Engineering/Technical Requirements for Amrs

Engineering/Technical Requirements for Amrs

<p> Engineering/Technical Requirements for AMRs</p><p>Planning Document Planning document or technical memorandum should follow the FACT engineering guidelines for preparing engineering reports. Not all the sections in the guidelines may be applicable. At a minimum, the Technical Memorandum should include project planning area, existing facilities and need for the project, alternatives considered, chosen/proposed alternative, cost effectiveness analysis and cost estimates and conclusion. Technical memo should be submitted to OWRB and DEQ for review and approval.</p><p>Plans and Specifications Plans may include a map of the system and or a map of the project planning area. The specifications may include detailed info and specifications about the AMRs and all the other conditions for a specifications. The front end documents should specify the procurement process (solicitation or bidding process). Plans and Specifications should be submitted to OWRB and DEQ for review and approval.</p><p>Bidding/Solicitation for Quotes The bidding process must follow the Oklahoma Competitive bidding Act. At least three quotes must be obtained from different firms. For CWSRF DBE solicitation must be met. All bid and contract documents will be reviewed as all other projects.</p><p>Loan Terms The design or expected life of AMRs is typically in the range of 10 to 15 years. In order to do a 20 year loan, the borrower must demonstrate that the AMRs will last through the loan duration, or the borrower must provide a maintenance and replacement plan at the time of loan closing and provide additional units (meters) as spare for future replacement in accordance with the scale below. </p><p>No. of Meters to be Replaced Percent Spare Meters (Additional Units) % 0-500 5 501-1000 3 > 1000 2</p><p>Additional subsidization may be available for AMR project. The borrower must demonstrate the percent water efficiency or savings to be achieved by installing the AMRs.</p><p>Construction and Project Oversight Construction and project oversight will be just like all other projects.</p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us