Job Initiation Form - Logistics Information

Job Initiation Form - Logistics Information

<p>Job Name / RA # Recycling Logistics Form This document is to be provided on all jobs. This form, a properly signed Recycling Agreement and a negative asbestos survey report for each jobsite must be provided and approved by Armstrong before Armstrong arranges a pick up. Return required documents to Armstrong Recycling Center: Fax: 1-800 572 8324 or 1-888 396 0877. Contact our Armstrong Recycling Center directly Phone: 1-877 276 7876, options 1 & 8.</p><p>A. Quantity of Material to Recycle: SF of material to recycle: sf or # of pallets</p><p>B.Address for Pickup:</p><p>Building Name: Street: City: State: Zip: </p><p>Jobsite Contact Name: Phone: </p><p>Jobsite Contact Fax Number: </p><p>C. Pick Up Date: Estimated date needed for pickup (list all dates if more than one trailer load) Please allow a minimum of three (3) days to a maximum of five (5) days for a shipment to be scheduled. </p><p>Load #1 Load #2 </p><p>D. Special Loading Requirements? Loading Dock height or size, parking, city/state requirements, other trade traffic that needs to be factored into this pickup?</p><p>E. Job Details: List each project/owner for each job that is part of this shipment. If material from several jobsites is consolidated in one truckload, an Armstrong-approved Asbestos Survey must be on file with Armstrong for each jobsite List each site separately. Use page 2 for additional jobsites. needed.</p><p>1. Building Owner or Tenant: General Contractor: Demolition Contractor </p><p>Project Location (Address): B. Same as above </p><p>F. Documentation: Is a LEED letter needed? Yes No (If yes, indicate where LEED letter should be sent) </p><p>Recycling Recognition: Please indicate if a recycling certificate is to be issued to Recycler: Yes - Please include details of recipient: Company Name (indicate exact wording): </p><p>Contact Information to send certificate: </p><p>Recycling Logistics Form</p><p>E. Additional Sites: List each project/owner for each job that is part of this shipment. If material from several jobsites is consolidated in one truckload, an Armstrong-approved Asbestos Survey must be on file with Armstrong for each jobsite List each site separately. </p><p>2. Building Owner or Tenant: General Contractor: Demolition Contractor: </p><p>Project Location (Address): </p><p>3. Building Owner or Tenant: General Contractor: Demolition Contractor: </p><p>Project Location (Address): </p><p>4. Building Owner or Tenant: General Contractor: Demolition Contractor: </p><p>Project Location (Address): </p><p>2</p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us