Annex a Section 2.0 TECHNICAL REQUIREMENTS Project Specification Index (OOK) Contract

Annex a Section 2.0 TECHNICAL REQUIREMENTS Project Specification Index (OOK) Contract

<p> Annex A Section 2.0 – TECHNICAL REQUIREMENTS Project Specification Index (OOK) Contract No. 07-959-PH-136 1 / 3</p><p>Appendix A Employer’s Documentation List REV 7 In total 136 project specifications Drawings Sec DOCUMENT NO. TITLE STATU REVISION Se DOCUMENT NO. TITLE REVISION REV HARDCOP ELECTRONIC REV HARDCO ELECTRONI S AT AT c AT TO Y FILE TO PY C FILE EFF. EFFECTIV EFFECTIV DATE MISSING MISSING DATE MISSING MISSING DATE E DATE E DATE MD-101-1000-EG-GE-CRT- GENERAL ENGINEERING DESIGN CRITERIA A01 A01 1 DRAWINGS 0006 MD-502-3000-EG-GE-DPP- ISBL PLANT AREA PLOT PLAN (CURRENTLY UNDER MD-101-1000-EG-IN-CRT- INSTRUMENTATION AND CONTROL DESIGN CRITERIA A04 A02 A01 A01 0015 REVIEW) 0001 MD-502-3000-CN-GE-DSK- CONSTRUCTION VILLAGE P06 P06 MD-101-1000-EG-ME-CRT- FIRE PROTECTION ENGINEERING DESIGN CRITERIA 0001 0001 TO BE RELEASED SOON 1 X X NOT AVAILABLE SIMILAR DOCUMENT WITH NUMBER: MD-101-00-00-EG-MS-CRT- Plans, Procedures, Specifications & Other Documentation 0001 RECEIVED AS AN E-MAIL ATTACHMENT Sec DOCUMENT NO. TITLE STATU REVISION MD-101-1000-EG-ME-CRT- ROTATING MACHINERY SELECTION AND APPLICATION CRITERIA REV HARDCOP ELECTRONIC A01 A01 S AT AT 0002 TO Y FILE EFF. EFFECTIV MD-101-1000-EG-ME-CRT- MECHANICAL SYSTEMS DESIGN CRITERIA DATE MISSING MISSING A02 A02 DATE E DATE 0003 2 CONSTRUCTION MD-101-1000-EG-ST-CRT- BLAST RESISTANT DESIGN CRITERIA A01 2 A01 MD-101-1000-CN-GE-PLN- MANAGEMENT OF CONSTRUCTION LABOR PLAN 0001 A01 1 A01 0002 MD-101-1000-EG-ST-CRT- STRUCTURAL DESIGN CRITERIA A01 A01 MD-101-1000-CN-GE-PLN- EPC CONTRACTORS BASIC ENGINEERING CONSTRUCTABILITY 0002 A01 A01 0003 PROGRAM MD-101-1000-EG-ST-CRT- FIREPROOFING DESIGN CRITERIA A01 A01 MD-101-1000-CN-GE-PLN- EPC CONTRACTORS DETAILED ENGINEERING 0003 A01 1 A01 0004 CONSTRUCTABILITY PROGRAM MD-101-1000-EG-PI-DEG- PIPING DESIGN GUIDE A01 A01 MD-101-0000-CN-GE-PRO- SITE ACCESS, RULES AND REGULATIONS PROCEDURE 0001 A01 A01 0001 MD-101-1000-EG-ST-DEG- ANCHOR BOLT DESIGN GUIDE A01 3 A01 MD-101-1000-CN-GE-PRO- SUPPLY OF CONSTRUCTION SITE OFFICES & ANCILLARY 0001 A01 1 A01 0004 SERVICES FOR USE BY OWNER/PMC PERSONNEL MD-101-1000-EG-EL-PHD- ELECTRICAL DESIGN PHILOSOPHY FOR EMERGENCY POWER A01 A01 MD-101-1000-CN-GE-PRO- TEMPORARY WORKS PROCEDURE 0001 SYSTEMS A01 A01 0005 MD-101-1000-EG-GE-PLN- PLANT