Inspection Summary

Inspection Summary

<p> NSP1-180C-NLV INSPECTION SUMMARY For CNLV Staff ONLY. Property Information</p><p>Property address: ______</p><p>Developer: ______</p><p>Inspector Name:______</p><p>Inspection Date:______</p><p>Start time:______End: ______</p><p>Electric on □ YES □ NO</p><p>Gas on □ YES □ NO</p><p>Water on □ YES □ NO</p><p>Weather:______</p><p>NOTES: ______</p><p>D:\Docs\2017-12-13\08db575c16a1b5f4a2a47f9b7c54855b.doc 4/3/2018 1 NSP1-180C-NLV INSPECTION SUMMARY SITE 1</p><p>Address: 2 3</p><p> y y y r r r o o o g g g e e t e t t a a</p><p> a Deficiency Notes C C</p><p>C</p><p>S S S R R R P P P Lot: Size Setbacks: Front- Rear- Side- Side- Landscaping: Drainage / TreesGrade & Shrubs Ground Cover Fences Gates Trash Storage Retaining Walls Steps City Sidewalk Access Walks</p><p>Irrigation yes no Present: Front Rear Left Side Right Side Operational?</p><p>Pool Height Width Depth Filled Operational? Pool equipment Decking Plumbing Safety barrier</p><p>Spa/Jacuzzi Height Width Depth Filled</p><p>Storage Shed Set back: Rear______Side:______Separation:______size roof material siding material foundation</p><p>D:\Docs\2017-12-13\08db575c16a1b5f4a2a47f9b7c54855b.doc 4/3/2018 2 NSP1-180C-NLV INSPECTION SUMMARY EXTERIOR MAIN STRUCTURE 1 2 Address: 3</p><p> y y y r r r o o o g g g e e t e t t a a</p><p> a Deficiency Notes C C</p><p>C</p><p>S S S R R R P P P Porch/Stoop Location: Foundation Floor/Platform Ceiling/Canopy Hand/Guard Rails Steps Entry Location: Door Storm/Screen Door Frame/Trim Hardware Threshold Weather Stripping Exterior Lighting Entry Location: Door Storm/Screen Door Frame/Trim Hardware Threshold Weather Stripping Exterior Lighting Windows: Glazing Casings/Trim Latches Screens Storms Caulking/Painting General: Foundation Wall Material Roofing Chimneys Vents Fascia/Soffits Patio Door Trim Gutters Downspouts Splash-blocks Patio Cover permitted permit number</p><p>D:\Docs\2017-12-13\08db575c16a1b5f4a2a47f9b7c54855b.doc 4/3/2018 3 NSP1-180C-NLV INSPECTION SUMMARY FOUNDATION 1</p><p>Address: 2 3</p><p> y y y r r r o o o g g g e e t e t t a a</p><p> a Deficiency Notes C C</p><p>C</p><p>S S S R R R P P P Foundation: Foundation Walls Plates & Rim Joist Beams Point Bearing Pad Support Columns Perimeter Ins. Joist: Condition Span Spacing Size Clear Space (6”) General: Floor Vents Chimneys</p><p>Remarks:</p><p>D:\Docs\2017-12-13\08db575c16a1b5f4a2a47f9b7c54855b.doc 4/3/2018 4 NSP1-180C-NLV INSPECTION SUMMARY</p><p>Garage____ Carport____ Accessory Building____ 1 2 Address: 3</p><p> y y y r r r o o o g g g e e t e t t a a</p><p> a Deficiency Notes C C</p><p>C</p><p>S S S R R R P P P Structure: Foundation Floor Apron Walls, interior Joist Rafters Steps Roof & Gutters: Roofing Fascia Soffit Misc. Trim Gutters Downspout Splash-blocks Pedestrian/Service Door: Door Storm/Scrn Door Frame/Trim Hardware Threshold Weather Strip Stoop Caulking & Paint Exterior Lighting Garage Door: Door Frame Trim Hardware Windows Weather Stripping Caulking & Paint Exterior Lighting Mechanical: Heating Electrical