Bridge Scour Evaluation - Plan of Action

Bridge Scour Evaluation - Plan of Action

<p> BRIDGE SCOUR EVALUATION - PLAN OF ACTION Br. No. Owner Location Facility Carried Name 09C0006 Plumas County AT SH 70 PAXTON RD E BR N FK FEATHER RIVER</p><p>Plan of Action Date of Completed By: Completion:</p><p>1. SCOUR VULNERABILITY RATING </p><p>Scour Evaluation Summary:</p><p>Scour History:</p><p> a. Foundation Type Spread footing Pile Extension Footing on Piles Unknown b. Foundation Material Known ______Unknown Scour Review: Done By: Date: </p><p>Structural Assessment:Done By: Date:  Critical Elevation: ______Geotechnical Assessment: Done By: Date: Critical Elevation: ______</p><p>2. NBIS CODING INFORMATION Most Recent Inspection date 6/25/03 Item 113 Scour 3 Item 60 Substructure 5 Item 61 Channel & Channel Protection 6 Item 71 Waterway Adequacy 7 3. COUNTERMEASURE RECOMMENDATION A. Completed Countermeasures: </p><p>B. Proposed Countermeasures: </p><p>Countermeasures Not Required. (Please explain)</p><p>Install Scour Countermeasures (See 4 and 5) Estimated Cost Riprap with monitoring program $ Guide bank</p><p>$ Spurs / Bendway weirs / Barbs $ Relief bridge / Culvert $ Channel improvements $ Monitoring</p><p>$ Monitoring device $ Check Dam $ Substructure Modification $ Bridge replacement $ Other ______$ </p><p>Close Bridge (See 6)</p><p>4. COUNTERMEASURE IMPLEMENTATION SCHEDULE Countermeasure Implementation Project Type: Proposed Construction Project Lead Agency Maintenance Project</p><p>Advertised Date: </p><p>Other scheduling information: 5. MONITORING PLAN Monitoring Plan Summary:</p><p>Monitoring Authority:</p><p>Regular Inspection Program of ______mo. w/surveyed cross sections Items to Watch: undermining the footing Increased Inspection Interval of ______mo. w/surveyed cross sections Items to Watch:. Underwater Inspection Program Frequency ______mo. Items to Watch: Fixed Monitoring Device Type of Instrument: Installation location(s): Sample Interval: 30 min. 1 hr. 6 hrs. 12 hrs. Other ______Frequency of data logger downloading: Weekly Bi-weekly Monthly</p><p>Other ______Scour-critical discharge: ______Action required if scour-critical elevation detected:</p><p>Other Monitoring Program Type: Visual Instrument  Portable Geophysical Sonar  Other gages Flood monitoring required: Yes No Flood monitoring event defined by: Discharge over ______Stage ______Elev. measured from ______Frequency of flood monitoring: 1 hr. 3 hr. 6 hrs. Other Scour critical elevation: Action required if scour-critical elevation detected: 6. BRIDGE CLOSURE PLAN</p><p>Bridge ADT: 50 Built: 1957 % Trucks: Bridge Length (ft): 223.1 Closure Plan Summary</p><p>Scour Monitoring Criteria for Consideration of Bridge Closure: Water surface elevation reaches Overtopping road or structure Scour Measurement Results / Monitoring Device Loss of Riprap Observed amount of Settlement Loss of Road Embankment Debris Accumulation Other Person / Area Responsible for Closure: </p><p>Contact People (Name & Phone No.): </p><p>Responsible for re-opening after inspection: </p><p>7. DETOUR ROUTE Detour route description (route number, from - to, etc.) – attach map.</p><p>Average ADT: Year: % Trucks: Length: Bridges on Detour Route: Bridge Number Waterway Sufficiency Rating/ Load limitations Scour 113 code BRIDGE SCOUR EVALUATION - PLAN OF ACTION Br. No. Owner Location Facility Carried Name 09C0011 Plumas County 3 MI S OF BIG BECKWRTH- RED CLOVER INDIAN CRRD GENESSEE CREEK</p><p>Plan of Action Date of Completed By: Completion:</p><p>1. SCOUR VULNERABILITY RATING </p><p>Scour Evaluation Summary:</p><p>Scour History:</p><p> a. Foundation Type Spread footing Pile Extension Footing on Piles Unknown b. Foundation Material Known ______Unknown Scour Review: Done By: Date: </p><p>Structural Assessment:Done By: Date:  Critical Elevation: ______Geotechnical Assessment: Done By: Date: Critical Elevation: ______</p><p>2. NBIS CODING INFORMATION Most Recent Inspection date 6/25/03 Item 113 Scour 2 Item 60 Substructure 7 Item 61 Channel & Channel Protection 7 Item 71 Waterway Adequacy 6 3. COUNTERMEASURE RECOMMENDATION C. Completed Countermeasures: </p><p>D. Proposed Countermeasures: </p><p>Countermeasures Not Required. (Please explain)</p><p>Install Scour Countermeasures (See 4 and 5) Estimated Cost Riprap with monitoring program $ Guide bank</p><p>$ Spurs / Bendway weirs / Barbs $ Relief bridge / Culvert $ Channel improvements $ Monitoring</p><p>$ Monitoring device $ Check Dam $ Substructure Modification $ Bridge replacement $ Other ______$ </p><p>Close Bridge (See 6)</p><p>4. COUNTERMEASURE IMPLEMENTATION SCHEDULE Countermeasure Implementation Project Type: Proposed Construction Project Lead Agency Maintenance Project</p><p>Advertised Date: </p><p>Other scheduling information: 5. MONITORING PLAN Monitoring Plan Summary:</p><p>Monitoring Authority:</p><p>Regular Inspection Program of ______mo. w/surveyed cross sections Items to Watch: undermining the footing Increased Inspection Interval of ______mo. w/surveyed cross sections Items to Watch:. Underwater Inspection Program Frequency ______mo. Items to Watch: Fixed Monitoring Device Type of Instrument: Installation location(s): Sample Interval: 30 min. 1 hr. 6 hrs. 12 hrs. Other ______Frequency of data logger downloading: Weekly Bi-weekly Monthly</p><p>Other ______Scour-critical discharge: ______Action required if scour-critical elevation detected:</p><p>Other Monitoring Program Type: Visual Instrument  Portable Geophysical Sonar  Other gages Flood monitoring required: Yes No Flood monitoring event defined by: Discharge over ______Stage ______Elev. measured from ______Frequency of flood monitoring: 1 hr. 3 hr. 6 hrs. Other Scour critical elevation: Action required if scour-critical elevation detected: 6. BRIDGE CLOSURE PLAN</p><p>Bridge ADT: 55 Built: 1962 % Trucks: Bridge Length (ft): 138.1 Closure Plan Summary</p><p>Scour Monitoring Criteria for Consideration of Bridge Closure: Water surface elevation reaches Overtopping road or structure Scour Measurement Results / Monitoring Device Loss of Riprap Observed amount of Settlement Loss of Road Embankment Debris Accumulation Other Person / Area Responsible for Closure: </p><p>Contact People (Name & Phone No.): </p><p>Responsible for re-opening after inspection: </p><p>7. DETOUR ROUTE Detour route description (route number, from - to, etc.) – attach map.</p><p>Average ADT: Year: % Trucks: Length: Bridges on Detour Route: Bridge Number Waterway Sufficiency Rating/ Load limitations Scour 113 code BRIDGE SCOUR EVALUATION - PLAN OF ACTION Br. No. Owner Location Facility Carried Name 09C0039 Plumas County 0.1 MI N BUCKS CR 413 SPANISH CREEK LAKE RD</p><p>Plan of Action Date of Completed By: Completion:</p><p>1. SCOUR VULNERABILITY RATING </p><p>Scour Evaluation Summary:</p><p>Scour History:</p><p> a. Foundation Type Spread footing Pile Extension Footing on Piles Unknown b. Foundation Material Known ______Unknown Scour Review: Done By: Date: </p><p>Structural Assessment:Done By: Date:  Critical Elevation: ______Geotechnical Assessment: Done By: Date: Critical Elevation: ______</p><p>2. NBIS CODING INFORMATION Most Recent Inspection date 6/24/03 Item 113 Scour 3 Item 60 Substructure 3 Item 61 Channel & Channel Protection 3 Item 71 Waterway Adequacy 5 3. COUNTERMEASURE RECOMMENDATION E. Completed Countermeasures: </p><p>F. Proposed Countermeasures: </p><p>Countermeasures Not Required. (Please explain)</p><p>Install Scour Countermeasures (See 4 and 5) Estimated Cost Riprap with monitoring program $ Guide bank</p><p>$ Spurs / Bendway weirs / Barbs $ Relief bridge / Culvert $ Channel improvements $ Monitoring</p><p>$ Monitoring device $ Check Dam $ Substructure Modification $ Bridge replacement $ Other ______$ </p><p>Close Bridge (See 6)</p><p>4. COUNTERMEASURE