East Coast Railway

East Coast Railway

<p> East Coast Railway Office of the Divisional Railway Manager(P) Sambalpur O.O.No.ENGG/21/2012 Date.03.04.2012</p><p>In terms of CPO/ECoR/BBS’ O.O.No.160/2012 dtd.21.03.2012 the following posting order is issued. </p><p>Sir R.S.Raju, SSE/Bridge/ECoR/HQ/BBS in scale in PB-2 `9300-34800/- with Grade Pay of `4600/- under Dy.CE/Br/ECoR/HQ/BBS who come on transfer from HQ/BBS on administrative interest and reported in the office of Sr.DEN(Co)/SBP on 03.04.2012 is hereby posted as SSE/Bridge)/TIG under Sr.DEN(Co)/SBP. </p><p>NOTE: 1. Sr.DEN(cO/SBP’s letter No. 2. Transfer of the above staff arranged on administrative interest. Hence he is eligible for all transfer benefits as per extant rules. 3. The date of effect may be intimated to this office for record.</p><p>(H.K.Mahanand) Asst. Personnel Officer For Divnl.Railway Manager(P)/SBP</p><p>No.SBP/DPO/Staff/Posting/SSE/Bridge/RSR/12 Date.03.04.2012 Copy forwarded for information & necessary action :CPO/ECoR/BBS, Dy.CE/Br/HQ/BBS, Sr.DFM, Sr.DEN(Co), ADEN/Br/SBP, ADEN/TIG, Ch.OS(Bills), O.O.Book, P/File and staff concerned . </p><p>For Divnl. Railway Manager(P)/SBP East Coast Railway Office of the Divnl.Railway Manager(P) Sambalpur O.O.No.ENGG/22/2012 Date.05.04.2012 With the approval of the competent authority i.e Sr.DEN(Co)/SBP the following regularization/Posting orders are issued with immediate effect.</p><p>1. Radha Lakra (ST), D/o Baneshwar Lakra who is working as Sub.GK in PB-1 Rs.5200- 20200/- with Grade Pay Rs.1800/- under SSE(P.Way)/SBP is hereby regularized as GK in PB- 1 Rs.5200-20200/- with Grade Pay Rs.1800/- and posted under same place of working.</p><p>2. Kartick Chhetry (UR), S/o Rambahadur Chhetry who is working as Sub.GK in PB-1 Rs.5200- 20200/- with Grade Pay Rs.1800/- under SSE(P.Way)/MSMD is hereby regularized as GK in PB-1 Rs.5200-20200/- with Grade Pay Rs.1800/- and posted under same place of working. NOTE 1. The above named staff has been empanelled for regular absorption in Gr’D’ category in Civil Engineering Department vide this office Memo No.SBP/DPO/Rectt/Sub/ Regularisation/2012 dtd.04.04.2012. 2. It is made distinctly clear that the mere fact of a candidate being empanelled will not confer up on him any claim or right for employment and this subject to the production of relevant of documents in regard to caste, date of birth, Educational qualification certificate etc. and any fraudulence in this respect will be taken up as per extant rule. 3. If it is subsequently proved that due to furnishing of incorrect/false particulars any individual has been empanelled, his name will be deleted from the panel and in the event of appointment already made his service will be terminated as per extant rule. 4. The date of effect may be intimated to this office for record.</p><p>(P.B.Mondal) Divnl.Railway Manager(P)/SBP</p><p>No.SBP/DPO/Engg/Posting/Regularisation/12 Date.05.04.2012</p><p>Copy forwarded for information and necessary action to: Sr.DFM/SBP, Sr.DEN(Co)/SBP, Ch.OS(Bills), Ch.OS(R&R), SSE(P.Way)/SBP & MSMD, O.O.Book, P/File and staff concerned . </p><p>(P.B.Mondal) Divnl.Railway Manager(P)/SBP EAST COAST RAILWAY Office of the Divnl.Railway Manager (P) Sambalpur O.O No:ENGG/23/2012 Date.10.04.2012</p><p>In partial modification to this office O.O.No.ENGG/05/2012 Dtd.23.01.2012, Sri Siva Das, Sr.Trackman working under SSE(P.Way)/BLGR ordered for posting as Chowkidar under SSE/Works/RAIR is posted as Chowkidar under SSE/Bridge/TIG as per his own request. (Authority No.Sr.DEN(Co)/SBP’s Note No.E/Estt/LPS/SBP/12 dtd.05.04.2012) NOTE: 1. The transfer of Sri Siva Das is arranged on own request, hence he is not eligible for transfer privileges as per extant rules.</p><p>2. All others terms & conditions stipulated in O.O.No.ENGG/05/2012 Dtd.23.01.2012 will remain unchanged. </p><p>(H.K.Mahanand) Asst. Personnel Officer For Divnl.Railway Manager(P)/SBP No.SBP/DPO/ENGG/Transfer/Posting/Med. Dec./12 Date.10.04.2012</p><p>Copy forwarded for information and necessary action to: Sr.DEN(Co)/SBP, Sr.DFM/SBP, ADEN/BLGR & RAIR, ADME/TIG, SSE(P.Way)/BLGR, SSE(C&W)/KBJ, OS/R&R/Med-Decat, Ch.OS(Staff), O.O.Book, P/File and staff concerned. </p><p>For Divnl. Railway Manager(P)/SBP</p><p>East Coast Railway Office of the Divisional Railway Manager (P) Sambalpur O.O. No. ENGG/24/2012 Date.13.04.2012</p><p>With the approval of the Competent Authority, the following posting order is issued to have immediate effect.</p><p>1. On being redeployed and earmarked for posting in Engineering Department, Sri Chitrasen Bag, Tech-I (MVD)/SBP in PB.1 `.5200-20200/- with Grade Pay `2800/- temporary working as FOM under SSE/Works/RAIR is hereby posted as Tech-III(Mason) in PB.1 `5200-20200/- with Grade Pay `1900/- at SBP under SSE(Works)/SBP who is working under ADEN/SBP against an existing vacancy.