Routine Shutdown Form

Routine Shutdown Form

<p> SHUTDOWN REQUEST FORM Routine (Yellow) Emergency (Pink) Critical (Blue)</p><p>Today’s Date: 11/12/2008 See Attached</p><p>What systems are involved? Domestic hot and cold water Reason for routine shutdown. To replace shower valve in Housemaster's apt. Building and Rooms Directly Affected: W4-West Tower</p><p>Requested Date(s):9/28/09 Day(s): Monday Duration: 4 hours (Include prep time) Start Time: 9:00am End Time: 1:00pm</p><p>TRIGGER: Complete as much as you can of applicable areas. Forward to [email protected] and the appropriate zone. Shutdowns take five (5) business days to process. Trigger has primary responsibility for communication.</p><p>Trigger Info Name: Marsha Whelan Page/Radio #: Maximo #: Phone: 3-4324 Cell: E-mail: [email protected] Project #: Cost Object #: 1346800 R&M SAP #: (R&M Use only)</p><p>List names, groups of Facilities’ personnel and occupants contacted and have provided consent/notification to proceed. Electrical and HVAC (chilled water, etc.) shutdowns must involve IS at onset of action planning. Dept./Group Name Phone Dept. Group Name Phone IS Jeff Schiller ([email protected]) 3-8400 IS JJ Morey 3-1410 ([email protected]) Registrar Schedules Office 3-4788 (Classrooms)</p><p>Types of services affected, check as needed: POWER WATER AIR STEAM OTHER Access controls Chilled water Supply-ventilation High pressure Fire alarm Emergency Condenser water Supply-cooling Medium pressure Fire protect water generator Emergency power Pure water Supply-heating Low pressure Natural gas Building power Hot domestic Exhaust-laboratory Condensate return Odors Elevators Hot lab process Exhaust-general Smokes Computers Heating hot water Exhaust-toilet DRAINAGE Exhaust hood Telephones Cold domestic Compressed control Lab waste Lighting Cold lab process Compressed lab air Sanitary Corridor/stairs De-ionized Lab vacuum Storm drain</p><p>Investigated by: 1. 2. 3. 4. </p><p>****LOCK OUT/TAG OUT PROCEDURE IS REQUIRED****</p><p>Approved by: Mechanic Utili Fire al ty Prot.</p><p>DISTRIBUTION: After each stage, Warren Scott and Paul Stordy will determine distribution as required. Always include: Could include: Other: Trigger 2nd Shift Carp/Constr Zone A Bulletin Board 3rd Shift HVAC Zone B W. Scott Fire Protection Piping Zone C FCS Console Utility Struc/Paint Zone D Technical Elec/Controls Zone E </p><p>Revised: March 2001 P:\Public\Shutdowns\Shutdown Request.dot Cleared by/Signed by: Time: Date:</p><p>Revised: March 2001 P:\Public\Shutdowns\Shutdown Request.dot</p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us