IMPLEMENTATION SCHEDULE Countermeasure Implementation Project Type: Proposed Construction Project Lead Agency Maintenance Project</p><p>Advertised Date: </p><p>Other scheduling information: 5. MONITORING PLAN Monitoring Plan Summary:</p><p>Monitoring Authority:</p><p>Regular Inspection Program of ______mo. w/surveyed cross sections Items to Watch: undermining the footing Increased Inspection Interval of ______mo. w/surveyed cross sections Items to Watch:. Underwater Inspection Program Frequency ______mo. Items to Watch: Fixed Monitoring Device Type of Instrument: Installation location(s): Sample Interval: 30 min. 1 hr. 6 hrs. 12 hrs. Other ______Frequency of data logger downloading: Weekly Bi-weekly Monthly</p><p>Other ______Scour-critical discharge: ______Action required if scour-critical elevation detected:</p><p>Other Monitoring Program Type: Visual Instrument  Portable Geophysical Sonar  Other gages Flood monitoring required: Yes No Flood monitoring event defined by: Discharge over ______Stage ______Elev. measured from ______Frequency of flood monitoring: 1 hr. 3 hr. 6 hrs. Other Scour critical elevation: Action required if scour-critical elevation detected: 6. BRIDGE CLOSURE PLAN</p><p>Bridge ADT: 55 Built: 1950 % Trucks: Bridge Length (ft): 49.9 Closure Plan Summary</p><p>Scour Monitoring Criteria for Consideration of Bridge Closure: Water surface elevation reaches Overtopping road or structure Scour Measurement Results / Monitoring Device Loss of Riprap Observed amount of Settlement Loss of Road Embankment Debris Accumulation Other Person / Area Responsible for Closure: </p><p>Contact People (Name & Phone No.): </p><p>Responsible for re-opening after inspection: </p><p>7. DETOUR ROUTE Detour route description (route number, from - to, etc.) – attach map.</p><p>Average ADT: Year: % Trucks: Length: Bridges on Detour Route: Bridge Number Waterway Sufficiency Rating/ Load limitations Scour 113 code BRIDGE SCOUR EVALUATION - PLAN OF ACTION Br. No. Owner Location Facility Carried Name 09C0067 Plumas County 13.4 MI NW WARNER VALLEY WARNER CREEK SH36 RD</p><p>Plan of Action Date of Completed By: Completion:</p><p>1. SCOUR VULNERABILITY RATING </p><p>Scour Evaluation Summary:</p><p>Scour History:</p><p> a. Foundation Type Spread footing Pile Extension Footing on Piles Unknown b. Foundation Material Known ______Unknown Scour Review: Done By: Date: </p><p>Structural Assessment:Done By: Date:  Critical Elevation: ______Geotechnical Assessment: Done By: Date: Critical Elevation: ______</p><p>2. NBIS CODING INFORMATION Most Recent Inspection date 6/23/03 Item 113 Scour 2 Item 60 Substructure 5 Item 61 Channel & Channel Protection 4 Item 71 Waterway Adequacy 5 3. COUNTERMEASURE RECOMMENDATION G. Completed Countermeasures: </p><p>H. Proposed Countermeasures: </p><p>Countermeasures Not Required. (Please explain)</p><p>Install Scour Countermeasures (See 4 and 5) Estimated Cost Riprap with monitoring program $ Guide bank</p><p>$ Spurs / Bendway weirs / Barbs $ Relief bridge / Culvert $ Channel improvements $ Monitoring</p><p>$ Monitoring device $ Check Dam $ Substructure Modification $ Bridge replacement $ Other ______$ </p><p>Close Bridge (See 6)</p><p>4. COUNTERMEASURE IMPLEMENTATION SCHEDULE Countermeasure Implementation Project Type: Proposed Construction Project Lead Agency Maintenance Project</p><p>Advertised Date: </p><p>Other scheduling information: 5. MONITORING PLAN Monitoring Plan Summary:</p><p>Monitoring Authority:</p><p>Regular Inspection Program of ______mo. w/surveyed cross sections Items to Watch: undermining the footing Increased Inspection Interval of ______mo. w/surveyed cross sections Items to Watch:. Underwater Inspection Program Frequency ______mo. Items to Watch: Fixed Monitoring Device Type of Instrument: Installation location(s): Sample Interval: 30 min. 1 hr. 6 hrs. 12 hrs. Other ______Frequency of data logger downloading: Weekly