</p><p>2. On being redeployed and earmarked for posting in Engineering Department, Sri Purusotam Sa, Tech-II (MVD)/SBP in PB.1 `.5200-20200/- with Grade Pay `2400/- working under Sr.DFM/SBP is hereby posted as Tech-III(Mason) in PB.1 `5200-20200/- with Grade Pay `1900/- at SBP under SSE(Works)/SBP who is working under ADEN/SBP against an existing vacancy.</p><p>NOTE: 1) The above redeployment is ordered vide this office O.O.No.GA/ 06/2012 Dtd.13.03.2012. 2) The above staff may be given on job training for a period of one month before starting their dealing works. 3) The date of joining of the above staff may be intimated to this office for record.</p><p>(H.K.Mahanand) Asst. Personnel Officer For Divnl.Railway Manager(P)/SBP No.SBP/DPO/ENGG/Redeploy/Posting/12 Date.13.04.2012</p><p>Copy forwarded for information and necessary action to: Sr.DEN(Co)/SBP, Sr.DFM/SBP, ADEN/SBP & RAIR, SSE(Works)/RAIR & SBP, Ch.OS(Bills), O.O.Book, P/File and staff concerned. </p><p>For Divnl. Railway Manager(P)/SBP East Coast Railway Office of the Divisional Railway Manager (P) Sambalpur O.O. No. ENGG/25/2012 Date.18.04.2012 With the approval of the Competent Authority, the following transfer / posting order is issued to have immediate effect. Srl. Name (Sri) Existing Designation/ Station & Proposed of posting as No. working under Designation / Station and posted under 01 Nirmal Kumar SSE/P/Spl/MSMD ADEN/KBJ SSE/P/BLGR(I/C) ADEN/BLGR 02 N.K.Ranjan SSE/P/MNGD ADEN/TIG SSE/P/KBJ(I/C) ADEN/KBJ 03 S.K.Awadhiya SSE/P/KBJ ADEN/KBJ SSE/P/USFD/MSMD ADEN/KBJ 04 Tapas Dutta SSE/P/RGL SSE/P/SBP SSE/P/MNGD(I/C) ADEN/TIG (Sectional) 05 S.K.Bhargav SSE/P/USFD/BLGR ADEN/BLGR SSE/P/RAIR(I/C) ADEN/RAIR 06 K.M.Bhoi SSE/P/BLGR ADEN/BLGR SSE/P/USFD/BLGR ADEN/BLGR 07 D.Nandan SSE/P/Spl/TIG ADEN/BLGR SSE/P/SFC at TIG ADEN/BLGR (I/C) 08 R.S.Poddar SSE/P/RAIR ADEN/RAIR Principal/DETS/ SBP Sr.DEN(Co)/SBP 09 M.K.Dhola Principal/DETS /SBP Sr.DEN(Co)/ SSE/Tr.Cell Sr.DEN(Co)/SBP SBP (In-charge) 10 K.C.Meena SSE/P/ SFC at TIG ADEN/BLGR SSE/P/USFD/BLGR ADEN/BLGR at TIG 11 A.K.Patel SSE/P/KRAR SSE/P/KBJ SSE/P/RGL SSE/P/SBP (Sectional) (Sectional) 12 J.S.Sardar JE/P/RPRD SSE/P/TIG JE/P/BMCK SSE/P/MNGD 13 K.S.N.Rao JE/P/BMCK SSE/P/MNGD JE/P/MNGD SSE/P/MNGD 14 U.K.Singh JE/P/BAMR SSE/P/RAIR JE/P/DJX SSE/P/BLGR 15 P.K.Panigrahi JE/P/AMB SSE/P/AMB JE/P/THV SSE/P/MNGD 16 S.K.Das JE/P/HSK SSE/P/KBJ JE/P/TIG SSE/P/TIG 17 J.Oram JE/P/SBP SSE/P/SBP JE/P/MANE SSE/P/RAIR 18 V.Kumar JE/P/MANE SSE/P/RAIR JE/P/SBP SSE/P/SBP 19 T.K.Naik JE/P/TIG SSE/P/TIG JE/P/USFD/TIG SEN/TM/SBP 20 Y.J.Babu SSE/P/(W/C)/MNGD SSE/P/MNGD SSE/P/(W/C)/AMB SSE/P/AMB (Sectional) (Sectional) 21 C.R.Sahu Sr.P.Way Sup. /TIG SSE/P/TIG Sr.P.Way.Sup/ SFC SSE/P/SFC at TIG 22 Lambodar Sr.P.Way.Sup./SFC SSE/P/SFC at Sr.P.Way Sup. /TIG SSE/P/TIG Patro TIG 23 M.K.Ghosh JE/P/BMKJ SSE/P/MSMD JE/P/RPRD SSE/P/TIG 24 Satyaban Nag JE/P/(W/C)KBJ SSE/P/KBJ JE/P/(W/C)/BMKJ SSE/P/MSMD 25 M.R.Pattanaik JE/P/(W/C)/Spl/KBJ SSE/P/KBJ JE/P/(W/C)/HSK SSE/P/KBJ 26 K.K.Parida SSE/W/RAIR ADEN/RAIR SSE/W/BLGR(I/C) ADEN/BLGR 27 S.K.Pradhan SSE/W/BLGR ADEN/BLGR SSE/W/SBP(I/C) ADEN(G)/SBP 28 M.M.Krishna JE/W/SBP ADEN(G)/SBP JE/W/RAIR(I/C) ADEN/RAIR Cont. P/2 -2-</p><p>NOTE</p><p>1. This has the approval of Sr.DEN(Co)/SBP. 2. The above staff should vacate the Rly.Qtr. if any occupied by them before moving on transfer. 3. The transfer of staff at Srl.No.01 to 28 & 30 are arranged on administrative interest . Hence they are eligible for all transfer privileges are per extant rules. 4. The transfer of Staff at Srl.No.29 is arranged at his own request, hence he is not eligible for any transfer privileges as per extant rules. 5. The date of joining at the new unit of the above staff may be intimated to this office for record. </p><p>(P.B.Mondal) Divnl.Railway Manager(P)/SBP</p><p>No.SBP/DPO/ENGG/Transfer/Posting/12 Date.18.04.2012</p><p>Copy forwarded for information and necessary action to: Sr.DEN(Co)/SBP, Sr.DFM/SBP, SEN/TM/SBP, ADEN/SBP,BLGR.TIG, KBJ & RAIR,ADEN(G)/SBP, SSE/P/SBP, RAIR, BLGR, SFC at TIG, TIG, AMB, MNGD, KBJ & MSMD, SSE(Works)/RAIR, BLGR & SBP, Ch.OS(Bills), O.O.Book, P/File and staff concerned. </p><p>Copy to: DC/ECoRSC & ECoRSU for kind information. </p><p>Divnl. Railway Manager(P)/SBP EAST COAST RAILWAY Office of the Divnl.Railway Manager (P) Sambalpur O.O No:ENGG/26/2012 Date.18.04.2012</p><p>The following transfer/posting order are issued with the approval of the competent authority i.e Sr.DEN(Co)/SBP to have immediate effect. 