IEEE WG Or TF Report: P1247; Interrupter Switches

IEEE WG Or TF Report: P1247; Interrupter Switches

<p>IEEE WG or TF report: P1247; Interrupter switches Date of meeting: 4 may 2004, Galveston, TX, 14h15 to 15h00 Number of participants: - Members: 6 - Guests: 26 1 guest requested to be a member -- accepted.</p><p>Résumé of discussions and of work performed: The chairman has presented recirculation ballot results. We still have 3 negatives, and only 1 outstanding and relating to the PAR. The negative voters will be contacted by email, by the chairman. The document will be re-balloted on the outstanding unresolved negative. The outstanding negative relates to the load circuit power factor. Another negative relates to editorial and metrification comments that are out of the PAR and are being dealt with by TF 1. The other negative relates to the TRV; this is not part of the PAR and will be reviewed by a TF for future revision.</p><p>TF 1 (definitions, notes, metrification) has almost completed their analysis of comments and proposed solutions. They point out that according to IEEE rules, a note to a table is not normative; a footnote is normative. Most of the notes to tables and figures will thus be converted in footnotes.</p><p>TF 2 (TRV) nothing to report; they shall do their task for the fall 2004 meeting.</p><p>TF3 (Capacitive current) waiting for the C37.04a and 09a to review the restrike classification.</p><p>TF 4 (magnetizing current) nothing to report. The chair will contact the TF chair.</p><p>Items for actions: 1. Chair action: a. Contact negative voters to resolve negatives b. Re-ballot the document (limited to the outstanding PAR related negative) c. Submit the document to the REVCOM for approval d. Prepare a new PAR for complete revision e. Prepare a draft 0 for revision, based on TF results f. Provide TF 4 with their missing comments on magnetizing current switching.</p><p>2. Task force 1: complete analysis of comments and submit the chairman recommended actions. 3. Task force 2: undertake studies on TRV and prepare report for the fall 2004 meeting 4. Task force 3: review the restrike classification and propose amendments for the fall 2004 meeting. 5. Task force 4: undertake analysis of the comments and report for the fall 2004 meeting.</p><p>Task forces deadlines: - 1 September 2004</p><p>Meeting room and period needed: - Number of attendees: 40 - Time period: 1h45</p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us