DESIGN SYSTEMS (PDS) EXECUTION PLAN A01 2 A01 MD-101-1000-CN-GE-PRO- RULES AND REGULATIONS FOR OWNER PROVIDED 0002 A01 1 A01 0007 CONSTRUCTION CAMP PROCEDURE MD-101-1000-EG-GE-PRO- EQUIPMENT IDENTIFICATION & TAG NUMBERING PROCEDURE A01 2 A01 MD-101-1000-CN-GE-SPC- CONSTRUCTION CAMP SPECIFICATION 0001 A01 1 A01 0001 MD-101-1000-EG-GE-PRO- HAZARD & OPERABILITY STUDIES FOR CONTROL SYSTEMS A01 A01 MD-SPC-EG-GE-0004 CONSTRUCTION CAMP 0005 (CHAZOPS) Supersed MD-101-1000-EG-GE-PRO- HAZOP GUIDELINE PROCEDURE 1 1 Superseded A01 1 A01 MD-101-1000-CN-GE-SPC- SUPERSEDED BY MD-101-1000-CN-GE-SPC-0001 ed 0006 0001 MD-101-1000-EG-GE-PRO- MICROSTATION V8 CAD SYSTEM INSTALLATION & USER GUIDE A01 2 A01 3 DOCUMENT CONTROL 0007 MD-101-0000-DC-GE-PRO- BUSINESS IDENTIFICATION PROJ. CODE & PLANT BREAKDOWN MD-101-1000-EG-GE-PRO- SAFETY INTEGRITY LEVEL (SIL) DETERMINATION A01 A01 A01 1 A01 0001 STRUCT. PROC. 0017 MD-101-0000-DC-GE-PRO- DOCUMENT NUMBERING PROCEDURE MD-101-1000-EG-PR-PRO- P&ID DRAFTING PROCEDURE A01 A01 A01 3 A01 0002 0001 MD-101-0000-DC-GE-PRO- DOCUMENT CONTROL PROCEDURES MD-500-1000-EG-PR-BOD- PROCESS BASIS OF DESIGN A01 A01 0003 0001 TO BE RELEASED SOON 1 P01 X X NOT AVAILABLE MD-101-0000-DC-GE-PRO- PROJECT DOCUMENTS & DATA DISTRIBUTION SIMILAR DOCUMENT WITH THE SAME NUMBERING RECEIVED AS A01 A01 0004 AN E-MAIL ATTACHMENT MD-101-0000-DC-GE-PRO- EPC CONTRACTORS DOCUMENT PROCEDURE MD-502-1000-EG-GE-LST- PROJECT 502 CHEMICAL COMPLEX PLANT/UNIT IDENTIFIERS A01 A01 A01 A01 0006 0001 MD-101-0000-DC-GE-PRO- TECHNICAL QUERIES / REQUEST FOR INFORMATION PROCEDURE MD-101-1000-EG-AR-SPC- ARCHITECTURAL BUILDING MATERIAL SPECIFICATION A01 A01 A02 2 A01 0007 0001 4 OPERATIONS & MAINTENANCE MD-101-1000-EG-AR-SPC- PLANT BUILDING SPECIFICATIONS 0002 TO BE RELEASED SOON 1 -- X X MD-101-0000-OM-GE-PRO- EPC OPERATOR AND MAINTENANCE TRAINING PROCEDURE A01 A01 NOT AVAILABLE 0001 MD-101-00-00-EG-AP-SPC- PLANT BUILDING SPECIFICATIONS 5 ENGINEERING Supersed 0002 A01 A01 Superseded ed MD-101-1000-EG-CV-CRT- CIVIL DESIGN CRITERIA A01 2 A01 SUPERSEDED BY MD-101-1000-EG-AR-SPC-0002 0001 MD-101-1000-EG-CS-SPC- COMMON FUNCTIONAL DESIGN SPECIFICATION FOR THE MD-101-1000-EG-EC-CRT- INFORMATION SYSTEMS TECHNOLOGY - ENGINEERING DESIGN 3 3 A01 A01 0001 DISTRIBUTED CONTROL SYSTEM 0001 CRITERIA MD-101-1000-EG-CS-SPC- COMMON SPECIFICATION FOR THE SAFETY INSTRUMENTED MD-502-1000-EG-EL-CRT- ELECTRICAL DESIGN CRITERIA A01 A01 0002 SYSTEM 2 0003 Supersed 