1. Sri S.M.Hati, OS/RAIR in PB-2 with Grade Pay of Rs.4200/- under ADEN/RAIR is hereby transferred in his existing capacity & scale of pay to SBP and posted as OS(Bills) under Sr.DEN/East/SBP.</p><p>2. Sri V.Srinivas Rao, OS(Bills)/SBP in PB-2 with Grade Pay of Rs.4200/- under Sr.DEN(East)/SBP is hereby transferred in his existing capacity & scale of pay to RAIR and posted as OS under ADEN/RAIR.</p><p>NOTE: 1. The above transfer order is arranged on administrative interest. Hence, he is eligible for all transfer benefits as per extant rule. 2. The above named staff should vacate the Rly.Qtr. if any occupied by him before moving on transfer. 3. The date of effect may be intimated to this office for record.</p><p>(H.K.Mahanand) Asst. Personnel Officer For Divnl.Railway Manager(P)/SBP</p><p>No.SBP/DPO/ENGG/Transfer/Posting/OS/2012 Date.18.04.2012 Copy forwarded for information and necessary action to: Sr.DFM/SBP, Sr.DEN(Co)/SBP, Sr.DEN(East)/SBP, ADEN/RAIR, Ch.OS(Bills), O.O.Book, P/File and staff concerned . </p><p>Copy to : OS(Hindi) for Hindi version.</p><p>For Divnl.Railway Manager(P)/SBP EAST COAST RAILWAY Office of the Divnl.Railway Manager (P) Sambalpur O.O No:ENGG/27/2012 Date.18.04.2012</p><p>CORRINGENDUM</p><p>In partial modification of this office O.O.No.ENGG/25/2012 Dtd.18.04.2012, the foot Note No.3 & 4 may be read as under:-</p><p>Foot Note No.3:- The transfer of staff at Srl.No.01 to 26 & 28 are arranged on administrative interest. Hence they are eligible for all transfer privileges are per extant rules. </p><p>Foot Note No.4:- The transfer of Staff at Srl.No.27 is arranged at his own request, hence he is not eligible for any transfer privileges as per extant rules. </p><p>NOTE: 1. All the other terms and conditions stipulated in the O.O.No.ENGG/25/2012 Dtd.18.04.2012 will remain unchanged. </p><p>(P.B.Mondal) Divnl.Railway Manager(P)/SBP</p><p>No.SBP/DPO/ENGG/Transfer/Posting/12 Date.18.04.2012</p><p>Copy forwarded for information and necessary action to: Sr.DEN(Co)/SBP, Sr.DFM/SBP, SEN/TM/SBP, ADEN/SBP,BLGR.TIG, KBJ & RAIR,ADEN(G)/SBP, SSE/P/SBP, RAIR, BLGR, SFC at TIG, TIG, AMB, MNGD, KBJ & MSMD, SSE(Works)/RAIR, BLGR & SBP, Ch.OS(Bills), O.O.Book, P/File and staff concerned. </p><p>Copy to: DC/ECoRSC & ECoRSU for kind information. </p><p>Divnl. Railway Manager(P)/SBP EAST COAST RAILWAY Office of the Divnl.Railway Manager (P) Sambalpur</p><p>O.O No:ENGG/28/2012 Date.19.04.2012</p><p>The following transfer/posting order are issued with the approval of the competent authority i.e Sr.DEN(Co)/SBP to have immediate effect. </p><p>1. Sri Santosh Kumar, JE/P.Way/THV in PB-2 with Grade Pay of Rs.4200/- under SSE/P.Way/MNGD is hereby transferred in his existing capacity & scale of pay to KRAR and posted as JE(P.Way) under SSE/P.Way/KBJ.</p><p>NOTE: 1. The above transfer is arranged on administrative interest. Hence, he is eligible for all transfer privileges as per extant rule. 2. The above named staff should vacate the Rly.Qtr. if any occupied by him before moving on transfer. 3. The date of joining at the new unit of the above staff may be intimated to this office for record.</p><p>(H.K.Mahanand) Asst. Personnel Officer For Divnl.Railway Manager(P)/SBP</p><p>No.SBP/DPO/ENGG/Transfer/Posting/SK/12 Date.19.04.2012</p><p>Copy forwarded for information and necessary action to: Sr.DEN(Co)/SBP, Sr.DFM/SBP, ADEN/KBJ & TIG, SSE/P.Way/MNGD & KBJ , Ch.OS(Bills), O.O.Book, P/File and staff concerned.</p><p>Copy to: DC/ECoRSC/SBP for kind information. </p><p>For Divnl. Railway Manager(P)/SBP EAST COAST RAILWAY Office of the Divnl.Railway Manager (P) Sambalpur O.O No:ENGG/29/2012 Date.25.04.2012 With the approval of the competent authority, the following candidate who has been selected through RRC/BBS for posting as Trackman in scale PB-1 `5200-20200/- with Grade Pay of ` 1800/- against Ex-servicemen quota, is now appointed as Trackman in PB -1 `5200-20200/- with Grade Pay of `1800/- at the place mentioned along side. Srl. Name/Father’s Date Edu. Medical Posted as Place No. Name/ Of Qualifi- category & of Community Birth cation passed Scale of pay posting Shyam Sundar 12.01.69 9th passed Fit in A-2 Trackman in Posted under Parichha (UR) (Aye-two) PB -1 `5200- SSE(P.Way)/ 01 S/o Chakradhar vide 20200/- + RAIR Parichha No.220678 GP of `1800/- dtd.03.05.11 of Sr.DMO (PME)/ VSKP NOTE: 1. Authority : CPO/ECoR/BBS’ letter No.ECoR/Pers/Rectt/Ex-SM/Aptt dtd.02.03.2012 and This office Memo No.SBP/DPO/Rectt/RRC/Ex-SM/TM/2011 Dtd.10.04.2012. 2. The date of birth of the above named candidates is recorded as per education qualification certificate submitted by them subject to final verification at the time of opening of S/Sheet. 