CH-P05-6.03-F3 Backcharge Notice - Purchase Orders

CH-P05-6.03-F3 Backcharge Notice - Purchase Orders

<p> EXHIBIT C - ATTACHMENT C-11-1</p><p>Date Contract Number Back-Charge Number Contractor</p><p>I. Description of Back-Charge work: BACK-CHARGE NOTICE</p><p>Required completion of Back-Charge work to meet Project Schedule </p><p>II. Pricing Basis (check applicable basis): Agreed lump sum price of $</p><p> or </p><p>Actual incurred cost, plus mark up in accordance with Part III below. Estimated to be $ </p><p>III In accordance with Exhibit C Section 11 Back-Charge Procedure 1 Actual cost of material and supplies, plus ten percent (10%). 2 Design Engineering, cost plus thirty percent (30%) 3 Actual other costs to CH2M HILL for CH2MHILL or others to perform the work described herein plus ten percent (10%) 4</p><p>IV. Confirmation of Verbal Notice to Subcontractor from CH2M HILL</p><p>Date and time called: Subcontractor Representative called or spoken to:</p><p>V Authorization by Subcontractor: (Delete as appropriate) Subcontractor hereby agrees to complete the work described in Part I above by the Completion date stated. OR Subcontractor understands and agrees that CH2M HILL shall perform, or cause to be performed, the work described in Part I - Description of Back-Charge work in accordance with the provisions of the Subcontract and that Subcontractor shall compensate CH2M HILL in accordance with the rates, prices, terms and conditions set forth therein.</p><p>(Signature Contractor Authorized Representative)Title Date</p><p>Attachment C-11-1, Back-Charge Notice Form Page 1 of 2 Form Rev 0, 2013-Dec-5 VI. Completion of the work required by this Back-Charge Notice: CH2M HILL confirms the work described Part 1 herein is now considered complete.</p><p>(Signature CH2M HILL Authorized Representative) Title Date</p><p>VII Final Back-charge Value: CH2M HILL confirms that in accordance with this Back-Charge Notice the Subcontractors work described Part 1 herein has been completed by others and, in doing so, has incurred costs in the total amount of ( ), which shall be back-charged to the Subcontractor in accordance with the provision of the Subcontract.</p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us