Remarks:</p><p>D:\Docs\2017-12-13\08db575c16a1b5f4a2a47f9b7c54855b.doc 4/3/2018 5 NSP1-180C-NLV INSPECTION SUMMARY</p><p>Hall____ Common Area____ 1 2 Address: 3</p><p> y y y r r r o o o g g g e e t e t t a a</p><p> a Deficiency Notes C C</p><p>C</p><p>S S S R R R P P P ROOM/DIMENSIONS: Size Walls Ceiling Ceiling Height Entrances: Doors Jambs Trim Hardware Windows: Casing,Trim,Stools Window Frames Operation Locks Screens Storms Weather strip Glazing Light & Ventilation Fire Escape Painting: Ceiling Walls Trim Flooring: Sub-Floor Underlayment Surface Mechanical/Electrical: Lighting Switches Outlets/GFI Heating Smoke Detector</p><p>Remarks:</p><p>D:\Docs\2017-12-13\08db575c16a1b5f4a2a47f9b7c54855b.doc 4/3/2018 6 NSP1-180C-NLV INSPECTION SUMMARY Kitchen 1 2 Address: 3</p><p> y y y r r r o o o g g g e e t e t t a a</p><p> a Deficiency Notes C C</p><p>C</p><p>S S S R R R P P P ROOM/DIMENSIONS: Size Walls Soffits Ceiling Ceiling Height Entrances: Doors Jambs Trim Hardware Windows: Casing,Trim,Stools Window Frames/Casing/Trim Operational? Locks Screens Cabinets Counter Tops Misc:</p><p>Painting: Ceiling Walls Trim Flooring: Sub-Floor Underlayment Surface Appliances: Range:Gas_Elec__ Range Vent Refrigerator Dishwasher Sink/ Faucets/Stops Microwave Disposal/Waste Mechanical/Electrical: Lighting Switches Outlets/GFI Heating Smoke Detector</p><p>D:\Docs\2017-12-13\08db575c16a1b5f4a2a47f9b7c54855b.doc 4/3/2018 7 NSP1-180C-NLV INSPECTION SUMMARY List Kitchen Remarks on Next Page (Continued)</p><p>Kitchen (Continued) </p><p>REMARKS: List any and all deficiencies through-out room: </p><p>D:\Docs\2017-12-13\08db575c16a1b5f4a2a47f9b7c54855b.doc 4/3/2018 8 NSP1-180C-NLV INSPECTION SUMMARY ______Room 1 2 Address: 3</p><p> y y y r r r o o o g g g e e t e t t a a</p><p> a Deficiency Notes C C</p><p>C</p><p>S S S R R R P P P ROOM/DIMENSIONS: Size Walls Ceiling Ceiling Height Entrances: Doors Jambs & Trim Hardware Windows: Casing,Trim,Stools Window Frames Operation Locks Screens Storms Weather strip Glazing Light & Ventilation Fire Escape Painting: Ceiling Walls Trim Flooring: Sub-Floor Underlayment Surface Mechanical/Electrical: Lighting Switches Outlets/GFI Heating Ventilation Remarks:</p><p>D:\Docs\2017-12-13\08db575c16a1b5f4a2a47f9b7c54855b.doc 4/3/2018 9 NSP1-180C-NLV INSPECTION SUMMARY</p><p>Stairs 1 2 Address: 3</p><p> y y y r r r o o o g g g e e t e t t a a</p><p> a Deficiency Notes C C</p><p>C</p><p>S S S R R R P P P ROOM/DIMENSIONS: Size Walls Ceiling Ceiling Height Entrances: Doors Jambs & Trim Hardware Windows: Casing,Trim,Stools Window Frames Operation Locks Screens Storms Weather strip Glazing Light & Ventilation Fire Escape Painting: Ceiling Walls Trim Stairs: Treads Risers Width Headroom Handrail Guardrail Lighting Remarks:</p><p>D:\Docs\2017-12-13\08db575c16a1b5f4a2a47f9b7c54855b.doc 4/3/2018 10 NSP1-180C-NLV INSPECTION SUMMARY</p><p>Bathroom (______) 1 2 Address: 3</p><p> y y y r r r o o o g g g e e t e t t a a</p><p> a Deficiency Notes C C</p><p>C</p><p>S S S R R R P P P ROOM/DIMENSIONS: Size Walls Ceiling Ceiling Height Entrances: Doors Jambs & Trim Hardware Windows: Casing,Trim,Stools Window Frames Operation Locks Screens Storms Weather strip Glazing Light & Ventilation Fire Escape Painting: Ceiling Walls Trim Flooring: Sub-Floor Underlayment Surface Cabinets: Base Walls Tops Linen Closet Medicine Cabinet Mechanical/Electrical: Lighting Switches Outlets/GFI Heating Ventilation Plumbing: Water Closet Lavatory</p><p>D:\Docs\2017-12-13\08db575c16a1b5f4a2a47f9b7c54855b.doc 4/3/2018 11 NSP1-180C-NLV INSPECTION SUMMARY</p><p>Utilities 1 2 Address: 3</p><p> y y y r r r o o o g g g e e t e t t a a</p><p> a Deficiency Notes C C</p><p>C</p><p>S S S R R R P P P Heating: Furnace(condition) Fuel Capacity Controls Venting Ducting Combustion Air Capacity Electrical: Ground Clearance Main Disconnect Meter Distribution Panel # of Circuits Wiring Type/Cond. Plumbing: Hot Water Heater (condition) Venting T&P Relief Valve Waste Lines Traps Vents Water Shut Off Water Shut Off Water Shut Off Water Meter Gas Meter Gas Lines Water Heater Protection present AC Unit Condensor Connections Tonnage Location</p><p>Remarks:</p><p>D:\Docs\2017-12-13\08db575c16a1b5f4a2a47f9b7c54855b.doc 4/3/2018 12 NSP1-180C-NLV INSPECTION SUMMARY</p><p>Attic 1 2 Address: 3</p><p> y y y r r r o o o g g g e e t e t t a a</p><p> a Deficiency Notes C C</p><p>C</p><p>S S S R R R P P P Attic: Entry Roof Framing Insulation Vents Chimneys Remarks:</p><p>SUMMARY OF MAJOR REPAIRS</p><p>SITE:</p><p>EXTERIOR:</p><p>GARAGE/CARPORT/ACC. BLDG:</p><p>KITCHEN:</p><p>D:\Docs\2017-12-13\08db575c16a1b5f4a2a47f9b7c54855b.doc 4/3/2018 13 NSP1-180C-NLV INSPECTION SUMMARY</p><p>BEDROOM(S):</p><p>Water Heater Manufacture Dates by Serial Number Manufacturers Legends Rheem Disregard letters at beginning Rudd 1st and 2nd numbers = month Richmond (Menards) 3rd and 4th numbers = year GE (Home Depot) Example: RMNG1199D0743 = November 1999 Bangard (W. W. Grangiers Example: 0502F0655 May 2002 A. O. Smith First letter = factory Minnerizer (For Minnegasco until about 2000) 2nd letter = month, A=Jan, M=Dec, etc., letter i is not used 3rd and 4th digits = year Example: MD98-0048353-P38 = April 1998 State 1st letter = month, A=Jan, M=Dec, etc., letter i is not used Kenmore 2nd and 3rd digits = year Reliance Example: J01-128999 = September 2001 Maytag BATHROOM: Apollo American 1st and 2nd numbers = year Craftmaster 3rd and 4th numbers = week Whirlpool Example: 040262311 = The week of January 5th, 2004 Pro Line Envirotemp (Loews) Lochinvar Same as Bradford White Bradford White 1st letter = year, letters i, o, q, r, u, v not used 2nd letter = month Example: TC1234567 = March 1999 A= 1984 B= 1985 C= 1986 D= 1987 E= 1988 F= 1989 G= 1990 H= 1991 J= 1992 UTILITIES/HVAC: K= 1993 L= 1994 M= 1995 N= 1996 P= 1997 S= 1998 T= 1999 W=2000 X= 2001 Y= 2002 Z= 2003 A= 2004 B= 2005 C= 2006</p><p>FOUNDATION:</p><p>Remarks/Additional Major repairs not covered:</p><p>D:\Docs\2017-12-13\08db575c16a1b5f4a2a47f9b7c54855b.doc 4/3/2018 14</p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    14 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us