3. The above appointment is provisional & subject to production of relevant documents in regard to caste, date of birth & educational certificates etc. Any fraudulence in this respect will be taken up as per extant rule. 4. The above candidates will be governed under New Pension Scheme and not under SRPF rules. 5. The date of joining may be intimated to this office for record. PHOTO of Shyam Sundar LTI of Shyam Sundar ParichhaSignature of Shyam Sundar Parichha Parichha</p><p>(H.K.Mahanand) Asst.Personnel Officer, For Divnl.Railway Manager(P)/SBP No.SBP/DPO/STAFF/ENGG/TM/Ex-SM/Posting/12 Date.25.04.2012 Copy forwarded for information and necessary action to: Sr.DFM/SBP, Sr.DEN(Co)/SBP, ADEN/RAIR, Ch.OS(R&R), SSE(P.Way)/RAIR, OS(NPS) O.O.Book, P/File and staff concerned . </p><p>For Divnl.Railway Manager(P)/SBP EAST COAST RAILWAY Office of the Divnl.Railway Manager (P) Sambalpur O.O No:ENGG/30/2012 Date.30.04.2012 With the approval of the competent authority, the following candidate who has been approved by GM for appointment as Substitute in PB-1 with GP `1800/- on Compassionate ground and on being earmarked for posting in Engineering Department as a Sub.Khalasi vide this office Memo No.SBP/DPO/Rectt/Comp.Apptt/Sub/2012 Dtd.18.04.2012, is now appointed as Substitute Khalasi in PB -1 `5200-20200/- with Grade Pay of `1800/- at the place mentioned along side. Srl. Name/Father’s Date Edu. Medical Posted as Place No. Name/ Of Qualifi- category & of Community Birth cation passed Scale of pay posting Smt.Nirmala 15.11.84 +2 pass Fit in A-2 Substitute Posted to Devi (UR) (Aye-two) Khalasi in work under 01 W/o Lt.Raman vide PB -1 `5200- SSE(Works)/ Kumar Yadav No.570775 20200/- + SBP under dtd.29.03.12 GP of `1800/- ADEN/SBP of ACMS/ SBP (CPO/ECoR/BBS’s Authority No.ECoR/Pers/Comp.Aptt/SBP/ND dtd.23.01.2012) NOTE: 1. The date of birth of the above named candidates is recorded as per education qualification certificate submitted by them subject to final verification at the time of opening of S/Sheet. 2. The above appointment is provisional & subject to production of relevant documents in regard to caste, date of birth & educational certificates etc. Any fraudulence in this respect will be taken up as per extant rule. 3. The above candidates will be governed under New Pension Scheme and not under SRPF rules. 4. The date of joining may be intimated to this office for record. PHOTO of Smt.Nirmala Devi LTI of Smt.Nirmala Devi Signature of Smt.Nirmala Devi</p><p>(H.K.Mahanand) Asst. Personnel Officer For Divnl.Railway Manager(P)/SBP No.SBP/DPO/STAFF/ENGG/Sub/Comp.Aptt/Posting/12 Date.30.04.2012 Copy forwarded for information and necessary action to: Sr.DFM/SBP, Sr.DEN(Co)/SBP, ADEN/SBP, Ch.OS(R&R), SSE(Works)/SBP, O.O.Book, P/File and staff concerned . </p><p>For Divnl.Railway Manager(P)/SBP EAST COAST RAILWAY Office of the Divnl.Railway Manager (P) Sambalpur</p><p>MEMO No:ENGG/31/2012 Date.10.05.2012</p><p>Sub: Publication of provisional select list for promotion to the post of Sr. Technician in PB- 2 `9300-34800/- with Grade Pay of `4200/- in Engineering Department -0-</p><p>Following is the provisional select list for promotion to the post of 01-UR Sr. Tech(Mason), 01-UR Sr.Tech(PLF) & 01-UR Sr.Tech(FOM) in PB-2 ` 9300-34800/- with Grade Pay of ` 4200/- in Engineering Department. The screening was conducted on 30.04.2012 and select was approved by the competent authority i.e ADRM on 04.05.2012. </p><p>Srl. Name /Com Designation / Station Working under Remarks No. 01 Sri Sashi Majhi (ST) Tech-I((Mason)/SBP SSE/Works/SBP Suitable 02 Sri R.Suryanarayana (UR) Tech-I(PLF)/BLGR SSE/Works/BLGR Suitable 03 Sri G.Majhi (ST) Tech-I(FOM)/BLGR SSE/Works)/BLGR Suitable</p><p>NOTE: 1. The above select list is provisional & subject to they are free from SPE/Vig/D&A cases pending against them. </p><p>(H.K.Mahanand) Asst. Personnel Officer For Divnl.Railway Manager(P)/SBP</p><p>No.SBP/DPO/Engg/ Sr.Tech(Artisan)/Select List/2012 Date.10.05.2012</p><p>Copy forwarded for information and necessary action to: Sr.DFM/SBP, Sr.DEN(Co)/SBP, ADEN/BLGR & SBP, SSE(Works)/BLGR & SBP, Ch.OS(Bills), O.O.Book, P/File and staff concerned . </p><p>Copy to : OS(Hindi) for Hindi version.