
<p> news El Paso District 13301 Gateway West El Paso, Texas 79928-5410 ______(915) 790-4341 FAX (915) 790-4259 TxDOT’s five goals: reduce congestion ▪ enhance safety ▪ expand economic opportunity ▪ improve air quality ▪ increase the value of transportation assets. SPUR 601 PROJECT UPDATE</p><p>FOR IMMEDIATE RELEASE: CONTACT: September 10, 2009 Blanca M. Del Valle 790-4341</p><p>The following closures will continue through Saturday, September 12 from 9 a.m. to 4 p.m.:</p><p>Complete closure of the southbound Fred Wilson Exit Ramp </p><p>Expect alternate lane closures at the following intersections: Global Reach Dr. Constitution Dr. Purple Heart Memorial Highway (Loop 375) </p><p>Alternate right and left lane closures (east and westbound) on Fred Wilson Ave., between Dyer St. (BU 54) and Airport Rd.</p><p>The alternate left and right lane closures (north and southbound) on Global Reach Dr., between Spur 601 and Walter Jones Blvd. </p><p>Left lane closure on Gateway North, between Fred Wilson Ave. and the Fred Wilson Entrance Ramp</p><p>Alternate right and left lane closures (north and southbound) on the Purple Heart Memorial Highway (Loop 375), between Railroad Dr. and Montana Ave. (US 62/180)</p><p>The ramps at the Spur 601 / Loop 375 Intersection will be closed at alternate times during the day.</p><p>SUNDAY, SEPTEMBER 13 CLOSURES from 3 a.m. to 5 a.m.: The Fred Wilson Exit and Entrance Ramps on US 54, both north and southbound will have temporary closures. Crews will perform various operations on a ramp; once operation is completed they will open the ramp and move onto the next ramp.</p><p>Complete closure of Gateway North, between Cassidy Rd. and Fred Wilson Ave.</p><p>COMPLETE CLOSURE of Gateway North, between Fred Wilson Ave. and Broaddus Ave., beginning Monday, September 14 through Wednesday, September 23, nightly from 8 p.m. to 5 a.m. (the following morning).</p><p>-30-</p><p>ALL WORK IS DEPENDENT UPON WEATHER CONDITIONS</p>
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages1 Page
-
File Size-