Schedule of Construction and Finishes, Use Factor

Schedule of Construction and Finishes, Use Factor

<p> PRM018 DEPARTMENT OF PUBLIC WORKS SCHEDULE OF CONSTRUCTION AND FINISHES, USE FACTOR ANALYSIS AND ESTIMATE</p><p>PROJECT : WCS NO: REFERENCE NO:</p><p>This form is to be completed by the private Architect in every detail and submitted with the Sketch Plan and Sketch Plan Check List. Indicate applicable items by marking the appropriate line:-</p><p>1. FOUNDATIONS 5. WINDOWS 1.1 FOOTINGS TYPE : POSITION : 1.1.1 Conventional unreinforced concrete 5.1 Steel, painted...... strip...... 5.2 Steel, galvanized...... 1.1.2 Reinforced concrete...... 5.3 Aluminium, untreated...... 1.1.3 Foundation beams and piles average 5.4 Aluminium anodized...... length...... metres...... 5.5 Other (specify on separate sheet)...... 1.14 Raft foundations………………………. 6. CEILING TREATMENT 1.2 FOUNDATION WALLING TYPE : POSITION : 1.2.1 Brickwork (not reinforced)...... 6.1 Gypsum or fibreboard on brandering...... 1.2.2 Reinforced brick...... 6.2 Plaster on concrete...... 1.2.3 Reinforced concrete...... 6.3 Suspended under concrete...... 1.2.4 Other (describe on separate sheet). 6.4 Acoustic panels...... 6.5 Other (specify on separate sheet)...... 1.3 FINISH 7. FLOOR FINISH TYPE : ...... POSITION: ...... 1.3.1 Face brick...... 7.1 Vinyl asbestos tiles...... 1.3.2 Plaster and paint...... 7.2 Granolithic...... 1.3.3 Precast terrazzo...... 7.3 Ceramic...... 1.3.4 Other (describe on separate sheet)..... 7.4 Wood Mosaic...... 7.5 Concrete paving...... 2. SUPER STRUCTURE 7.6 Other (specify on separate sheet)...... 2.1 Load bearing brickwork...... 8. EXTERNAL SUN PROTECTION 2.2 Reinforced concrete frame...... Required? (Described on separate sheet)...... 2.3 Structural steel frame...... 9. SPECIAL GLAZING 2.4 Beam and panel slab floors...... Required? (Describe on separate sheet)...... 2.5 Other (describe on separate sheet)...... 10. USE FACTOR ANALYSIS 3. EXTERNAL WALLING SYSTEM Total area of building, all floors but exluding basement TYPE : POSITION : ...... square metres 3.1 Brick with the following facings: Total net usable area. excluding corridors, foyers 3.1.1 Face brickwork...... toilets. engineering service rooms ...... square metres 3.1.2 Plaster and paint...... Usable area expressed as a percentage of the total area 3.1.3 Precast terrazzo...... 3.1.4 Other (describe on separate sheet) 11. ESTIMATE 4. INTERNAL WALLING SYSTEM All inclusive estimate of cost of service excluding -VAT 4.1 Brick, plaster and paint...... R...... 4.2 Other (describe on separate sheet)...... </p><p>______Note: Describe on a separate sheet any additional features likely to affect the estimate. If necessary, also elaborate in like manner on any items appearing on this sheet, quoting the relevant reference numbers</p><p>PRIVATE ARCHITECT PRINCIPAL AGENT </p><p>DATE DATE</p><p>1/4/2004</p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us