Cover Sheet and Instructions s1

Cover Sheet and Instructions s1

<p>Project Name: { } Project No.: { }</p><p>APPROVED DOCUMENT—This document is approved by the Office of the President and Office of the General Counsel for use by the Facility and is available on computer diskette (see Introduction to the Facilities Manual, “Approved Documents”).</p><p>Cover Sheet and Instructions FIELD ORDER</p><p>PURPOSE OF DOCUMENT: CROSS-REFERENCES TO FACILITIES MANUAL (FM): CONTENTS: FOR USE WITH:  Long Form  Short Form Brief Form (Not Applicable to Some Documents) (LF) (SF) (BF) COMPLETED BY:  Filling In  Adding No Data Text Required ITS USE IS:  Required Optional</p><p>Completion Instructions:</p><p>1. University completes the form as required while the Work is in progress. See General Conditions Articles 4, 7, and 8.</p><p>2. University’s Representative, University and Contractor sign in appropriate places on last page.</p><p>3. University signs last.</p><p>Modifications and Additions:</p><p>(None)</p><p>Comments:</p><p>1. A field order does not require Contractors signature to be binding on Contractor.</p><p>2. A field order may or may not constitute a change in the work.</p><p>END OF COVERSHEET AND INSTRUCTIONS</p><p>June 16, 2008 Exhibit 8 Revision: 1 1 of 2 LF:EX-FO Project Name: { } Project No.: { }</p><p>FIELD ORDER</p><p>University of California Facility: </p><p>FIELD ORDER NO. </p><p>Project Name: </p><p>Project Number: Contract Date: </p><p>To Contractor: </p><p>Address: </p><p>DESCRIPTION OF WORK:</p><p>June 16, 2008 Exhibit 8 Revision: 1 2 of 2 LF:EX-FO Project Name: { } Project No.: { }</p><p>Estimated Adjustment Estimated Adjustment of Contract Sum: of Contract Time: </p><p>(Name of University's Representative - typed or printed)</p><p>By: (Signature)</p><p>(Title)</p><p>Date: </p><p>(Name of University's Designated Administrator -typed or printed)</p><p>(Signature) </p><p>(Title)</p><p>Date: </p><p>Note: If the Work described above constitutes a change, this Field Order will be superseded by a Change Order that will include the scope of the change in the Work and any actual adjustments of the Contract Sum and the Contract Time. </p><p>June 16, 2008 Exhibit 8 Revision: 1 3 of 2 LF:EX-FO</p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    3 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us