Product Lifecycle Management: an Industrial Perspective

Product Lifecycle Management: an Industrial Perspective

<p>SGGS Institute of Engineering and Technology - Global Initiative of Academic Networks (SGGS GIAN) “Product Lifecycle Management: An Industrial Perspective” Course details D Date Resource Session Content Time a Person y 1 22/08/2016 Dr. JVL First  Introduction to PLM and Functionality 11:30 am to 12:30 pm Venkatesh  Product data and Processes Second  PLM philosophy 01:30 pm to 03:30 pm Third  PLM software’s overview 04:00 pm to 06:00 pm 2 23/08/2016 Mr. Atul First  Introduction 10:30 am to 12:30 pm Khiste  Overview of PDM/PLM from organization point of view and organization type: (White board)  ISA S95 architecture (PLM – MES- ERP)  PLM functions, definition architecture, benefits and terminology (Case study: PLM implementation at Oakland University) Second  Need for cloud based PLM system for global collaboration 01:30 pm to 03:30 pm  Advanced PLM tools and capabilities evaluation  Organization management in PLM system for Day 2 assignments Third  PLM big picture 04:00 pm to 06:00 pm Dr. Patrick Hillberg  Digital Twins and PLM  Virtually perfect (Virtualization) 3 24/08/2016 Mr. Atul First  Integration of CAD with PLM system 10:30 am to 12:30 pm Khiste  Overview Design in CAD and manage in PLM Second  CAD integration with PLM (practical session) 01:30 pm to 03:30 pm  Basics of creation and viewing 3D data in CAD tools  Authoring CAD parts in standalone mode vs. PLM integrated mode Third  Creating EBOM and MBOM (Engineering and manufacturing 04:00 pm to 06:00 pm bill of material) in PLM system. 4 25/08/2016 Mr. Atul First  Collaborative product design and engineering change 10:30 am to 12:30 pm Khiste management (theory)  Introduction MPP (manufacturing process planner) Second  Revision management - Unique numbering scheme using PLM 01:30 pm to 03:30 pm application.  Product Variants and Options Third  3D CAD assembly creation through collaboration using PLM 04:00 pm to 06:00 pm Tool. (group assignment) 5 26/08/2016 Mr. Atul First  Future of PLM – Miscellaneous technologies –Augmented 10:30 am to 12:30 pm Khiste reality, Motion tracking, 6D CAD assembly  Plant simulation in context of PLM Second  Maintaining single source of truth using PLM application 01:30 pm to 03:30 pm  PLM systems engineering. (RFLP Data model)  (Aerospace use case) Third  Systems engineering (Mechatronics concept designer) 04:00 pm to 06:00 pm  Resource Classification. 6 27/08/2016 Dr. JVL First  Practice Session 10.30 to 1.30 Venkatesh </p><p>Second  Examination on topics covered 2.30 to 3.30</p><p>7 29/08/2016 Mr. Sanjay First  Overview of Computer Aided Process Planning 10:30 am to 12:30 pm Ahire Second  Machining Process Planning and PLM Data Management 01:30 pm to 03:30 pm (Digital Manufacturi Third  Importance of Bill of Design and Bill of Process in overall 04:00 pm to 06:00 pm Note: 1. It will be a certification program for the faculty, staff and industry persons. 2. It will be a mandatory credit course for the students of F.Y. M. Tech PLM and these credits will be treated as over and above 3. Based on exam evaluation the credits will be awarded to the participants.</p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    3 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us