<p> WORK HEALTH SAFETY & INJURY MANAGEMENT SYSTEMS MANUAL WHSIMS 007</p><p>SAFE WORK METHOD STATEMENT PAGE 1 OF 2</p><p>AUTHORISED BY : AS ISSUE : FOUR</p><p>SAFE WORK METHOD STATEMENT Form 007.2 SAFE WORK METHOD STATEMENT (PART 1)</p><p>Job: DRESSING HORSES’ FEET Document Reference: Saddling</p><p>No: Department: XXXX Racing Stables Revision Date: Section: Manager’s / Trainer’s Approval: Work Area: STABLES Manager’s / Trainer’s Name:</p><p>Key Safety Plant / Equipment / (including Safety Checks / Hazardous Substances P.P.E.)</p><p> Hoof cleaning gear, hoof pick, dressing Physical inspection of tie up area Safe, even, non- slip tie up area Use of appropriate equipment, check for raised nails. Gloves, safety boots Head collar / lead / twine for tying Codes of Practice Legislation: Applicable External Considerations to Work? Y/N Copies of relevant Acts, Regulations, Australian Standards and Codes of Practices can be obtained from WorkCover NSW and/or Standards Australia</p><p>DATE PREPARED : MARCH 2015 REVISION DATE: MARCH 2016 WORK HEALTH SAFETY & INJURY MANAGEMENT SYSTEMS MANUAL WHSIMS 007</p><p>SAFE WORK METHOD STATEMENT PAGE 1 OF 2</p><p>AUTHORISED BY : AS ISSUE : FOUR</p><p>If Yes, state: Weather </p><p>Person/s required to carry out work Duties & Qualifications / Experience / Training required to complete work Responsibilities Nominated person in stable Care and Registered stablehand with horse handling competency and requisite maintenance of training horses</p><p>SAFE WORK METHOD STATEMENT (PART Document Reference: 2)</p><p>Job: DRESSING HORSES FEET No:</p><p>Procedure (in steps) Possible Hazards in Executing Key Safety Controls & Associated Procedures Procedure</p><p>Copies of relevant Acts, Regulations, Australian Standards and Codes of Practices can be obtained from WorkCover NSW and/or Standards Australia</p><p>DATE PREPARED : MARCH 2015 REVISION DATE: MARCH 2016 WORK HEALTH SAFETY & INJURY MANAGEMENT SYSTEMS MANUAL WHSIMS 007</p><p>SAFE WORK METHOD STATEMENT PAGE 1 OF 2</p><p>AUTHORISED BY : AS ISSUE : FOUR</p><p>Prepare appropriate equipment Tripping / spillage Gear safety inspection</p><p>Collect horse from stables Strain / crush injury Correct handling procedures</p><p>Lead horse to tie up area As above Lead at near shoulder hold lead just below clip</p><p>Tie up so assess to both side of horse is Muscle damage / horse pulling Tie up with rubber ring / twine / non slip surface possible back</p><p>Gloves on Lacerations/ chemical contact Apply appropriate PPE/gear</p><p>Pick up hoof Horse taking fright / pulling back / Ensure handler is aware of horse’s temperament – if impact from strike or kick necessary have assistant to hold horse Pick out hoof Sharp raised nails, strain, crush, Safe stance of handler, cleaning away from body and hoof</p><p>Apply dressing Allergies, chemical reactions Use gloves</p><p>Repeat for each hoof</p><p>Untie horse and return to stall Horse pulling away Lead horse correctly with bit in mouth</p><p>Return equipment to tack room Seal containers and store correctly</p><p>Copies of relevant Acts, Regulations, Australian Standards and Codes of Practices can be obtained from WorkCover NSW and/or Standards Australia</p><p>DATE PREPARED : MARCH 2015 REVISION DATE: MARCH 2016 WORK HEALTH SAFETY & INJURY MANAGEMENT SYSTEMS MANUAL WHSIMS 007</p><p>SAFE WORK METHOD STATEMENT PAGE 1 OF 2</p><p>AUTHORISED BY : AS ISSUE : FOUR</p><p>Copies of relevant Acts, Regulations, Australian Standards and Codes of Practices can be obtained from WorkCover NSW and/or Standards Australia</p><p>DATE PREPARED : MARCH 2015 REVISION DATE: MARCH 2016</p>
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages4 Page
-
File Size-