The Improvement Permit and Authorization to Construct Permit Number for Your Septic System Is

The Improvement Permit and Authorization to Construct Permit Number for Your Septic System Is

<p> Notice of Final Inspection of Septic System AFTER** Building Construction</p><p>The Improvement Permit and Authorization to Construct permit number for your septic system is:</p><p>I-______</p><p>The initial septic system inspection will be at the time of installation, and the final inspection will be after the building is constructed.</p><p>The following items must be completed before the final inspection. Final connection to permanent power will not be released until these items are completed.</p><p>1. The final grading and landscaping a. The top of the septic tank must have 6" or less soil cover or approved risers will be required. Risers must be inspected and leak-tested before backfilling around them. The top of the risers must extend at least to within 6" of grade. b. The maximum amount of soil cover over a drain field is to be 24" to 36" depending on the soil type. Contact our office before placing the soil on the drain field if you have any questions. c. All surface water shall be diverted away from the septic system and the designated repair area. 2. Driveway construction (the driveway shall not be constructed over any part of the septic system or repair area). 3. Water line installation (all water lines must be located at least 10' from any part of the septic system or repair area). 4. Gutters and gutter drains (all gutter drains must outlet away from the septic system and the designated repair area). 5. Utility lines (i.e., power, phone, and cable) shall not cross any part of the septic system or repair area. 6. The well (if applicable) shall be located as required by the well permit. 7. Any other items or conditions specified on the I/AC permit must be met. 8. Decks, porches, sunrooms, etc. shall meet the design setbacks to the septic system and repair area.</p><p>**After all of these items are completed, contact our office between 7:00 a.m. and 4:30 p.m. at (828) 692-4228. A final inspection will be done within 3 business days after our office is notified.</p><p>Final connection to permanent power will not be released until a final approval of these items is granted and an Operations Permit is issued.</p><p>09/10/2007</p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us