Supplier Source Inspection Request; 11-054

Supplier Source Inspection Request; 11-054

<p>SUPPLIER SOURCE INSPECTION REQUEST </p><p>NOTE: Source inspection requests are to be requested by the supplier’s quality department personnel only and emailed to [email protected]. NOTE: All shaded fields are to be completed by BAE Systems SQA, QA Engineer or Cognizant Quality CAM.</p><p>Date requested: Date ready: </p><p>To: SQA: Information only Action required Procurement: Information only Action required QA Engineer or Cognizant Information only Action required Quality CAM: Other: Information only Action required Inspector: Information only Action required Name of requestor: Phone number: E-mail:</p><p>Purpose of visit: Comments: Security Clearance Required: Source Inspection Yes No Other (see comments) Supplier name: Company name of where the source inspection is to take place:</p><p>Address for this visit: Street: City, State, Zip: Supplier’s QA contact name: Phone number: E-mail:</p><p>P.O. number: Line: Quantity: Part number: HDW/DWG revision to which it was built:</p><p>Description: Special description codes:</p><p>Inspection type: New part or RMA: Witness sample: Was SVR requested: S/N: Choose one Choose one Yes No Yes No P.O. HDW part revision: P.O. DWG revision: QA Engineer: Promise date:</p><p>Order quantity: Balance due: Buyer: Inspection and QA codes:</p><p>QA notes:</p><p>Project: PDM HDW part revision: PDM DWG revision: SRC, TipQA source/receiver number:</p><p>Page 1 of 3 11-054 (29 Dec 15) SUPPLIER SOURCE INSPECTION REQUEST </p><p>P.O. number: Line: Quantity: Part number: HDW/DWG revision to which it was built:</p><p>Description: Special description codes:</p><p>Inspection type: New part or RMA: Witness sample: Was SVR requested: S/N: Choose one Choose one Yes No Yes No P.O. HDW part revision: P.O. DWG revision: QA Engineer: Promise date:</p><p>Order quantity: Balance due: Buyer: Inspection and QA codes:</p><p>QA notes:</p><p>Project: PDM HDW part revision: PDM DWG revision: SRC, TipQA source/receiver number:</p><p>P.O. number: Line: Quantity: Part number: HDW/DWG revision to which it was built:</p><p>Description: Special description codes:</p><p>Inspection type: New part or RMA: Witness sample: Was SVR requested: S/N: Choose one Choose one Yes No Yes No P.O. HDW part revision: P.O. DWG revision: QA Engineer: Promise date:</p><p>Order quantity: Balance due: Buyer: Inspection and QA codes:</p><p>QA notes:</p><p>Project: PDM HDW part revision: PDM DWG revision: SRC, TipQA source/receiver number:</p><p>Page 2 of 3 11-054 (29 Dec 15) SUPPLIER SOURCE INSPECTION REQUEST </p><p>P.O. number: Line: Quantity: Part number: HDW/DWG revision to which it was built:</p><p>Description: Special description codes:</p><p>Inspection type: New part or RMA: Witness sample: Was SVR requested: S/N: Choose one Choose one Yes No Yes No P.O. HDW part revision: P.O. DWG revision: QA Engineer: Promise date:</p><p>Order quantity: Balance due: Buyer: Inspection and QA codes:</p><p>QA notes:</p><p>Project: PDM HDW part revision: PDM DWG revision: SRC, TipQA source/receiver number:</p><p>BAE Systems SQA Supplier number: Open corrective actions:</p><p>BAE Systems QA Engineer or Cognizant Quality CAM BAE Systems QA Engineer or Cognizant Note: QA Engineer or Cognizant Quality CAM must have Source Quality CAM trip approval: Inspection Directions entered into TIPQA for all parts being Yes No inspected if trip is approved. Project/task code to be charged for labor: Project/task code to be charged for travel:</p><p>Commodity / Part Group (required) and Remarks:</p><p>BAE Systems Source Inspector Note: Inspector is responsible for completeness and accuracy of the completed form prior to scheduling source inspection with the supplier. Confirmed by: Source inspection date confirmed:</p><p>Page 3 of 3 11-054 (29 Dec 15)</p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    3 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us