Institutional Self-Study and Preparing for HLC Site Visit

Institutional Self-Study and Preparing for HLC Site Visit

<p> Institutional Self-Study and Preparing for HLC Site Visit Overall Timeline and Action Plans (First developed 08/2013; updated 08/2015) Timeline Quality Assurance Activities Current Status Fall 2013 Open Pathway electronic portal training and set-up Completed: HLC portal is open and set up.</p><p>Spring 2014 Establish a core project team that will lead the gathering of Completed: evidence and upload to the electronic portal on an on-going (1) project team established basis (per HLC Open Pathway requirement). Members of the (2) team met on 04/24 steering committee can later on become the Self-Study (3) review Open Pathway and HLC criteria begins criterion team leaders.</p><p>Summer 2014 Team meets 1-2 times and begin to discuss broader strategy Team met on August 27 Fall 2014-Spring . Project team continues to meet Completed: 2015 . Begin to form criteria teams . Team met on September 25 . Training of criteria teams . Electronic portal access assigned . Team met twice during winter term . 8 team members for attending HLC conference March 28-31; Highlights submitted to the Provost . Summer 2015 work plan drafted . Summer 2015 . Select and Identify criterion team members Completed . Prepare for kicking off self-study process . Team members identified . A kick-off event was planned . Steering Committee Discussed overall communication, file sharing, and team work plans.</p><p>Fall 2015-Summer Self-Study begins Self-study kick-off event: 9:00-11:00am, Friday, 2017 (2 years) September 18, Welch 205.</p><p>October 2017 Quality Assurance Report in place; campus review begins</p><p>November 2017 All documents in place; submit to HLC</p><p>October/November Mock site visit (as needed, invite 2-3 HLC peer reviewers Possible dates: October 20th, 27th, or November 10th of 2017 from nearby institutions for a 1-day mock visit) 2016. December 2017 Establish a team for coordinating site visit logistics</p><p>November 2017- Preparing for site visit; final touch-ups March 2018</p><p>3 days between HLC Site Visit March-May 2018</p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us