City of Thunder Bay Contract Documents Manual s1

City of Thunder Bay Contract Documents Manual s1

<p>City of Thunder Bay Section 02530 SPECIFICATION FOR LANDSCAPING Contract No. Page 1 of 3</p><p>1 INTENT</p><p>This section covers the planting of seed, sod, trees and vegetation.</p><p>2 PRODUCTS</p><p>Topsoil – OPSS 802 Material supplied to be within the following parameters:</p><p> pH 6.5 – 8.0 organic matter 5 – 10% Available Nitrogen 20 – 40 mg/kg Phosphate 40 – 50 mg/kg Potassium 75 – 110 mg/kg</p><p>Provide samples prior to use and provide product certificates from certified lab indicating materials comply with specified performance criteria and physical requirements. The City reserves the right to further test material. Additives such as bone meal, manure, limestone, etc., will be permitted to meet topsoil objectives; however, chemical fertilizers should not be applied.</p><p>Seed and Cover – OPSS 804 (Except that seed mix shall be 40% Kentucky Blue Grass, 45% Perennial Rye, 15% Creeping Red Fescue with an application rate of 225 kg/ha. Fertilizer shall be 8-32-16 with an application rate of 10 kg/100 sq.m.)</p><p>Sod – OPSS 803 (Except that fertilizer shall be 8-32-16 with an application rate of 10 kg/ 100 sq.m.)</p><p>Fertilizer containing phosphorus shall be applied subsurface, when seeding or sodding, by mixing it into the top layer of topsoil.</p><p>Note: Add to specification if shrubs, etc., are included in the contract.</p><p>2.1 TREES</p><p>Trees shall be Nursery grown, first grade (Number 1) stock and meet specifications of the latest edition of the Canadian Standards for Nursery Stock. Trees will be proven hardy to Canadian Plant Hardiness Zone 3A or 3B or better. Trees shall be of the species and size indicated in the Contract. Depending on species, the minimum caliper will be either 50 mm or 60 mm, measured 300 mm above final grade, with heights of 2,500 to 3,400 mm. Trees shall be deemed healthy as per Guidelines and Specifications for the Planting of Municipal Trees.</p><p>3 EXECUTION</p><p>3.1 PLACING OF TOPSOIL City of Thunder Bay Section 02530 SPECIFICATION FOR LANDSCAPING Contract No. Page 2 of 3</p><p>OPSS 802</p><p>Depth: 75 mm</p><p>3.2 SEED AND COVER</p><p>OPSS 804</p><p>3.3 PLACING OF SOD</p><p>OPSS 803; stake sod on slopes greater than 3:1.</p><p>On streets where there are existing sidewalks, remove all existing sod between the sidewalk and the new curb and gutter except within the tree protection zone of existing boulevard trees or as directed by Contract Administrator. Only topdress and seed within tree protection zone. Re-grade the area in order to place new sodding. In areas where no sidewalks exist remove as directed by the Contract Administrator. (Edit to suit.)</p><p>If the 30 day maintenance period extends after October 15th, the portion of the period after October 15th will continue the following year after May 15th. </p><p>3.4 PLANTING OF TREES</p><p>Plant trees at locations shown on the Drawings or as directed by the Contract Administrator, in accordance with Standard Drawing No. M-104-3 and the City of Thunder Bay Parks Division Guidelines and Specifications.</p><p>Place trees in accordance with Guideline setbacks for above and below-ground structures except when otherwise approved by the Contract Administrator. </p><p>Warranty trees for two years from the date of planting. Replace non-healthy trees during the warranty period. Prune dead or broken branches at the end of the warranty period as directed by Contract Administrator. </p><p>Remove debris and excess soil immediately upon planting of trees. </p><p>4 MEASUREMENT FOR PAYMENT / BASIS OF PAYMENT</p><p>4.1 SEED AND COVER (See Note 1)</p><p>OPSS 804, except that the unit price bid for this Item shall include fine grading. </p><p>Note: Edit if topsoil required.</p><p>4.2 SOD (See Note 1) City of Thunder Bay Section 02530 SPECIFICATION FOR LANDSCAPING Contract No. Page 3 of 3</p><p>OPSS 802, except that the unit price bid for this Item shall include fine grading and the supply and placing of topsoil. </p><p>Measurements shall be taken of the area of sod placed upon completion of the work. </p><p>Note 1:</p><p>For each contract, clearly define for each street the extent to which payment will/will not be made for seed/sod restoration.</p><p>4.3 TREES </p><p>The unit price bid per tree shall include excavation, supply and placing of planting, fertilizing, watering, staking, pruning, mulching, and dead wood pruning. </p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    3 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us