Bi-weekly Monthly</p><p>Other ______Scour-critical discharge: ______Action required if scour-critical elevation detected:</p><p>Other Monitoring Program Type: Visual Instrument  Portable Geophysical Sonar  Other gages Flood monitoring required: Yes No Flood monitoring event defined by: Discharge over ______Stage ______Elev. measured from ______Frequency of flood monitoring: 1 hr. 3 hr. 6 hrs. Other Scour critical elevation: Action required if scour-critical elevation detected: 6. BRIDGE CLOSURE PLAN</p><p>Bridge ADT: 200 Built: 1965 % Trucks: 2 Bridge Length (ft): 24.9 Closure Plan Summary</p><p>Scour Monitoring Criteria for Consideration of Bridge Closure: Water surface elevation reaches Overtopping road or structure Scour Measurement Results / Monitoring Device Loss of Riprap Observed amount of Settlement Loss of Road Embankment Debris Accumulation Other Person / Area Responsible for Closure: </p><p>Contact People (Name & Phone No.): </p><p>Responsible for re-opening after inspection: </p><p>7. DETOUR ROUTE Detour route description (route number, from - to, etc.) – attach map.</p><p>Average ADT: Year: % Trucks: Length: Bridges on Detour Route: Bridge Number Waterway Sufficiency Rating/ Load limitations Scour 113 code BRIDGE SCOUR EVALUATION - PLAN OF ACTION Br. No. Owner Location Facility Carried Name 09C0130 CITY OF 0.2 MI S SH 70 GULLING STREET MIDDLE FORK PORTOLA FEATHER RIV</p><p>Plan of Action Date of Completed By: Completion:</p><p>1. SCOUR VULNERABILITY RATING </p><p>Scour Evaluation Summary:</p><p>Scour History:</p><p> a. Foundation Type Spread footing Pile Extension Footing on Piles Unknown b. Foundation Material Known ______Unknown Scour Review: Done By: Date: </p><p>Structural Assessment:Done By: Date:  Critical Elevation: ______Geotechnical Assessment: Done By: Date: Critical Elevation: ______</p><p>2. NBIS CODING INFORMATION Most Recent Inspection date 8/18/04 Item 113 Scour 3 Item 60 Substructure 6 Item 61 Channel & Channel Protection 6 Item 71 Waterway Adequacy 8 3. COUNTERMEASURE RECOMMENDATION I. Completed Countermeasures: </p><p>J. Proposed Countermeasures: </p><p>Countermeasures Not Required. (Please explain)</p><p>Install Scour Countermeasures (See 4 and 5) Estimated Cost Riprap with monitoring program $ Guide bank</p><p>$ Spurs / Bendway weirs / Barbs $ Relief bridge / Culvert $ Channel improvements $ Monitoring</p><p>$ Monitoring device $ Check Dam $ Substructure Modification $ Bridge replacement $ Other ______$ </p><p>Close Bridge (See 6)</p><p>4. COUNTERMEASURE IMPLEMENTATION SCHEDULE Countermeasure Implementation Project Type: Proposed Construction Project Lead Agency Maintenance Project</p><p>Advertised Date: </p><p>Other scheduling information: 5. MONITORING PLAN Monitoring Plan Summary:</p><p>Monitoring Authority:</p><p>Regular Inspection Program of ______mo. w/surveyed cross sections Items to Watch: undermining the footing Increased Inspection Interval of ______mo. w/surveyed cross sections Items to Watch:. Underwater Inspection Program Frequency ______mo. Items to Watch: Fixed Monitoring Device Type of Instrument: Installation location(s): Sample Interval: 30 min. 1 hr. 6 hrs. 12 hrs. Other ______Frequency of data logger downloading: Weekly Bi-weekly Monthly</p><p>Other ______Scour-critical discharge: ______Action required if scour-critical elevation detected:</p><p>Other Monitoring Program Type: Visual Instrument  Portable Geophysical Sonar  Other gages Flood monitoring required: Yes No Flood monitoring event defined by: Discharge over ______Stage ______Elev. measured from ______Frequency of flood monitoring: 1 hr. 3 hr. 6 hrs. Other Scour critical elevation: Action required if scour-critical elevation detected: 6. BRIDGE CLOSURE PLAN</p><p>Bridge ADT: 5000 Built: 1954 % Trucks: 8 Bridge Length (ft): 252.0 Closure Plan Summary</p><p>Scour Monitoring Criteria for Consideration of Bridge Closure: Water surface elevation reaches Overtopping road or structure Scour Measurement Results / Monitoring Device Loss of Riprap Observed amount of Settlement Loss of Road Embankment Debris Accumulation Other Person / Area Responsible for Closure: </p><p>Contact People (Name & Phone No.): </p><p>Responsible for re-opening after inspection: </p><p>7. DETOUR ROUTE Detour route description (route number, from - to, etc.) – attach map.