</p><p>For Divnl.Railway Manager(P)/SBP EAST COAST RAILWAY Office of the Divnl.Railway Manager (P) Sambalpur</p><p>MEMO No:ENGG/32/2012 Date.10.05.2012</p><p>Sub: Publication of provisional select list for promotion to the post of Technician-I (ECR) in PB-1 `5200-20200/- with Grade Pay of `2800/- in Engineering Department. -0-</p><p>Following is the provisional select list for promotion to the post of 01-UR, 02-SC & 01-ST Technician-I(ECR) in PB-1 ` 5200-20200/- with Grade Pay of ` 2800/- in Engineering Department. The screening was conducted on 07.05.2012 and select list was approved by the competent authority i.e ADRM on 07.05.2012. </p><p>Srl. Name /Com Designation / Station Working under Remarks No. 01 Sri P.Bhoi (UR) Tech-II(ECR)/BLGR SSE/Works/BLGR Suitable 02 Sri Prohalad (SC) Tech-II(ECR)/AMB SSE/P.Way/AMB Suitable against SC post</p><p>NOTE: 1. The above select list is provisional & subject to they are free from SPE/Vig/D&A cases pending against them. </p><p>(H.K.Mahanand) Asst. Personnel Officer For Divnl.Railway Manager(P)/SBP</p><p>No.SBP/DPO/Engg/ Sr.Tech(Artisan)/Select List/2012 Date.10.05.2012</p><p>Copy forwarded for information and necessary action to: Sr.DFM/SBP, Sr.DEN(Co)/SBP, ADEN/BLGR & TIG, SSE(Works)/BLGR & SSE(P.Way)/AMB, Ch.OS(Bills), O.O.Book, P/File and staff concerned . </p><p>Copy to : OS(Hindi) for Hindi version.</p><p>For Divnl.Railway Manager(P)/SBP EAST COAST RAILWAY Office of the Divnl.Railway Manager (P) Sambalpur MEMO No:ENGG/33/2012 Date.10.05.2012</p><p>Sub: Publication of provisional select list for promotion to the post of Technician-I (PLF, Mason, FOM, Welder & EBS) in PB-1 `5200-20200/- with Grade Pay of `2800/- in Engineering Department. -0- Following is the provisional select list for promotion to the post of 03 (01-UR, 01-SC & 01-ST)Technician-I(PLF), 07 (06-UR & 01-SC) Tech-I(Mason), 03 (02-UR & 01-ST) Tech-I(FOM), (01-UR) Tech-I(Welder) and 08(05-UR, 02-SC & 01-ST) Tech-I(EBS) in PB-1 ` 5200-20200/- with Grade Pay of ` 2800/- in Engineering Department. The screening was conducted on 07.05.2012 and select list was approved by the competent authority i.e ADRM on 07.05.2012. Srl. Name /Com Designation / Station Working under Remarks No. 01 Biranchi Bhaisa (UR) Tech-II(PLF)/SBP SSE/W/SBP Suitable 02 Mahendra Tandi(SC) Tech-II(PLF)/TIG SSE/W/TIG Suitable against SC 03 Sashi Majhi(ST) Tech-II(PLF)/SBP SSE/W/SBP Suitable against ST 04 Narasingh(UR) Tech-II(Mason)/KBJ SSE/W/KBJ Suitable 05 Suru Gohir(UR) Tech-II(Mason)/BLGR SSE/W/BLGR Suitable 06 B.Satyanarayana(UR) Tech-II(Mason)/TIG SSE/W/TIG Suitable 07 Dingar Chandan(UR) Tech-II(Mason)/TIG SSE/W/TIG Suitable 08 Arkhit Tandi (SC) Tech-II(Mason)/SBP SSE/W/SBP Suitable 09 Jagannath Bhati(UR) Tech-II(Mason)/TIG SSE/W/TIG Suitable 10 Jatan Bag (SC) Tech-II(Mason)/RAIR SSE/W/RAIR Suitable against SC 11 Rajin (UR) Tech-II(FOM)/KBJ SSE/W/KBJ Suitable 12 Hazarat Ali Tech-II(FOM)/TIG SSE/W/TIG Suitable 13 Kandrapa (UR) Tech-II(Welder)/KBJ SSE/P/KBJ Suitable 14 Falguni Banchhor(UR) Tech-II(EBS)/AMB SSE/P/AMB Suitable 15 Ghano(SC) Tech-II(EBS)/TIG SSE/W/TIG Suitable against SC 16 N.Mahanand(SC) Tech-II(EBS)/KBJ SSE/P/KBJ Suitable against SC 17 Rabi Luhar(UR) Tech-II(EBS)/BLGR SSE/P/BLGR Suitable 18 S.Ramakrishna Rao(UR) Tech-II(EBS)/TIG SSE/Br/TIG Suitable 19 Nymatulla (UR) Tech-II(EBS)/MSMD SSE/P/MSMD Suitable 20 K.Ramakrishna Rao (UR) Tech-II(EBS)/SBP SSE/Br/SBP Suitable</p><p>NOTE: 1. The above select list is provisional & subject to they are free from SPE/Vig/D&A cases pending against them. </p><p>(H.K.Mahanand) Asst. Personnel Officer For Divnl.Railway Manager(P)/SBP No.SBP/DPO/Engg/ Tech-I(Artisan)/Select List/2012 Date.10.05.2012 Copy forwarded for information and necessary action to: Sr.DFM/SBP, Sr.DEN(Co)/SBP, ADEN/BLGR, SBP, RAIR, KBJ & TIG, SSE(Works)/SBP, BLGR, TIG, KBJ & RAIR, SSE(P.Way)/AMB, KBJ, BLGR, MSMD, SSE/Br/SBP & TIG, Ch.OS(Bills), O.O.Book, P/File and staff concerned . </p><p>For Divnl.Railway Manager(P)/SBP EAST COAST RAILWAY Office of the Divnl.Railway Manager (P) Sambalpur O.O No:ENGG/34/2012 Date.14.05.2012</p><p>The following transfer / posting order is issued with the approval of the competent authority i.e GM/ECoR/BBS to have immediate effect.</p><p>1. Sri A.P.Das, JE (P.Way)/DJX in PB-2 `9300-34800/- with Grade Pay of `4200/- under SSE(P.Way)/BLGR is hereby transferred to BAMR in his existing grade & capacity and posted under SSE(P.Way)/RAIR.</p><p>(Authority: CPO/ECoR/BBS’s letter No.ECoR/Pers/IRM/P-II/04 dtd.14.05.2012).</p><p>NOTE: 1. The approval for the above Transfer / Posting has been obtained in terms of provision in Estt.Srl.No.37/80. 2. The above transfer is arranged on administrative interest, hence he is eligible for all transfer privileges as per extant rule. 3. He should vacate Railway Quarter if any under his occupation at the present working place before moving on transfer to BAMR. 4. The date of effect may be intimated to this office for record.