<p> Project Work Day-Station Model</p><p>Group Members Names: ______</p><p>ON THE BACK OF THIS SHEET, YOU WILL DO THE FOLLOWING:</p><p>3-Day Outlook-(forecast for 3 days) (today’s current weather and the next two days)</p><p>High and low temperatures</p><p>Type of Weather (rain, snow, sun, etc.)</p><p>Must relate to US Map’s weather</p><p>Your station model symbol will need to be for today’s forecast which will include the following items:</p><p>Temperature</p><p>Cloud Coverage</p><p>Wind speed </p><p>Wind direction</p><p>You will also need to tell your viewers the following: Barometric pressure (rising, falling, steady) Relative Humidity Dew Point Day 1 Forecast Day 2 Forecast Day 3 Forecast</p><p>Highlight which forecast will be your severe weather event.</p><p>Station Model Symbol:</p><p>Barometric Pressure: ______</p><p>Relative Humidity: ______</p><p>Dew Point: ______</p>
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages2 Page
-
File Size-