Compliance Sampling Site Change Form

Compliance Sampling Site Change Form

<p> COMPLIANCE SAMPLING SITE CHANGE FORM</p><p>Requests to change Bacteria, Chemical, or Lead and Copper sampling sites must be submitted in writing. Please print this form, fill it out and email or fax the changes to our office for review prior to collecting the sample at a new sampling location. Sample results taken from sites that do not match the DES approved sites may be rejected.</p><p>For DES use only: Name of System: System Type: C P N Town: PWS ID: Date Requested: By Whom: </p><p>BACTERIA Fax or email Bacteria changes to: (603) 271-3490 or [email protected] For Bacteria sites, samples should be taken from site(s) that are representative of water throughout the distribution system. Sample site change requests from the well, source tap, storage tank, or the first and last connection may not be approved. </p><p>OLD Site ID(s) LOCATION / DESCRIPTION (ex: 001, 002, etc.) (Site description not to exceed 30 characters)</p><p>NEW Site ID(s)</p><p>Reason for requested change(s): </p><p>For DES use only: Approved: NOT approved: By:______Date:______</p><p>CHEMICAL Fax or email Chemical changes to: (603) 271-5171 or [email protected] For Chemical sites, samples should be taken after treatment at the entry point to the distribution. Note that when sampling for nitrate/nitrite, either turn off the chlorinator or take samples before chlorination. </p><p>OLD Site ID(s) LOCATION / DESCRIPTION (ex: 001, 501, etc.) (Site description not to exceed 42 characters)</p><p>NEW Site ID(s)</p><p>Reason for requested change(s): </p><p>For DES use only: Approved: NOT approved: By:______Date:______LEAD/COPPER Fax or email Lead/Copper changes to: (603) 271-3490 or [email protected] For Lead and Copper sites, samples should be taken from drinking water sites across the distribution system. a) If a site is active, it will show on your Master Sampling Schedule unless you are on reduced monitoring. b) If a site is inactive, and you wish to sample there, you MUST contact us before you take the sample. Sample results taken at inactive sites will be rejected. c) If a site’s name has changed (street names, room numbers, buildings), you MUST contact us before you take the sample. Lead and Copper samples may only be taken from “active” sites. If you are unsure of your active sites, need to add active sites, or need to make an “inactive” site active again, please contact Joan Fitzsimmons. </p><p>OLD Site ID(s) LOCATION / DESCRIPTION (ex: 001, 002, etc.) (Site description not to exceed 40 characters)</p><p>NEW Site ID(s)</p><p>Reason for requested change(s): </p><p>For DES use only: Approved: NOT approved: By:______Date:______</p><p>Email or fax to Drinking Water and Groundwater Bureau staff</p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us