</p><p>(H.K.Mahanand) Asst. Personnel Officer For Divnl.Railway Manager(P)/SBP No.SBP/DPO/Engg/Transfer/Posting/JE(P)/APD/2012 Date.14.05.2012</p><p>Copy to: CPO/ECoR/BBS for information please. Copy to: DC/ECoRSC/SBP for information please. Copy forwarded for information and necessary action to: Sr.DFM/SBP, Sr.DEN(Co)/SBP, ADEN/BLGR & RAIR, SSE(P.Way)/ BLGR & RAIR, Ch.OS(Bills), O.O.Book, P/File and staff concerned . </p><p>For Divnl.Railway Manager(P)/SBP EAST COAST RAILWAY Office of the Divnl.Railway Manager (P) Sambalpur O.O. No:ENGG/35/2012 Date.15.05.2012 The following promotion and posting order are issued with the approval of the competent authority. Existing Promoted & posted as / under Sl. Name/Com Design./Stn Working PB+ GP Design. PB+ GP Unit/ Stn No under. 01 P.Bhoi (UR) Tech-II(ECR)/ SSE(Works)/ PB-1 + GP Tech-I PB-1 + GP SSE(Works) BLGR BLGR Rs.2400/- (ECR) Rs.2800/- / BLGR 02 Prohalad (SC) Tech-II(ECR)/ SSE(P.Way)/ PB-1 + GP Tech-I PB-1 + GP SSE(P.Way) AMB AMB Rs.2400/- (ECR) Rs.2800/- / AMB</p><p>NOTE- 1. The above named staff have been declared suitable for promotion to the post of Tech-I (ECR) in PB-1 with Grade Pay Rs.2800/- vide this office Memo.No.ENGG/32/2012 dtd.10.05.2012. 2. The staff promoted to the post of higher grade may be advised to exercise their option for fixation of pay in promotional grade within one month from the date of issue of this office order in terms of RBE No.138/07 & 132/08. 3. The promotion of the above named staff is provisional subject to they are free from SPE/Vig/D&A/ cases if any pending against them. 4. The date of effect may be intimated to this office for record.</p><p>(H.K.Mahanand) Asst. Personnel Officer For Divnl.Railway Manager(P)/SBP No.SBP/DPO/ENGG/Promotion/Posting/Tech-I(ECR)/2012 Date.15.05.2012</p><p>Copy forwarded for information and necessary action to: Sr.DFM/SBP, Sr.DEN(Co)/SBP, ADEN/ BLGR & TIG , SSE/Works)/BLGR & SSE(P.Way)/AMB, O.O.Book, P/File and staff concerned.</p><p>For Divnl.Railway Manager(P)/SBP EAST COAST RAILWAY Office of the Divnl.Railway Manager (P) Sambalpur O.O. No:ENGG/36/2012 Date.15.05.2012 The following promotion and posting order are issued with the approval of the competent authority. Existing Promoted & posted as / under Sl. Name/Com Design./Stn Working PB+ GP Design. PB+ GP Unit/ Stn No under. 01 Sashi Majhi (ST) Tech-I(Mason)/ SSE(Works)/ PB-1 + GP Sr.Tech PB-2 + GP SSE(Works) SBP SBP Rs.2800/- (Mason) Rs.4200/- / SBP 02 R.Suryanarana Tech-I(PLF)/ SSE(Works)/ PB-1 + GP Sr.Tech PB-2 + GP SSE(Works) (UR) BLGR BLGR Rs.2800/- (PLF) Rs.4200/- / BLGR 03 G. Majhi (ST) Tech-I(FOM)/ SSE(Works)/ PB-1 + GP Sr.Tech PB-2 + GP SSE(Works) BLGR BLGR Rs.2800/- (FOM) Rs.4200/- / BLGR</p><p>NOTE- 1. The above named staff have been declared suitable for promotion to the post of Sr.Tech (Mason, PLF & FOM) in PB-2 with Grade Pay Rs.4200/- vide this office Memo.No.ENGG/31/2012 dtd.10.05.2012. 2. The staff promoted to the post of higher grade may be advised to exercise their option for fixation of pay in promotional grade within one month from the date of issue of this office order in terms of RBE No.138/07 & 132/08. 3. The promotion of the above named staff is provisional subject to they are free from SPE/Vig/D&A/ cases if any pending against them. 4. The date of effect may be intimated to this office for record.</p><p>(H.K.Mahanand) Asst. Personnel Officer For Divnl.Railway Manager(P)/SBP No.SBP/DPO/ENGG/Promotion/Posting/Sr.Tech(Artisan)/2012 Date.15.05.2012</p><p>Copy forwarded for information and necessary action to: Sr.DFM/SBP, Sr.DEN(Co)/SBP, ADEN/SBP & BLGR, SSE(Works)/BLGR & SBP, O.O.Book, P/File and staff concerned. .</p><p>For Divnl.Railway Manager(P)/SBP EAST COAST RAILWAY Office of the Divnl.Railway Manager (P) Sambalpur O.O. No:ENGG/37/2012 Date.15.05.2012 The following promotion and posting order are issued with the approval of the competent authority. Existing Promoted & posted as / under Sl. Name/Com Design./Stn Working PB+ GP Design. PB+ GP Unit/ Stn No under. 01 Biranchi Bhaisa Tech-II(PLF)/ SSE(Works)/ PB-1 + GP Tech-I PB-1 + GP SSE(Works) (UR) SBP SBP Rs.2400/- (PLF) Rs.2800/- / SBP 02 Mahendra Tandi Tech-II(PLF)/ SSE(Works)/ PB-1 + GP Tech-I PB-1 + GP SSE(Works) (SC) TIG TIG Rs.2400/- (PLF) Rs.2800/- / TIG 03 Sashi Majhi (ST) Tech-II(PLF)/ SSE(Works)/ PB-1 + GP Tech-I PB-1 + GP SSE(Works) SBP SBP Rs.2400/- (PLF) Rs.2800/- / SBP 04 Narasingh (UR) Tech-II SSE(Works) PB-1 + GP Tech-I PB-1 + GP SSE(Works) (Mason) / KBJ KBJ Rs.2400/- (Mason) Rs.2800/- KBJ 05 Suru Gohir(UR) Tech-II SSE(Works) PB-1 + GP Tech-I PB-1 + GP SSE(Works) (Mason) / /BLGR Rs.2400/- (Mason) Rs.2800/- BLGR BLGR 06 B.Satyanarayana Tech- SSE(Works) PB-1 + GP Tech-I PB-1 + GP SSE(Works) (UR) II(Mason ) / TIG /TIG Rs.2400/- (Mason) Rs.2800/- / TIG 07 Dingar Chandan Tech-II SSE(Works)/ PB-1 + GP Tech-I PB-1 + GP SSE(Works) (UR) (Mason) / TIG TIG Rs.2400/- (Mason) Rs.2800/- / TIG 08 Arkhit Tandi (SC) Tech-II SSE(Works) PB-1 + GP Tech-I PB-1 + GP SSE(Works) (Mason) / SBP / SBP Rs.2400/- (Mason) Rs.2800/- / SBP 09 Jagannath Bhati Tech-II SSE(Works)/ PB-1 + GP Tech-I PB-1 + GP SSE(Works) (UR) (Mason) / TIG TIG Rs.2400/- (Mason) Rs.2800/- / TIG 10 Jatan Bag (SC) Tech-II SSE/Works) PB-1 + GP Tech-I PB-1 + GP SSE(Works) (Mason) / RAIR / RAIR Rs.2400/- (Mason) Rs.2800/- / RAIR 11 Rajin (UR) Tech-II (FOM)/ SSE(Works) PB-1 + GP Tech-I PB-1 + GP SSE(Works) KBJ KBJ Rs.2400/- (FOM) Rs.2800/- KBJ 12 Hazarat Ali (UR) Tech-II (FOM)/ SSE(Works) PB-1 + GP Tech-I PB-1 + GP SSE(Works) TIG TIG Rs.2400/- (FOM) Rs.2800/- TIG 13 Kandrapa (UR) Tech-II(Welder) SSE/P.Way) / PB-1 + GP Tech-I PB-1 + GP SSE(P.Way) / KBJ KBJ Rs.2400/- (Welder) Rs.2800/- KBJ 14 Falguni Banchhor Tech- SSE(P.Way)/ PB-1 + GP Tech-I PB-1 + GP SSE(P.Way) (UR) II(EBS) /AMB AMB Rs.2400/- (EBS) Rs.2800/- / AMB 15 Ghano (SC) Tech-II(EBS)/ SSE(Works) PB-1 + GP Tech-I PB-1 + GP SSE(Works) TIG TIG Rs.2400/- (EBS) Rs.2800/- TIG 16 N.Mahanand (SC) Tech-II(EBS)/ SSE(P.Way) PB-1 + GP Tech-I PB-1 + GP SSE(P.Way) KBJ KBJ Rs.2400/- (EBS) Rs.2800/- KBJ 17 Rabi Luhar (UR) Tech-II(EBS) / SSE(P.Way) PB-1 + GP Tech-I PB-1 + GP SSE(P.Way) BLGR BLGR Rs.2400/- (EBS) Rs.2800/- BLGR 18 S.Ramakrishna Rao Tech-II(EBS)/ SSE(Bridge) PB-1 + GP Tech-I PB-1 + GP SSE(Bridge) (UR) TIG / TIG Rs.2400/- (EBS) Rs.2800/- / TIG</p><p>NOTE- 1. The above named staff have been declared suitable for promotion to the post of Tech-I (PLF, Mason, FOM & EBS) in PB-1 with Grade Pay Rs.2800/- vide this office Memo.No.ENGG/33/2012 dtd.10.05.2012. 2. The staff promoted to the post of higher grade may be advised to exercise their option for fixation of pay in promotional grade within one month from the date of issue of this office order in terms of RBE No.138/07 & 132/08. Cont-P/2 Page-2</p><p>3. The promotion of the above named staff is provisional subject to his being free from SPE/Vig/D&A/ cases if any pending against him. 4. The staff at Srl.No.09 Sri Jagannath Bhati,Tech-II(Mason)/TIG, the punishment i.e stoppage of annual increment for a period of one year with cumulative effect may be implemented in the promotional grade as per Estt.Srl.No.139/01. 5. Sri Nymatulla,Tech-II(EBS)/MSMD & Sri K.Ramkrishna,Tech-II(EBS)/SBP will be promoted to the post of Tech-I(EBS) after completion of 02 years regular service in existing grade. 6. The date of effect may be intimated to this office for record.</p><p>(H.K.Mahanand) Asst. Personnel Officer For Divnl.Railway Manager(P)/SBP</p><p>No.SBP/DPO/ENGG/Promotion/Posting/Tech-I(Artisan)/2012 Date.15.05.2012</p><p>Copy forwarded for information and necessary action to: Sr.DFM/SBP, Sr.DEN(Co)/SBP, ADEN/SBP, BLGR, TIG, RAIR & KBJ, SSE(P.Way)/ KBJ, AMB,TIG, MSMD & BLGR, SSE(Works)/TIG, KBJ, BLGR, RAIR & SBP, SSE(Bridge)/TIG & SBP, O.O.Book, P/File and staff concerned.</p><p>For Divnl.Railway Manager(P)/SBP EAST COAST RAILWAY Office of the Divnl.Railway Manager (P) Sambalpur</p><p>O.O No:ENGG/41/2012 Date.30.05.2012</p><p>With the approval of the competent authority, the following order is issued to have immediate effect. Sri B.Satyanarayana, Tech-II(Mason)/TIG (Now promoted as Tech-I(Mason) in PB-1 (`5200-20200) with Grade Pay- `2400/- working under SSE/Works/TIG of SBP Division of E.Co.Railway is hereby transferred to WAT Division of E.Co.Railway on reversion as Tech-III(Mason) in PB-1 `5200-20200/- with Grade Pay of `1900/- on Inter Divisional Own Request transfer by accepting bottom seniority as per extant rules. </p><p>(Authority: CPO/ECoR/BBS’s O.O. No.254/2012 dtd.09.05.2012.) NOTE:-</p><p>1. The above transfer is arranged at his own request; hence he is not eligible for any transfer privileges as per extant rule. 2. The seniority of the above named staff will be assigned at the new seniority unit as per extant rule of Inter Divnl/Railway own request transfer. 3. He should not seek re-transfer back to his parent division/Unit in future date it can only be once again on Inter Railway own request transfer on bottom seniority condition on that date. 4. Sri B.Satyanarayana may be directed to this office with proper identification memo & two recent passport size photographs with duly attested on backside for further release to DRM(P)/E.Co.Railway/WAT Division. 5. His release is subject to SPE/Vig/D&A cases pending against him if any. 6. Sri B.Satyanarayana should submit the NOC from the Bank where his monthly salary is credited & clearance certificate from E.Co.Railway Employees’ Co-Operative Credit Society Ltd. Sambalpur Branch to this office in view of his transfer. 7. He should vacate Railway quarter if any at the present place of working before moving on transfer to WAT division of E.Co. Railway.