Document Change Record

Document Change Record

<p> Rail Design Request Form</p><p>Attention: MGF DESIGN SERVICES LTD Tel: 01942 402 704 Fax: 01942 402 766 Email: [email protected] General Details Preferred Contact for Design: Phone call prior to starting design: Status of scheme: CRM Project Ref (MGF):</p><p>Rep Customer Yes No Live Tender </p><p>MGF Representative Name: Date requested: Date design required: Date kit required on site:</p><p>Customer: Main Contractor & Client:</p><p>Site: Scheme title:</p><p>Site Contact (name): Tel: Email:</p><p>Temporary Works Co-ordinator (name): Tel: Email:</p><p>Contractor’s Responsible Engineer CRE (name): Tel: Email: (responsible for the Temporary Works) </p><p>Excavation details (All dimensions are in metres) Note: Please provide all relevant drawings including GA, section(s) plus any other as appropriate. If none available, Scheme Type: provide detailed hand sketches.</p><p>Cofferdam Single sided Trench Frame only Other (state) </p><p>Excavation depth: Over-dig included? Plan dimensions: Sheet to Yes No she et Muck to muck Inside (Note: 0.3m recommended) fra me( s) Clearance required below lowest frame/strut: Clearance required between frames/struts (in plan): </p><p>Ground Conditions Ground conditions described by: (indicate documents attached) SI Report BH / TP Log BH / TP Location Plan Verbal Soil Description Other (state) </p><p>Note: For verbal soil descriptions use Verbal Soil Description Form ED/QF002. MGF cannot provide cantilever solutions without a relevant Borehole. Nearest BH/TP: Distance from excavation: BH/TP Datum: Commencing Level:</p><p>Existing GL: Existing Slope: Topsoil Strip / Ground reduction / Batter (details):</p><p>Document is uncontrolled when printed. Printed copies are for information only. Page 1 of 4 Rail Design Request Form</p><p>Groundwater Level: Piezometer Readings: Local Influences (e.g. Well Pointing? tidal/flood): Yes No Level: </p><p>Document is uncontrolled when printed. Printed copies are for information only. Page 2 of 4 Rail Design Request Form</p><p>Additional Information Note: Please provide photographs of the site in support of the below information where possible. External Loading (Plant /Site traffic): At Distance:</p><p>Up to 30Te Up to 45Te Up to 60Te Other (state) </p><p>Adjacent Structures / Cranes / Roads / Railways / Embankments / Water Courses / Spoil / Materials: At Distance:</p><p>Adjacent Services / Infrastructure/ Overhead Cables: At Distance:</p><p>Anticipated duration of excavation: Notes: < 6 weeks < 12 weeks > 12 weeks</p><p>Are the Temporary Works to be installed during a full rail track possession? Yes No Details if No: </p><p>Are the Temporary Works to be subject to live rail loadings? </p><p>Yes No Details if Yes: RU Loading (50kN/m²) RL Loading (30kN/m²) Other: </p><p>Are any residual risks identified by permanent works designer or construction team for consideration in the Temporary Works Design? Yes No Details if Yes: </p><p>Are there any restraints regarding deflection or settlement? Yes No Details if Yes: </p><p>Is the Form 2 for the Permanent Works Available? Are there photos of the Temporary Works location? Yes No Yes No Method of Working Installation of sheets (method): Using (machine type): </p><p>Pre-Drive Dig & Push Slit Trench Dig & Drop Excavator Hammer Other (state) </p><p>Maximum (anticipated) achievable Construction sequence: toe: Leap frog frames 2 stage construction (concrete base thickness )</p><p>Preferred solution: Boxes Sheets & Frame(s) Cantilever sheets Back to back frames Knee braces Cross struts </p><p>Safety Ancillary’s (Edgesafe, Laddersafe, Davit) Other (state) GRiPSHORE Preferred solution:</p><p>Trench Boxes Modular Boxes Vertishore Vertishore c/w Backing Boards Sheet & Waler(s) Network Rail Approval Note: Please confirm if this design is subject to Network Rail Approval and if MGF are required to complete a F002 and/or F003 for the Temporary Works. Please be aware that MGF will require a minimum 5 working days to complete F002/F003 from receipt of full and final information. Documents to be completed by MGF:</p><p>F002 (Statement of Design Intent) (Note: £300 Design Charge)</p><p>F003 (Certification of Design) (Note: £650 Design Charge)</p><p>Network Rail Design Check Category (if known): Category 0 Category I Category II Category III </p><p>Document is uncontrolled when printed. Printed copies are for information only. Page 3 of 4 Rail Design Request Form</p><p>Notes e.g. Preferred Equipment/ Loading from Additional Rail Plant</p><p>Supporting Information Checklist (Please indicate documents attached with this Design Brief) Relevant Drawing(s)/Sketch(s) Details of Ground Conditions Photographs of Site</p><p>Permanent Works F002 Latest Revision of ‘For Construction’ Permanent Works Drawings</p><p>Customer Confirmation (To be completed by the Temporary Works Co-ordinator or the CRE) I confirm that the above information comprises the design brief, which should be used to prepare a Signed (by customer):temporary worksName shoring (print): scheme. Title: Date:</p><p>Document is uncontrolled when printed. Printed copies are for information only. Page 4 of 4</p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    4 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us