CDI /SIRE HVPQ Update

CDI /SIRE HVPQ Update

<p>CDI/SIRE HVPQ Update</p><p>Following close cooperation, CDI and SIRE announce the following revisions to the current 5th Edition Harmonised VPQ.</p><p>This will be a small revision to the oil tanker chapter 9 (cargo) regarding cargo pumps for SIRE purposes. The new section will contain three additional questions each containing a grid :</p><p>9.16.1 Cargo Pumps (table grid) 9.16.2 Stripping Pumps (table grid) 9.16.3 Ballast Pumps (table grid)</p><p>In addition, CDI will also be implementing a change in the ship type variants in use by CDI. This is to ensure the capture of all relevant data and assist in simplifying the import/export of HVPQ 5 data between the CDI and SIRE databases; </p><p>Transition schedule</p><p>1st July 2015:  The new CDI Marine Ship Operator HVPQ 5.1 software will be available for download, installation and usage:  The above changes will go live with the revised relevant ship type variants available to be completed and imported/exported between the SIRE/CDI databases  CDI Ship Operators will be able to import into the CDI database the “Oil/Chemical” Tanker Ship Type Variant HVPQ  CDI Ship Operators completing an “Oil/Chemical variant ” HVPQ will see all current Chemical questions plus the oil tanker questions 9 to 9.15.20.6; plus the OCIMF pumping questions in section 9.16  CDI Ship Operators will still have the choice to submit HVPQ’s based on the current “chemical ship type variant” for a tentative period of 4 months, into the CDI database. However ship operators should note that the “Oil/Chemical variant” is preferred starting 1st July 2015.</p><p>1st November 2015: CDI Ship Operators completing “chemical ship type variant” HVPQ’s will not be able anymore to submit these HVPQs to the CDI database, the “Oil/Chemical variant” will however be accepted by both CDI and OCIMF.</p><p>NOTE: The transition period will be closely monitored by CDI and a period of 4 months will be allowed (1st July to 1st November). However, following a review of the transition progress by CDI an announcement will be made if the transition schedule is to be extended.</p><p>Enquiries for CDI: For general questions, please contact CDI, [email protected] For technical questions, please contact Pharox, [email protected] </p><p>Enquires for SIRE: For general and technical enquiries, please contact the SIRE team at OCIMF Tel: +44 (0) 20 7654 1218 E-mail: [email protected] </p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us