/16/05 4 05 (France) nt 02/2006/UGPE/ 3. CQS LUMP- Post 01/15/0 29 620 03/28/ OM Consulting CONT Plan 12/12/05 1/20/06 Preparatio SUM 6 06 Projets Projet Initial n of the 5098 Abidjan Operation Actual 12/17/06 01/14/0 2/23/06 03/23/ (Côte d'Ivoire) al Manual 6 06 and the Financial Managem ent Manual for the PMU + DJIBOUTI - POWER ACCESS AND DIVERSIFICATION PROJECTPROCUREMENT PLAN</p><p> financial software 4. 12/31/ Plan 06/01/07 7/15/07 8/15/07 Consulting 08 Services for the CabIRA Technical 03/2008/UGPE/ LUMP- (€225 807) Av Houdaille, CONT Assistance QCBS Prior SUM 327 573 Abidjan Projet Initial Componen 09/19/0 08/31/ Actual 4/18/07 05/25/08 (Côte d'Ivoire) t for the 7 09 Loss Reduction Study 5. 12/20/0 12/15/ Plan 11/05/08 5/20/09 Consulting 8 09 Services for the Office Technical International 04/2009/UGPE/ Assistance LUMP- (€ 95 797) de l'Eau, CONT CQS Prior Componen SUM 04/30/0 142 000 03/31/ 87065 Limoges Projet Initial Actual 12/05/08 5/25/09 t for the 9 10 cedex Commerci (France) al Managem ent Study 11/13/0 04/23/ 6. Plan 9/30/06 12/15/06 6 07 Cabinet CECA External Rue Ras 03/2007/UGPE/ Audit (for LUMP- 4385 ( FY CONT CQS Post Makonen, FY SUM 01/22/0 05/06 ) 04/30/ Projet Initial Actual 12/09/06 3/15/07 (Djibouti) 05(PPF), 7 07 06)</p><p>7. 11/13/0 03/31/ Plan 9/30/06 12/15/06 Cabinet CECA External 6 10 Multi 03/2008/UGPE/ LUMP- Rue Ras CONT Audit (for IC Prior 23 310 yearContrac SUM 01/22/0 05/31/ Makonen, Projet Initial FY07, 08, Actual 12/09/06 3/15/07 t 7 10 (Djibouti) 09)</p><p>8. Hiring 01/10/0 12/31/ Plan 12/15/05 1/20/06 Faiyçal Omar Multi 02/2009/UGPE/ of TIME- 6 72 500 09 CONT CQS Prior Farah yearContrac Financial BASED 12/29/0 (4year) 04/30/ Projet Initial Actual 12/15/05 02/04/06 (Djibouti) t Officer 5 10 05/2007/UGPE/ 9. Wind LUMP- 05/20/0 03/31/ DARUP IC Post Plan 05/02/07 22 497 06/01/07 CONT feasibility SUM 7 08 Associates Ltd DJIBOUTI - POWER ACCESS AND DIVERSIFICATION PROJECTPROCUREMENT PLAN</p><p>05/26/0 08/28/ 4780 Stege Projet Initial update Actual 04/26/07 06/01/07 7 07 (Denmark) 10. EDD: 06/20/0 03/19/ Plan 05/25/09 11/30/09 Human 9 10 ressources diagnostic and IDEA Consult optimisatio 05/2009/UGPE/ LUMP- International CONT nincl, QCBS Prior 61 900 SUM Tunis Projet Initial action plan 08/06/0 06/30/ Actual 06/02/09 12/04/09 (Tunisie) on 9 10 reduction of non- technical losses 02/10/1 03/26/ BRL Ingénierie 11. Update Plan 12/05/09 01/25/10 30001 Nîmes 01/2010/UGPE/ LUMP- 0 19500 € 10 CONT of ESIA SSS Prior cedex SUM 27 300 $ 05/31/ Projet Initial Study Actual 12/16/09 1/15/10 02/10/10 (France) 10 12. 07/17/1 03/31/ Consulting Plan 05/30/10 06/30/11 0 14 Capgemini Services Consulting for Project 05/2010/UGPE LUMP- 176 280 € Tour Europlaza, - QCBS Prior Projet Initial SUM (270 000$) Paris La Defense Supervisio 03/02/1 03/31/ Actual 10/17/10 08/27/11 (France) n - 1 14 Additionna l Financing Avenant 05/10/1 Plan 04/30/13 05/15/13 n°1 3 (05/2010/U GPE Extension Consulting Services FII Post 53 605 € for Project - Actual Supervisio n - Additionna l Financing) 06/2010/UGPE 13. CQS LUMP- Post Plan 09/01/10 10/15/1 29 000 $ 06/15/11 06/30/ Cabinet J.C Multi Projet Initial External SUM 0 13 Colas yearContrac DJIBOUTI - POWER ACCESS AND DIVERSIFICATION PROJECTPROCUREMENT PLAN</p><p>BvdCheick Audit (for Osman FY10,11,1 04/07/1 12/31/ (Djibouti) 2) Actual 01/09/11 07/02/11 t 1 12 -Additional Financing 14. Hiring 04/05/1 03/31/ Plan 03/14/10 04/30/10 of 0 14 Financial Officier - Mourad Multi 02/2010/UGPE Additional TIME- MahamoudGuel CQS Prior 68 400$ yearContrac Projet Initial Financing BASED 04/07/1 06/01/10 09/01/ leh Actual 03/29/10 t (for 0 2013 (Djibouti) YR10/11,1 1/12, 12/13) 15. 