2 Superseded MD-101-1000-EG-EN-CRT- ENVIRONMENTAL DESIGN CRITERIA ed A01 A01 MD-101-1000-EG-CS-SPC- SUPERSEDED BY: CFDS FOR SIS_MD-101-1000-EG-CS-SPC-0003 A01 0001 0003 MD-101-1000-EG-GE-CRT- GEOGRAPHIC, CLIMATIC AND SEISMIC DATA CRITERIA A01 2 A01 MD-101-1000-EG-CS-SPC- COMMON FUNCTIONAL DESIGN SPECIFICATION FOR THE SAFETY A01 -- Transmitt Transmittal 0001 0003 INSTRUMENTED SYSTEM al No. & No. & Date</p><p>Legend: 1 Status Not scrutinised by OTO prior to effective date P01, P02, P03, P04 in-house revision status prior to issue to contractor 2 Status TQ’s outstanding at the time of effective date By: JPQ / IHL Date: 1st of September 2007 3 Status Outotec may substitute with approved O specs Annex A Section 2.0 – TECHNICAL REQUIREMENTS Project Specification Index (OOK) Contract No. 07-959-PH-136 2 / 3</p><p>Appendix A Employer’s Documentation List REV 7 In total 136 project specifications Sec DOCUMENT NO. TITLE STATU REVISION Sec DOCUMENT NO. TITLE STATU REVISION REV HARDCOP ELECTRONIC REV HARDCOP ELECTRONIC S AT AT S AT AT TO Y FILE TO Y FILE EFF. EFFECTIV EFF. EFFECTIV DATE MISSING MISSING DATE MISSING MISSING DATE E DATE DATE E DATE NOTE: PROJECT CONTRACT DOESN’T INCLUDE A SPECIFICATION Date from from MD-101-1000-EG-GE-SPC- PAINTING AND COATINGS C01 2 A01 WITH THIS NUMBER Ma’aden! Ma’aden! 0001</p><p>MD-101-1000-EG-CV-SPC- SITE PREPARATION, EXCAVATION AND BACKFILL SPECIFICATION MD-500-1000-EG-GE-SPC- SMART PLANT INSTRUMENTATION PROJECT SPECIFICATION A02 2 A01 A01 1 -- 0001 0001 MD-500-1000-EG-CV-SPC- WASTEWATER COLLECTION AND TREATMENT MD-500-1000-EG-GE-SPC- SMART PLANT ELECTRICAL PROJECT SPECIFICATION A01 A01 A01 1 -- 0001 0002 MD-101-1000-EG-CV-SPC- FABRICATION AND INSTALLATION OF CHAIN LINK FENCE AND MD-500-1000-EG-GE-SPC- SMART PLANT P&ID PROJECT SPECIFICATION A01 2 A01 A01 1 -- 0002 GATES 0003 MD-101-1000-EG-CV-SPC- ROADWAY AND AREA PAVING CONSTRUCTION MD-101-1000-EG-GE-SPC- POTABLE WATER SUPPLY A02 2 A01 A01 A01 0003 0003 MD-101-1000-EG-CV-SPC- TOPOGRAPHIC AND PLANT SURVEYS MD-101-0000-EG-GE-SPC- ENGINEERING, SYSTEM, DOCUMENT & DATA HANDOVER A01 A01 A01 A01 0004 0006 SPECIFICATION MD-101-1000-EG-CV-SPC- UNDERGROUND GRAVITY SEWERS MD-101-1000-EG-HV-SPC- HVAC EQUIPMENT AND INSTALLATION SPECIFICATION A01 2 A01 A01 2 A01 0005 0001 MD-101-1000-EG-CV-SPC- GEOTECHNICAL INVESTIGATION MD-101-1000-EG-IN-SPC- INSTRUMENT INSTALLATION SPECIFICATION A01 A01 A02 1 A01 0007 0003 MD-101-1000-EG-CV-SPC- SOIL IMPROVEMENT