Government of Mizoram Office of the Chief Electrical Inspector Cum Mizoram Electrical Licensing Board: Electrical Inspectorate, P&E Department Zuangtui, Aizawl

Government of Mizoram Office of the Chief Electrical Inspector Cum Mizoram Electrical Licensing Board: Electrical Inspectorate, P&E Department Zuangtui, Aizawl

No.T-11012/10/2001-MELB/56 GOVERNMENT OF MIZORAM OFFICE OF THE CHIEF ELECTRICAL INSPECTOR CUM MIZORAM ELECTRICAL LICENSING BOARD: ELECTRICAL INSPECTORATE, P&E DEPARTMENT ZUANGTUI, AIZAWL. Aizawl, the 29th June, 2020 CIRCULAR Names and address of valid Electrical Licenced Contractors, who are authorised to execute electrical installation works in Saiha District are enclosed herewith along with their validity period. Class II, Electrical Contractors authorized by MELB mentioned in the enclosed format only are eligible to carry out any electrical wiring not exceeding 650V within the area mentioned above. However, Electrical Contractors/Agencies who renewed their Licenses after issue of this notification may be treated as valid Contractors as per the validity of their Licenses. This Circular supersedes the earlier Circular issued vide : No.T-11012/10/2001- MELB/55 Dt 19.03.2020. Sd/- R.Romawia Secretary, Mizoram Electrical Licensing Board, Zuangtui, Aizawl. Memo No. T-11012/10/2001-MELB/56 Dated Aizawl, the 29th June, 2020 Copy to : 1. The Chairman, Mizoram Electrical Licensing Board (MELB), for favour of information. 2. The Engineer-in-Chief, P&E Department, for favour of kind information. 3. The Chief Engineer (S.O) for favour of information. 4. The Superintending Engineer,Lunglei Power Circle, for favour of information. 5. The Executive Engineer, Saiha Power Division, P&E Deptt. for an information. 6. All Sub - Divisional Officers, under Saiha Power Division, P&E Deptt. for information. 7. The IT Cell, Office of Engineer-in-Chief for favour of information and to upload in the P&E Department website. Soft copy is sent through WhatsApp No. 8575517333. Secretary Mizoram Electrical Licensing Board LIST OF ELECTRICAL LICENSED CONTRACTOR ISSUED FOR THE 2nd Quarter i.e, July to September, 2020 SAIHA DISTRICT:- Sl. Name of Contractor Class authorized Valid upto License No. No & Address to work Jemimah Electronic Wiring for system Electrical Care MELB/C- 1 not exceeding 11.12.2020 New Saiha West SHA/2009/003 650V Prop : H.Dawma Wiring not Kolodyne Electrical exceeding 650 V Enterprise MELB/C- 2 Overhead lines & 29.04.2021 Tuipang, Siaha SHA/2019/004 Installation not Prop : S.Beisa exceeding 33,000V Wiring not SACH POWER exceeding 650 V Saiha MELB/C- 3 Overhead lines & Prop : KC SHA/2019/005 20.11.2020 Installation not Vanlalbiaktluanga exceeding 33,000V Secretary Mizoram Electrical Licensing Board .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us