<p> COMPANY DAILY JOB SAFETY ANALYSIS (JSA) SUPERVISOR (Print Name): DATE: WORK LOCATION (BE EXACT): SHIFT (Circle one): 1 2 GENERAL TASK DESCRIPTION:</p><p>STEP 1. TASK ACTIVITY – LIST ALL BASIC JOB STEPS. USE ADDITIONAL SHEET IF NEEDED. 1 2 3 4 5 6 7 8 9 10 POTENTIAL HAZARD LIST (LIST ALL OTHERS NOT SHOWN) 1 Electrocution/Shock/Arc Flash 11 Vehicle Traffic 21 Poor Access to Work 31 Underground Utilities 2 Fall from Heights 12 Railway Traffic 22 Noise 32 Falling Objects & Debris 3 Overhead Work 13 Welding Fume 23 Flammable/Combustible Mat’l 33 Obstructed Vision 4 Lifting: Manual or Mechanical 14 Welding Arc 24 Fire 34 Power Lines 5 Rough / Sharp Material 15 Excavations 25 Compressed Air 35 Dehydration 6 Slippery / Uneven Surfaces 16 Lead Paint 26 Poor Lighting 36 7 Rotating / Moving Machinery 17 Asbestos 27 Confined Space 37 8 Hot Surfaces 18 Silica Dust 28 Chemical Exposure 38 9 Pinch / Crush / Nip Points 19 Inorganic Arsenic 29 Heat / Cold Stress 39 10 Flying Particles 20 Poor Work Position 30 Repetitive Motion 40</p><p>STEP 2. ENTER THE NUMBER CODE FOR EACH HAZARD FOR ALL JOB STEPS LISTED IN STEP 1 ABOVE. LIST ALL PREVENTION MEASURES & CORRECTIVE ACTIONS FOR EACH HAZARD. HAZARD NUMBER CORRECTIVE ACTIONS TAKEN TO ENSURE SAFETY CODE (USE ADDITIONAL SHEETS IF NEEDED)</p><p>STEP 3. SAFETY CHECKLIST - CHECK ALL ITEMS THAT APPLY TO YOUR JOB OR TASK. COMPANY DAILY JOB SAFETY ANALYSIS (JSA) Y N Y N Y N FIRE PROTECTION: PPE NEEDED: HAZARDOUS ENERGY CONTROL Fire Blanket or Plates Face Shield GFCI on All Circuits Welding Screens Monogoggles Lock-Out / Tag-Out Flammables Removed Hearing Protection Electric Tools/Cords Inspected Suitable Fire Extinguisher/Hose Gloves for Specific Hazard High Voltage Lines Identified LEL Measured Respiratory Protection Mechanical Energy Devices Secure Fire Watch on Duty Eye Wash Station/ Safety Shower Splash/Chemical Clothing HOUSEKEEPING: PERMITS NEEDED: Foot Protection/Metatarsal Guard Cords, Leads, Hoses Elevated 7 Ft. Hot Work Rubber Boots Trash/Scrap Containers Confined Space Entry Fall Protection Line Breaking Hi-Vis/reflective vest WORK PLATFORMS: Personnel Lift Basket Ladders Inspected Pre-Lift Rigging BARRICADES/WARNINGS: Scaffold OK for Use & Inspected Critical Lift Plan Caution (Yellow) Aerial/Scissor Lifts Inspected Excavation Danger (Red) Demolition Hard Barricade ABATEMENT NEEDED: Flashing Lights Lead Paint Air Horns / Sirens Asbestos</p><p>STEP 4. POST-TASK FOLLOW-UP – SUPERVISOR TO COMPLETE AFTER SHIFT/JOB ENDS. Job Start Time: All Lock & Tags Removed? YES NO NA Job End Time: Area Cleaned / Secured & Tools Stowed? YES NO List any other safety hazards found during the course of this job/task: Did any injuries occur? YES NO Supervisor’s Signature: If YES, who was injured? ______(sign here after ALL items are complete) X</p><p>CREW SIGN-IN BEFORE TASK CREW SIGN-OUT AFTER TASK I understand the safety precautions and have the I have worked safely today and have not been training to perform this task safely. injured.</p><p>SIGN THIS COLUMN AT SHIFT START SIGN THIS COLUMN AT SHIFT END</p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us