Initial Project Plan

Initial Project Plan

<p> INFORMATION TECHNOLOGY SERVICES Initial Project Plan</p><p>Project Identification Project Name: Phase: Initiation</p><p>Version: Date:</p><p>Project Sponsor:</p><p>Project Manager:</p><p>Schedule Create a high-level project schedule.</p><p>Date Event Priority (Low, Medium, High)</p><p>Communications Plan Describe the communication layout for the project. This should include the type of information being communicated, the stakeholder(s) it is being communicated to, the mode by which it will be delivered, and how often the process will take place.</p><p>Stakeholder Information Delivery Mode Frequency</p><p>Budget Plan Complete a budget plan including costs for labor, purchasing materials, and other costs.</p><p>Updated: April 8, 2018 Page 1 of 4 071cc4d0529216bc1df319eae5377c4e.docx (Ver. 1.0) INFORMATION TECHNOLOGY SERVICES Initial Project Plan</p><p>Labor List any incurred expenses as a result of labor. Note that in house labor does not need to be calculated and is not considered part of the budget. Only labor that requires additional payment beyond already existing labor costs is needed (i.e. outsourcing, additional help, designers, etc.) Name Position Hours Wages Total</p><p>Purchasing Materials List any major purchases of materials that the project will need. Item Quantity Cost Total</p><p>Other Costs List any other costs the project will need to incur. This includes permits, rights, and anything else not included in the first two categories. Item Quantity Cost Total</p><p>Quality Assurance Planning Define a plan, standards, and activities to control the quality of the project</p><p>Updated: April 8, 2018 Page 2 of 4 071cc4d0529216bc1df319eae5377c4e.docx (Ver. 1.0) INFORMATION TECHNOLOGY SERVICES Initial Project Plan</p><p>Quality Plan What is the overall plan for assuring proper quality of the project?</p><p>Quality Standards What are acceptable and unacceptable quality guidelines?</p><p>Quality Assurance Activities What activities will be used to control the quality standards and plan during the project?</p><p>Activity-Responsibility Matrix</p><p>Participation Codes: E = Execution; A = Approval Authority; I = Inform Execution- Those in charge of actually performing the activity Approval- Those in charge of approving the finished activity Inform- Those needed to be kept in the loop during the activity execution</p><p>Activity Name(s) Involved Participation Code</p><p>Updated: April 8, 2018 Page 3 of 4 071cc4d0529216bc1df319eae5377c4e.docx (Ver. 1.0) INFORMATION TECHNOLOGY SERVICES Initial Project Plan</p><p>Organizational Chart Define the project’s organizational structure.</p><p>Sponsor Approval to Proceed</p><p>By signing below, the project sponsor approves the project to proceed based upon all documentation and information up to this point.</p><p>Project Sponsor Name </p><p>Project Sponsor Signature</p><p>Date ______</p><p>Updated: April 8, 2018 Page 4 of 4 071cc4d0529216bc1df319eae5377c4e.docx (Ver. 1.0)</p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    4 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us