06/30/ Plan 07/30/11 8/30/11 09/30/11 Consulting 13 Services Dr Djibril 01/2011/UGPE for LUMP- DOUCOUREBP. SSS Prior 22 200 $ Projet Initial Environne SUM 09/19/1 6/30/1 8351 Actual 07/04/11 11/24/11 mental 1 3 Dakar(Sénégal) Impact Monitoring 16. 10/10/1 02/28/ Plan 09/25/11 10/20/11 Consulting 1 12 services for Environme Fichtner GmbH 05/2011/UGPE ntal & LUMP- & Co Ltd CQS Prior 83 821 $ Projet Initial Social SUM 11/21/1 05/31/ 70191 Stuttgart Actual 10/10/11 12/0811 Impact 1 12 (Allemagne) Assessme nt (Geotherm al project) 04/2012/UGPE 17. CQS LUMP- Prior 10/15/1 13 000 $ 11/30/ OM Consulting Plan 09/01/12 11/01/12 FII Consulting SUM 2 12 Projets services to Actual 12/18/12 12/23/1 12/31/12 01/14/ 5098 Abidjan update the 2 13 (Côte d'Ivoire) Operation al Manual and the Financial Managem ent DJIBOUTI - POWER ACCESS AND DIVERSIFICATION PROJECTPROCUREMENT PLAN</p><p>Manual for 18. 10/15/1 03/31/ Plan 09/01/12 03/01/13 Consulting 2 13 OM Consulting services to 03/2013/UGPE LUMP- Projets update the SSS Prior 11 925 $ FII SUM 12/23/1 04/03/ 5098 Abidjan financial Actual 12/18/12 03/24/13 2 13 (Côte d'Ivoire) software for PMU 19. 06/10/1 12/31/ Cabinet J.C Plan 05/10/13 10/31/13 External 3 13 Colas 06/2013/UGPE/ Audit LUMP- 12/31/ Bvd Cheick CONT CQS Post - (for SUM 13 Osman FII Actual 11/03/13 YR2013/2 (Djibouti) 014) 21. 05/10/1 Plan 04/25/13 05/15/13 Extension 3 Consulting Services 04/2013/UGPE/ LUMP- Shallaby CONT for SSS Prior 28 300 $ SUM 12/31/ Tunis, Tunisie FII Environne Actual 10/07/13 14 mental Impact Monitoring 3/31/1 Jean Jacques Plan 01/15/14 4 Raoul 22. 01/2014/UGPE/ LUMP- 17 000 € 12 Bonne CONT Procurmen SSS Prior SUM (23 050.3 $) 3/31/1 Nouvelles FII t specialist Actual 02/03/14 4 22450 Langoat France TOTAL 1,695 264.3 $ COST DJIBOUTI - POWER ACCESS AND DIVERSIFICATION PROJECTPROCUREMENT PLAN</p><p>CONSULTING SERVICES</p><p>Launchin Prior/Pos Plan Contrat Package Descript SelectionM g of RfPOpeni ContractAm Contract Comme Contract Type t Review vs. completi Contractor identification ion ethod biddingPr ng ount US$ Signature nts by Bank Actual on ocess Charles Daly Recruitm 06/15/201 Plan 07/30/2012 09/15/2012 04/07/14 Coven ent of an 2 01/2013/UGPE/ Garden, Termina CONT Internatio LUMP-SUM Prior $ 59 000 IC London ted FII nal 11/01/201 Actual 12/15/2012 01/07/2013 (United Advisor 2 Kingdom) Recruitm Plan 12/01/13 ent of an 07/2013/UGPE/ David CONT Internatio LUMP-SUM Prior IC Grimbert FII nal Actual 12/09/13 12/06/13 $ 50 000 16/12/13 03/31/14 Advisor Recruitm 06/15/201 Bilane 02/2013/UGPE/ ent of an Plan 07/30/2012 09/15/2012 01/09/14 Multi 2 Ahmed CONT FM LUMP-SUM Prior $ 15 600 yearCon IC Waiss FII consulta 12/19/201 tract Actual 12/24/2012 01/10/2013 (Djibouti) nt 2 Recruitm ent of an Plan Bilane 02/2014/UGPE/ FM Ahmed CONT IC LUMP-SUM Prior 3 000 $ FII consulta Waiss nt Actual 01/10/14 03/31/14 (Djibouti) DJIBOUTI - POWER ACCESS AND DIVERSIFICATION PROJECTPROCUREMENT PLAN</p><p>Hiring of 11/15/201 a Plan 02/15/2013 05/15/2013 2 consultin g service company 05/2013/UGPE/ to design 135 070 € Capgemi CONT a simple QCBS LUMP-SUM Prior ($101 274,64 Consulting FII regulatio ) (France) Actual 16/08/13 22/10/13 11/30/13 03/31/14 n of security stocks manage ment Hiring of Financial Plan 06/12/13 07/10/13 Officier - 08/2013/UGPE/ Additiona CONT l CQS TIME-BASED Prior 15 000 $ FII Financin Actual 11/03/13 11/27/13 g (for YR2013/ 2014) TOTAL $277 670 COST</p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    12 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us