</p><p>Average ADT: Year: % Trucks: Length: Bridges on Detour Route: Bridge Number Waterway Sufficiency Rating/ Load limitations Scour 113 code BRIDGE SCOUR EVALUATION - PLAN OF ACTION Br. No. Owner Location Facility Carried Name 09C0137 Plumas County 0.1 MI S OF S.H. 1ST AVENUE NORTH FORK 36 FEATHER RIVER</p><p>Plan of Action Date of Completed By: Completion:</p><p>1. SCOUR VULNERABILITY RATING </p><p>Scour Evaluation Summary:</p><p>Scour History:</p><p> a. Foundation Type Spread footing Pile Extension Footing on Piles Unknown b. Foundation Material Known ______Unknown Scour Review: Done By: Date: </p><p>Structural Assessment:Done By: Date:  Critical Elevation: ______Geotechnical Assessment: Done By: Date: Critical Elevation: ______</p><p>2. NBIS CODING INFORMATION Most Recent Inspection date 9/11/03 Item 113 Scour 2 Item 60 Substructure 6 Item 61 Channel & Channel Protection 5 Item 71 Waterway Adequacy 6 3. COUNTERMEASURE RECOMMENDATION K. Completed Countermeasures: </p><p>L. Proposed Countermeasures: </p><p>Countermeasures Not Required. (Please explain)</p><p>Install Scour Countermeasures (See 4 and 5) Estimated Cost Riprap with monitoring program $ Guide bank</p><p>$ Spurs / Bendway weirs / Barbs $ Relief bridge / Culvert $ Channel improvements $ Monitoring</p><p>$ Monitoring device $ Check Dam $ Substructure Modification $ Bridge replacement $ Other ______$ </p><p>Close Bridge (See 6)</p><p>4. COUNTERMEASURE IMPLEMENTATION SCHEDULE Countermeasure Implementation Project Type: Proposed Construction Project Lead Agency Maintenance Project</p><p>Advertised Date: </p><p>Other scheduling information: 5. MONITORING PLAN Monitoring Plan Summary:</p><p>Monitoring Authority:</p><p>Regular Inspection Program of ______mo. w/surveyed cross sections Items to Watch: undermining the footing Increased Inspection Interval of ______mo. w/surveyed cross sections Items to Watch:. Underwater Inspection Program Frequency ______mo. Items to Watch: Fixed Monitoring Device Type of Instrument: Installation location(s): Sample Interval: 30 min. 1 hr. 6 hrs. 12 hrs. Other ______Frequency of data logger downloading: Weekly Bi-weekly Monthly</p><p>Other ______Scour-critical discharge: ______Action required if scour-critical elevation detected:</p><p>Other Monitoring Program Type: Visual Instrument  Portable Geophysical Sonar  Other gages Flood monitoring required: Yes No Flood monitoring event defined by: Discharge over ______Stage ______Elev. measured from ______Frequency of flood monitoring: 1 hr. 3 hr. 6 hrs. Other Scour critical elevation: Action required if scour-critical elevation detected: 6. BRIDGE CLOSURE PLAN</p><p>Bridge ADT: 1971 Built: 1947 % Trucks: 3 Bridge Length (ft): 132.9 Closure Plan Summary</p><p>Scour Monitoring Criteria for Consideration of Bridge Closure: Water surface elevation reaches Overtopping road or structure Scour Measurement Results / Monitoring Device Loss of Riprap Observed amount of Settlement Loss of Road Embankment Debris Accumulation Other Person / Area Responsible for Closure: </p><p>Contact People (Name & Phone No.): </p><p>Responsible for re-opening after inspection: </p><p>7. DETOUR ROUTE Detour route description (route number, from - to, etc.) – attach map.</p><p>Average ADT: Year: % Trucks: Length: Bridges on Detour Route: Bridge Number Waterway Sufficiency Rating/ Load limitations Scour 113 code</p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    36 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us