Management Review

Management Review

<p> Operational Procedures</p><p>Section 4 (4.4.1) </p><p>Management Review Document Ver. 01 Date July’05</p><p>Management Review </p><p>1.0 Introduction:</p><p>The Management of Briarcare Ltd have committed to a process of continual improvement. It is necessary to review all processes at regular intervals in order to evaluate their effectiveness and implement any corrective or preventive actions.</p><p>2.0 Objective:</p><p>To ensure the continued stability, adequacy, applicability and effectiveness of the Quality Management System</p><p>3.0 Procedure:</p><p>General</p><p> Arrange Management Review Meetings at planned intervals.  Consider recommendations from audit and management reports.  Implement and subsequently re-review all agreed actions.  Retain all records in accordance with document & data control requirements.  Formal written records are required and must be maintained.  These should include:</p><p>Ο Agenda Ο Non-conformances Ο Corrective actions Ο Preventive actions Ο By whom Ο By when Ο Expected outcomes Ο Actual outcomes</p><p>Text, graphics and pictures published in this document are the intellectual property of Briarcare Ltd. They may not be passed to other parties, either wholly or in part, except with the express permission of Briarcare Ltd</p><p>Br-SM/OP 4.4.1 Issue 01 Authorised By K Stokeld Printed on 09/01/2018 Page 1 of 4 Operational Procedures</p><p>Section 4 (4.4.1) </p><p>Management Review Document Ver. 01 Date July’05</p><p>Management Review</p><p>The Management Review Meeting:</p><p> The Quality Manager will convene a Management Review Meeting quarterly. Additional meetings may be convened as deemed necessary.  The Group Director will Chair each meeting, which will be attended by other of the Directors as necessary and the Quality Manager plus other members of staff who may be able to assist with any of the agenda items.  The meeting agenda shall include the following topics for review, analysis and discussion if applicable:</p><p>Ο The results of internal and second/third-party quality audits. Ο Supplier performance. Ο Customer satisfaction, comments and the employee feed-back process. Ο Significant non-conformances and the corrective and preventive actions taken. Ο Concessions and credit notes which have been raised. Ο Training needs. Ο Potential problems with the services provided and the preventive actions taken. Ο A review of selected sections of the QMS, typically those sections that have been subjected to internal audit, plus Policies. Ο Confirmation that the QMS continues to operate effectively. Ο Suggestions for continual improvement to the Processes via the employee feed-back process.</p><p> The Quality Manager shall ensure that all relevant information and data are available for review.  The whole System must be reviewed annually.  Discussions will be recorded on the Management Review Meeting Minutes F/40, along with the agreed actions, those responsible for taking the actions and the date by which the actions will be completed.  Actions will be such as to prevent a recurrence of the problem.  Actions from previous meetings will be discussed and closed out only if completed satisfactorily. </p><p>Text, graphics and pictures published in this document are the intellectual property of Briarcare Ltd. They may not be passed to other parties, either wholly or in part, except with the express permission of Briarcare Ltd</p><p>Br-SM/OP 4.4.1 Issue 01 Authorised By K Stokeld Printed on 09/01/2018 Page 2 of 4 Operational Procedures</p><p>Section 4 (4.4.1) </p><p>Management Review Document Ver. 01 Date July’05</p><p>Management Review</p><p> The reasons for any actions remaining outstanding will be raised with the objective of making available all necessary resources to resolve the problem.  Actions that have been implemented to overcome problems that have arisen during the period between Management Review Meetings will be discussed to assess their effectiveness.</p><p>After The Management Review Meeting</p><p> Copies of the minutes of Management Review Meetings will be made available to those actioned.  The Quality Manager will retain the original copy of the minutes as part of the Company’s Quality Records.  The minutes of the Management Review Meeting may be generated and distributed electronically but must be retained in the appropriate file.</p><p>4.0 Persons Responsible:</p><p>Board Of Directors Group Director Quality Manager Managers All employees – as appropriate</p><p> It is the responsibility of the Board of Directors to ensure the continued effectiveness of the QMS.  The Group Director is responsible for authorising this procedure  The Group Director has delegated responsibility to the Quality Manager for maintaining the QMS on a day-to-day basis.  All Managers and employees have a responsibility to work to the procedures as detailed in the QMS</p><p>Text, graphics and pictures published in this document are the intellectual property of Briarcare Ltd. They may not be passed to other parties, either wholly or in part, except with the express permission of Briarcare Ltd</p><p>Br-SM/OP 4.4.1 Issue 01 Authorised By K Stokeld Printed on 09/01/2018 Page 3 of 4 Operational Procedures</p><p>Section 4 (4.4.1) </p><p>Management Review Document Ver. 01 Date July’05</p><p>Management Review</p><p>5.0 Associated Documentation and References:</p><p>Documents QM 4.4.1 Management Review</p><p>Records F/09 Non-Conformance Report/s F/10 Corrective Actions Request/s F/11 Preventive Actions Request/s F/38 Audit Report/s F/40 Management Review Meeting - Minutes F/50 Concessions Form/s F/84 Customer Satisfaction Survey Forms</p><p>6.0 Document History:</p><p>This section shows the approval and revisions of this document since its first issue. A vertical line in the left margin opposite the change will usually indicate changes from the previous version.</p><p>Version Comments Approved Date Date of by approved next review 01 First issue of document Q M 08.07.05 July 2005</p><p>Authorised:</p><p>K Stokeld 08.07.2005 Group Director Date:</p><p>Text, graphics and pictures published in this document are the intellectual property of Briarcare Ltd. They may not be passed to other parties, either wholly or in part, except with the express permission of Briarcare Ltd</p><p>Br-SM/OP 4.4.1 Issue 01 Authorised By K Stokeld Printed on 09/01/2018 Page 4 of 4</p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    4 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us