MD-101-1000-EG-IN-SPC- ELECTRICAL AND INSTRUMENTATION PACKAGE EQUIPMENT A01 1 A01 A01 A01 0009 0005 SPECIFICATION MD-101-1000-EG-EC-SPC- PLANT SITE COMMUNICATION SYSTEM SPECIFICATION MD-101-1000-EG-IN-SPC- FLOW INSTRUMENT SPECIFICATION A01 A01 A01 A01 0001 0006 MD-101-1000-EG-EL-SPC- 4.16KV AND 13.8KV ELECTRICAL MOTORS SPECIFICATION MD-101-1000-EG-IN-SPC- LEVEL INSTRUMENT SPECIFICATION A01 A01 A01 A01 0001 0007 MD-101-1000-EG-EL-SPC- 34.5KV SWITCHGEAR SPECIFICATION MD-101-1000-EG-IN-SPC- PRESSURE INSTRUMENT SPECIFICATION A01 2 A01 A01 A01 0002 0008 MD-101-1000-EG-EL-SPC- LOW VOLTAGE ELECTRIC MOTORS SPECIFICATIONS MD-101-1000-EG-IN-SPC- TEMPERATURE INSTRUMENT SPECIFICATION A01 2 A01 A01 A01 0003 0009 MD-101-1000-EG-EL-SPC- POWER DISTRIBUTION TRANSFORMERS SPECIFICATION MD-101-1000-EG-IN-SPC- CONTROL VALVES SPECIFICATION A01 A01 A01 P01 0004 0010 MD-101-1000-EG-EL-SPC- 4.16 KV SWITCHGEAR AND MOTOR CONTROLLER SPECIFICATION MD-101-1000-EG-IN-SPC- PRESSURE RELIEF VALVE SPECIFICATION A01 2 A01 A01 A01 0005 0011 MD-101-1000-EG-EL-SPC- FIBER OPTIC FENCE SENSOR SYSTEM (FOFSS) MD-101-1000-EG-IN-SPC- PROCESS ANALYZERS A01 A01 A01 A01 0006 0014 MD-101-1000-EG-EL-SPC- 480V SWITCHGEAR AND MOTOR CONTROL CENTER (MCC) MD-101-1000-EG-IN-SPC- FIRE ALARM AND GAS DETECTION SYSTEM A01 2 A01 A01 A01 0007 SPECIFICATION 0015 MD-101-1000-EG-EL-SPC- ELECTRICAL AND INSTRUMENTATION EARTHING SYSTEMS MD-101-1000-EG-IN-SPC- MOTOR CONTROL SPECIFICATION A01 2 A01 A01 A01 0010 SPECIFICATION 0016 MD-101-1000-EG-EL-SPC- ELECTRICAL AND INSTRUMENTATION CABLES SPECIFICATION MD-101-1000-EG-ME-SPC- SHELL AND TUBE HEAT EXCHANGERS SPECIFICATION A02 A01 A01 2 A01 0014 0001 MD-101-1000-EG-EL-SPC- ELECTRICAL AND INSTRUMENTATION INTERFACE MD-101-1000-EG-ME-SPC- PRESSURE VESSELS SPECIFICATION A01 A01 A01 2 A01 0015 0002 MD-101-1000-EG-EL-SPC- POWER FACTOR CORRECTION EQUIPMENT MD-101-1000-EG-ME-SPC- DUST COLLECTION & FUME EXHAUST DUCT WORK A01 1 A01 A01 2 A01 0019 0003 SPECIFICATION MD-101-1000-EG-EL-SPC- GENERAL SPECIFICATION FOR ELECTRICAL INSTALLATION MD-101-1000-EG-ME-SPC- PNEUMATIC EQUIPMENT SUPPLIED WITH MECHANICAL A02 A01 A01 A01 0018 0004 PACKAGES SPECIFICATION MD-101-1000-EG-EL-SPC- RING MAIN DISTRIBUTION UNIT MD-101-1000-EG-ME-SPC- CENTRIFUGAL PUMPS SPECIFICATION A01 A01 A01 A01 0020 0007 MD-101-1000-EG-EL-SPC- AC UNINTERRUPTIBLE POWER SYSTEMS (UPS) UNITS MD-101-1000-EG-ME-SPC- HYDRAULIC EQUIPMENT SUPPLIED WITH MECHANICAL A01 A01 A01 A01 0022 0008 PACKAGES