Natural Resource Project Inventory (NRPI) s8

Natural Resource Project Inventory (NRPI) s8

<p> Last Updated 6/14/02 CONTRACT SUMMARY This information will made available to the public on the State Water Resources Control Board’s (SWRCB) Website (see address below). Use the "tab" and arrow keys to move through the form. If field is not applicable, please put N/A in block. Date filled out:8/15/03 </p><p>A) Contract Information Please use complete phrases/sentences. Fields will expand as necessary as you type. 1. Contract Number: 02-150-252-0 2. Project Title: Citizen Based Water Quality Monitoring and Pollution Control in the Lagunitas Creek Watershed 3. Project Purpose – Problem: (problem being addressed) Impairment of water quality in the Lagunitas Watershed due to pathogens, nutrients and sediment. 4. Project Goals: Develop new TMDL standards; Establish a Creek Response Team; NPS Pollution Monitoring; Educational outreach to improve H20 quality and Implemention of a demonstration restoration project to improve water quality. a. Short-term Goals: Assess water quality and build an informed volunteer water quality monitor base b. Long-term Goals: Reform TMDL limits for the watershed to accurately reflect ambient conditions and improve water quality through projects described above. 5. Project Location: (lat/longs, watershed, etc.) 38,00,15 / 122,40,30 - Lagunitas Watershed a. Physical Size of Project: (miles, acres, sq. ft.,)103sq miles b. Counties included in the project: Marin c. Legislative Districts: (Assembly and Senate) 6th district 6. Which SWRCB program is funding this contract? Please put an "X" by the one that applies. ___ Prop 13 __X_ EPA 319(h) ___ Other </p><p>B) Contract Contact: Refers to contract project director. Name: Reuven Walder Job Title: Watershed Biologist Organization: Salmon Protection and Watershed Webpage Address: www.spawnusa.org Network - SPAWN Address: POB 400, Woodacre, CA 94973 Phone: (415) 488-0370 x102 Fax number: (415) 488-0372 Email: [email protected] C. Contract Time Frame: Refers to the implementation period of the contract. From: August 1, 2003 To: August 31, 2006</p><p>D) Project Partner Information: Name all agencies/groups involved with project. Regional Water Quality Control Board, Tomales Bay Watershed Council. E) Nutrient and Sediment Load Reduction Projection (if applicable): </p><p>PLEASE PROVIDE A HARD COPY AND AN ELECTRONIC COPY TO YOUR CONTRACT MANAGER AND YOUR PROGRAM ANALYST WITH YOUR QUARTERLY/MONTHLY REPORT. ALL APPLICABLE FIELDS ARE MANDATORY. IF FIELD IS NOT APPLICABLE, PLEASE PUT N/A IN BLOCK. INCOMPLETE FORMS WILL BE RETURNED. THE ELECTRONIC VERSION OF THIS FORM CAN BE FOUND AT: http://www.swrcb.ca.gov/nps/319hproj.html.</p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us