16-055 Chisago Kohlman 3 28 0700 to 4 8 1800

16-055 Chisago Kohlman 3 28 0700 to 4 8 1800

<p> TEMPORARY OPERATING INSTRUCTION No. 16-055</p><p>MISO 16-04485-OO 1-09638317 O.O. No. File No. 240803</p><p>Name of 230 kV Line Chisago-Kohlman Outage: 2016-03-28 from 0700 to 2016-04-08 at 1800 CDT Effective Dates: (2016-03-28 from 0700 to 2016-04-08 at 1800 EST) Standing Guide Reference: MHEX – USA Standing Guide</p><p>Description Install new KOL TR10 Reactor of Work:</p><p>TRANSFER LIMITS: MH-USA South (MH Export) Schedule SOL: 2175 Limit 1950</p><p>Transfer Non- Schedule Location TTC RM (SOL) CRSG OM Firm Firm Limit USA 2450 275 2175 150 75 1950 0 1950</p><p>MH-USA North (MH Import) Schedule IROL 1000 SOL: 900 Limit 850</p><p>Transfer Non- Schedule Location TTC RM (SOL) CRSG OM Firm Firm Limit USA 945 45 900 0 550 350 500 850</p><p>TLR South South North North Triggers TLR 1 TLR 3 TLR 1 TLR 3</p><p>2005 2025 837 855</p><p>02a228afb722c21b6d494c0db25a9379.doc Page 1 of 3 TEMPORARY OPERATING INSTRUCTION No. 16-055</p><p>MISO MISO Webtool Webtool Postings Postings TTC TRM Coeff MHEX_S (Export) 2450 500 1.000 MHEX_N (Import) 945 595 0.160</p><p>A) During this prior outage condition generation curtailment of the St. Joseph and St. Special Notes Leon wind farms concurrent with TLR on MHEX_N may be required when to MISO West Manitoba to USA flows are north to prevent post contingent overloads on G37C RC following a trip of B10T or M602F.</p><p>B) The SOL for MHEX_S and MHEX_ N is the same if the MISO RTCA and MISO Flowgate Monitoring Tool is unavailable prior to or during this outage.</p><p>A) TOI Extentions - This TOI may be extended until 23:59 by performing the following Special Instructions to steps: MHEB 1. Verify system conditions to confirm there are no additional tie line facilities Operator: outages, or new internal MH outages. 2. Review RTCA to confirm there are no new contingencies. 3. Contact MISO to confirm there are no new outages, if there are no new outages provide notice to MISO that MH is extending the TOI. 4. Extend the outage in COLA. 5. Update TLAP outage table. 6. Provide notice to affected balancing authorities</p><p>02a228afb722c21b6d494c0db25a9379.doc Page 2 of 3 TEMPORARY OPERATING INSTRUCTION No. 16-055</p><p>Special B) When called upon by MISO for the supply of CRSG: Instructions to MHEB If Real Time Contingency Analysis (RTCA) indicates a post contingent overload Operator condition on Y51L for the contingent loss of D14S - redispatch MH generation to (cont): maintain CRSG delivery as per:</p><p> Start Brandon Gas Generation and run up to 60 MW. Brandon generation must be re-dispatched from HVDC generation at Dorsey</p><p> After 60 MW re-dispatch is complete, should RTCA continues to indicate a post contingent overload condition on Y51L due to the contingent loss of D14S, Continue to re-dispatch generation from Brandon gas in 10 MW increments until post contingent overload on Y51L has been mitigated.</p><p> The mitigation must be completed within 30 minutes.</p><p>Copies to: SOSS, System Control Centre MISO NSSS, System Control Centre GSO, System Control Centre GSSS, System Control Centre</p><p>02a228afb722c21b6d494c0db25a9379.doc Page 3 of 3</p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    3 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us