<p> Stormwater Audit Checklist Campus: Audit Date: Auditor: Yes No n/ comments a Documentation 1 Is the SWPPP available onsite? 2 Is a copy of the general permit available onsite? 3 Is the NOI available onsite? 4 Is the DHEC Coverage Letter available onsite? 5 Does the SWPPP include a list of co- permittee agreements or contractor certification statements? 6 Does the permittee follow one of the following inspections schedules? Once every 7 calendar days Once every 14 calendar days and within 24 hours of the end of a storm event of 0.5 inches or more. 7 Are inspection records being retained with the SWPPP? 8 Are inspections being completed by “qualified personnel for 1 acre or more? 9 Were any major modifications made to the SWPPP and/or site since the last inspection/audit? 1 If yes, was DHEC approval received to 0 perform the modifications? 1 Are all deficiencies corrected within a 1 timely manner? Site Review 1 Are litter, construction debris, oils, fuels, building products and construction chemicals being properly addressed and/or removed? 2 Are all sediment and erosion control devices, as indicated on the plans, installed and maintained throughout the site, such as silt fence, rock check dams, sediment traps and basins? 3 Are all storm water control devices, as indicated on the plans, installed and maintained throughout the site, such as detention ponds, swales, outlet protection, etc,? 4 Are disturbed areas grassed and/or stabilized within 14 days? USC EHS Office of Environmental Management Destroy Previous Revisions EHS-F-182 Issue Date: 6/18/07 Page 1 of 2 Reviewed: ______5 For areas of final stabilization, has 70% uniform coverage been achieved? 6 Is the area free of active erosion? 7 Were there any offsite impacts, and if so, to which of the following? Public right of way Adjoining property owner Wetlands Creek/river Lake/pond other 8 Is the construction entrance/exit properly installed according to plans? 9 Is the perimeter silt fence and/or other controls properly installed? 1 Did any BMPs operate as designed or prove 0 adequate? 1 Is the number of BMPs sufficient? 1 1 Are all BMPs properly maintained? 2 1 Is construction activity following the 3 phasing and sequencing plan? 1 Have temporary stabilization measures been 4 installed within 14 days when construction activity on the site ceased for 14 days or more?</p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us