SWTC 2017 Annual Progress Report

SWTC 2017 Annual Progress Report

<p>TO: Phillip Augustin – Chair, WECC Technical Studies Subcommittee</p><p>Doug Tucker – WECC Technical Staff</p><p>FROM: Todd Lichtas, Planning Engineer, Arizona Electric Power Cooperative</p><p>RE: Arizona Electric Power Cooperative – 2017 Annual Progress Report</p><p>DATE: February 28, 2017</p><p>Attached is Arizona Electric Power Cooperative’s 2017 Annual Progress Report to WECC in accordance with WECC Progress Report Policies and Procedures. New facilities and their planned system operation are in conformance with NERC Standards and WECC System Performance Criteria. If you have any questions regarding this, please contact me at (520) 586-5114.</p><p>Sincerely,</p><p>Todd Lichtas TSS Representative Planning Engineer Arizona Electric Power Cooperative 2017 Annual Progress Report to WECC Arizona Electric Power Cooperative (AEPCO)</p><p>The following projects on Arizona Electric Power Cooperative’s System qualify as transmission facilities with voltage levels above 200 kV</p><p>14.4 MVAr Capacitor Bank on Butterfield 230 kV Bus Date of Operation: January 2017</p><p>The Purpose of the project is to provide adequate voltage support for various contingencies in the region on both Arizona G&T’s system and neighboring Tucson Electric Power’s (TEP) system.</p><p>50.0 MVAr Capacitor Bank on Dos Condados 230 kV Bus Estimated Date of Operation: October 2018</p><p>The Purpose of the project is to provide adequate voltage support for various contingencies in the region on both AEPCO’s system and neighboring Tucson Electric Power’s (TEP) system by moving one of the existing capacitors from AEPCO’s Morenci 230 kV bus to AEPCO’s Dos Condados 230 kV bus.</p><p>Second 345/230 kV Transformer at Greenlee substation Estimated Date of Operation: February 2019</p><p>The Purpose of the project is to increase reliability for various contingencies by providing additional transformation at AEPCO’s Greenlee substation. The project will purchase a new 345/230 kV 400 MVA transformer for MW & E Copper Verde substation and relocate one of the existing transformers at Copper Verde to AEPCO’s Greenlee substation.</p><p>Second 345/230 kV Transformer at Bicknell substation Estimated Date of Operation: April 2019</p><p>The Purpose of the project is to increase reliability for various contingencies by providing additional transformation at AEPCO’s Bicknell substation. The project will purchase a new 345/230 kV 400 MVA transformer for MW & E Copper Verde substation and relocate one of the existing transformers at Copper Verde to AEPCO’s Bicknell substation.</p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    3 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us