SPECIFICATION MD-101-1000-EG-EL-SPC- EMERGENCY AC GENERATOR SET (DIESEL ENGINE) MD-101-1000-EG-ME-SPC- STEEL STORAGE TANKS SPECIFICATION A01 A01 A01 A01 0023 0009 MD-101-1000-EG-EL-SPC- NEUTRAL EARTHING RESISTOR SPECIFICATION MD-101-1000-EG-PI-SPC- PLANT LAYOUT, SPACING & CLEARANCES A01 A01 A02 2 A01 0024 0001 MD-101-1000-EG-EL-SPC- DC POWER SUPPLY UNITS MD-502-1000-EG-PI-SPC- PIPING, FABRICATION & INSTALLATION A01 A01 0025 0001 Supersed P01 3 P01 Superseded ed MD-101-1000-EG-EL-SPC- ELECTRIC DESIGN PHILOSOPHY FOR EMERGENCY POWER SUPERSEDED BY: MD-101-1000-EG-PI-0007 (TO BE RELEASED 0028 SYSTEMS P01 MD-101-1000-EG-PI-0007 SOON) Supersed P01 Superseded MD-101-1000-EG-PI-SPC- PIPING SUPPORTS SPECIFICATION ed A01 3 P01 MD-101-1000-EG-EL-PHD- SUPERSEDED BY: MD-101-1000-EG-EL-PHD-0001 A01 0002 0001 MD-101-1000-EG-PI-SPC- THERMAL & ACCOUSTIC INSULATION SPECIFICATION A02 3 A01 MD-101-1000-EG-EN-SPC- NOISE CONTROL 0004 A01 2 A01 0001 Legend: 1 Status Not scrutinised by OTO prior to effective date P01, P02, P03, P04 in-house revision status prior to issue to contractor 2 Status TQ’s outstanding at the time of effective date By: JPQ / IHL Date: 1st of September 2007 3 Status Outotec may substitute with approved O specs Annex A Section 2.0 – TECHNICAL REQUIREMENTS Project Specification Index (OOK) Contract No. 07-959-PH-136 3 / 3</p><p>Appendix A Employer’s Documentation List REV 7 In total 136 project specifications Sec DOCUMENT NO. TITLE STATU REVISION Sec DOCUMENT NO. TITLE STATU REVISION REV HARDCOP ELECTRONIC REV HARDCOP ELECTRONIC S AT AT S AT AT TO Y FILE TO Y FILE EFF. EFFECTIV EFF. EFFECTIV DATE MISSING MISSING DATE MISSING MISSING DATE E DATE DATE E DATE MD-101-1000-EG-PI-SPC- GENERAL VALVES SPECIFICATION A01 2 A01 0007 0005 SUPERSEDED BY: MD-101-0200-MM-GE-SPC-0001 MD-502-1000-EG-PI-SPC- PIPING MATERIAL CLASSES SPECIFICATION P04 2 P04 MD-101-0200-MM-GE-SPC- 0006 0001 MD-101-1000-EG-PI-SPC- PIPING, FABRICATION & INSTALLATION MD-101-0200-MM-GE-SPC- MATERIAL MANAGEMENT PACKING MARKING AND SHIPPING Transmitt Transmittal 0007 TO BE RELEASED SOON 0001 DOCUMENTATION SPECIFICATION al No. & No. & Date P01 1 P01 X X A01 -- NOT AVAILABLE SIMILAR DOCUMENT WITH THE SAME NUMBERING RECEIVED AS NOTE: PROJECT CONTRACT DOESN’T INCLUDE A SPECIFICATION Date from from AN E-MAIL ATTACHMENT WITH THIS NUMBER Ma’aden! Ma’aden! MD-101-1000-EG-ST-SPC- DRIVEN PILES A01 A01 10 QUALITY CONTROL 0001 MD-101-0000-QD-CO-PRO- SITE CONTRACTOR AND