</p><p>(H.K.Mahanand) Asst. Personnel Officer For Divnl.Railway Manager(P)/SBP</p><p>No: SBP/DPO/Engg/Trf/IDT/Own request/ECoR/WAT/BS/2012 Dt.30.05.2012</p><p>Copy to: CPO/ECoR/BBS, Sr.DEN(Co-ord)/SBP, DRM(P)/ECoR/WAT, Sr.DFM/SBP, ADEN/TIG, SSE(Works)/TIG, Ch.OS(Bills), O.O.Book, File & Staff concerned.</p><p>For Divnl.Railway Manager(P)/SBP EAST COAST RAILWAY Office of the Divnl.Railway Manager (P) Sambalpur O.O. No:ENGG/59/2012 Date.05.06.2012</p><p>The following promotion and posting order are issued with the approval of the competent authority. </p><p>Existing Promoted & posted as / under Sl. Name/Com Design./Stn Working PB+ GP Design. PB+ GP Unit/ Stn No under. Tech-I SSE(Bridge)/ PB-1 + GP Sr.Tech PB-2 + GP SSE(Bridge) 01 Kisan jal (SC) (B.Smith)/ TIG TIG Rs.2800/- (B.Smith) Rs.4200/- / TIG</p><p>Tech-I SSE(P.Way)/ PB-1 + GP Sr.Tech PB-2 + GP SSE(P.Way) 02 S.Maharana (UR) (B.Smith)/ SBP SBP Rs.2800/- (B.Smith) Rs.4200/- / SBP</p><p>NOTE-</p><p>1. The above named staff have been declared suitable for promotion to the post of Sr.Tech (B.Smith) in PB-2 with Grade Pay Rs.4200/- vide this office Memo.No.ENGG/58/2012 dtd.31.05.2012. 2. The staff promoted to the post of higher grade may be advised to exercise their option for fixation of pay in promotional grade within one month from the date of issue of this office order in terms of RBE No.138/07 & 132/08. 3. The promotion of the above named staff is provisional subject to they are free from SPE/Vig/D&A/ cases if any pending against them. 4. The date of effect may be intimated to this office for record.</p><p>(P.B.Mondal) Divnl.Railway Manager(P)/SBP</p><p>No.SBP/DPO/ENGG/Promotion/Posting/Sr.Tech(Artisan)/2012 Date.05.06.2012</p><p>Copy forwarded for information and necessary action to: Sr.DFM/SBP, Sr.DEN(Co)/SBP, ADEN/SBP & ADEN/Bridge/SBP, SSE(Br)/TIG, SSE(P.Way)/SBP, O.O.Book, P/File and staff concerned. .</p><p>Divnl.Railway Manager(P)/SBP EAST COAST RAILWAY Office of the Divnl.Railway Manager (P) Sambalpur O.O No:ENGG/61/2012 Date.08.06.2012 With the approval of the competent authority , the following transfer / posting order is issued to have immediate effect. 1. Sri Labindra Dansana, Jr.GK in PB-1 `5200-20200/- with Grade Pay `1800/- working under SSE(P.Way)/Gorakhnath of KUR Division, released on 04.06.2012 from KUR Division vide DRM(P)/ KUR’s letter No. P/Engg/IDT/Gr’D//LD/12 dtd.04.06.2012 on Inter Divisional Mutual Transfer with Sri Brajabandhu Das , Trackman in PB-1 `5200- 20200/- with Grade Pay `1800/- under SSE(P.Way)/RAIR of this Division on reporting to this office on 05.06.2012, is hereby posted as Jr.GK in his existing Pay & Grade Pay under SSE(P.Way)/RAIR. 2. Sri Brajabandhu Das, Trackman in PB-1 `5200-20200/- under SSE(P.Way)/RAIR of SBP Division of ECoR is hereby transferred to KUR Division on Inter Divisional Mutual Transfer with Sri Labindra Dansana, Jr.GK in PB-1 `5200-20200/- with Grade Pay `1800/- working under SSE(P.Way)/Gorakhnath of KUR Division. </p><p>NOTE: 1. The above Inter Divisional Mutual Transfer/posting is arranged at their own request. Hence they are not eligible for any transfer privileges as per extant rule. 2. The seniority of the above candidates will be assigned at the new unit as per extant rule as applicable in the case of such Transfer. 3. Sri Brajabandhu Das , Trackman working under SSE(P.Way)/RAIR may be directed to this office with proper identification Memo and two recent passport size photographs duly attested by a Gazetted Officer (on back side of the photo) of concerned department for his final release to KUR Division of E.Co.Railway. 4. Sri Brajabandhu Das should submit the NOC from the Bank where his monthly salary is credited & clearance certificate from E.Co.Railway Employees’ Co-Operative Credit Society Ltd./Sambalpur Branch to this office in view of his transfer. 5. The period of from 05.06.2012 to 08.06.2012 may be treated as waiting for posting against the staff at Srl.No.1 Sri Dansana. 6. The staff at Srl.No.2 Sri Das should vacate the Railway Quarter, if any, under his occupation and also surrender railway equipments/materials if any under his possession before moving on transfer to KUR Division of E.Co.Railway. </p><p>Specimen signature of Sri Labindra Dansana (P.B.Mondal) Divisional Personnel Officer E.Co.Railway/SBP No.SBP/DPO/Staff/Stores/MACPS/PKC/12 Date.08.06.2012 Copy forwarded for information and necessary action to: Sr.DFM/SBP, Sr..DEN(Co)/SBP, DRM(P)/KUR, ASEN/RAIR, SSE(P.Way)/RAIR, Ch.OS(Bills), O.O.Book, P/File and staff concerned . </p><p>(P.B.Mondal) Divisional Personnel Officer E.Co.Railway/SBP</p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    22 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us