Construction Specification

Construction Specification

<p> CONSTRUCTION SPECIFICATION</p><p>202. SEWAGE PUMP</p><p>1. SCOPE</p><p>The work shall consist of the installation of a pump necessary for performing the work required under this contract.</p><p>2. MATERIALS</p><p>A complete sewage pump and all its appurtenances for operation shall be used for this contract. The pump shall be submersible, and capable of passing 1-1/2 inch solids, at a flow rate of 500–1600 gallons per hour, at 25 feet of head. The inlet and outlet pipe of the pump sump shall be of 2-inch” PVC Schedule 80 pipe.</p><p>3. PLACEMENT METHODS</p><p>Sewage pump shall be placed in the concrete sump unit as shown on the drawings and in accordance to the manufacturer’s specification.</p><p>4. PAYMENT</p><p>For items of work, for which specific unit prices are established in the contract, payment will be measured on the unit price of the pump.</p><p>Payment for the pump unit will be made at the contract unit price. Such payment will constitute full compensation for all items necessary and incidental to the completion of the work, except items listed for payment elsewhere in the contract.</p><p>NRCS – Pacific Basin 202-1 5/99</p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us