SUB-CONTRACTOR INSPECTION MD-101-1000-EG-ST-SPC- CAST-IN-PLACE CONCRETE PILES A02 A02 A01 A01 0001 VERIFICATION PROCEDURE 0002 MD-101-0000-QD-GE-PRO- POSITIVE MATERIAL IDENTIFICATION (PMI) PROCEDURE MD-101-1000-EG-ST-SPC- FABRICATION OF STRUCTURAL AND MISCELLANEOUS STEEL A02 A02 A01 3 A01 0002 0003 MD-101-0000-QD-SQ-PRO- STANDARD SUPPLIER QUALITY INSPECTION REQUIREMENTS MD-101-1000-EG-ST-SPC- ERECTION OF STRUCTURAL AND MISCELLANEOUS STEEL A02 A02 A01 A01 0001 PROCEDURE 0004 MD-101-1000-EG-ST-SPC- NON-SHRINK CEMENTITIOUS GROUT A01 A01 0006 MD-101-1000-EG-ST-SPC- EPOXY GROUT A01 A01 0007 MD-101-1000-EG-ST-SPC- PLAIN AND REINFORCED CONCRETE A01 A01 0008 MD-101-1000-EG-ST-SPC- FABRICATION AND INSTALLATION OF ANCHOR BOLTS A01 A01 0011 MD-101-1000-EG-CV-STD- STORAGE TANK FOUNDATION STANDARD A01 A01 0001 MD-101-1000-EG-PI-STD- PIPING STANDARDS A01 3 -- 0002 6 HSE MD-101-1000-PM-EN-PLN- ENVIRONMENTAL PROTECTION PLAN 0002 TO BE RELEASED SOON 1 -- X X NOT AVAILABLE MD-101-0000-HS-HS-SFD- HSE MANAGEMENT PLAN A02 A02 0001 MD-101-0000-HS-HS-SFD- PROJECT HSE STANDARDS A01 1 A01 0002 MD-101-0000-HS-HS-SFD- HSE COMMUNICATION AND CONSULTATION. A01 A01 0006 7 PROJECT CONTROLS MD-500-0000-PC-CT-PRO- PROGRESS REVIEW & CERTIFICATION - CONTRACTOR A03 A02 0001 REQUIREMENTS MD-500-0000-PC-CT-PRO- PLANNING AND SCHEDULING - CONTRACTOR REQUIREMENTS A02 A02 0003 MD-500-0000-PC-CT-PRO- PROJECT REPORTING - CONTRACTOR REQUIREMENTS A02 A02 0004 MD-500-0000-PC-CT-PRO- PROGRESS MEASUREMENT - CONTRACTOR REQUIREMENTS A02 A02 0005 MD-500-0000-PC-CT-PRO- CHANGE MANAGEMENT - CONTRACTOR REQUIREMENTS A03 A03 0006 MD-500-0000-PC-CT-PRO- PROJECT MILESTONES - CONTRACTOR REQUIREMENTS A02 A02 0007 8 PROJECT MANAGEMENT MD-101-1000-PM-GE-PRO- PROCEDURE FOR VALUE ENGINEERING 0002 TO BE RELEASED SOON 1 -- X X NOT AVAILABLE MD-502-5000-PM-GE-LST- CONTRACTOR REQUIREMENTS DOCUMENT LIST (CDRL) PHASE II 0001 – SULPHURIC ACID PLANT A01 A01</p><p>9 MATERIALS MANAGEMENT</p><p>MD-101-0200-MM-GE-SPC- PACKING AND SHIPPING DOCUMENTATION SPECIFICATION A01 A01 Supersed Superseded ed Legend: 1 Status Not scrutinised by OTO prior to effective date P01, P02, P03, P04 in-house revision status prior to issue to contractor 2 Status TQ’s outstanding at the time of effective date By: JPQ / IHL Date: 1st of September 2007 3 Status Outotec may substitute with approved O specs</p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    3 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us