Caltrans Ps&E/Constructability Review Checklist

Caltrans Ps&E/Constructability Review Checklist

<p> CALTRANS PS&E/CONSTRUCTABILITY REVIEW CHECKLIST</p><p>Project Information: - Co. – Rte. – PM: ______District/EA: ______</p><p>Reviewed By: ______Date: ______Functional Unit: HYDROLOGY</p><p>I certify that a thorough and complete constructability review has been performed by my staff:</p><p>______Signature of Functional Manager Date</p><p>PS&E Milestone Key Constructability Issues 30% 60% 95% Ultimate drainage basin design protects private property and freeway against flooding Minimum diversion of natural stream flow SAG points of depressed sections of alignment designed for 50-year storm Pumping plants designed according to Pumping Plant Design Manual Upstream and downstream affect on run-off is addressed Are water quality (surface groundwater) impacts anticipated and mitigated (detention and/or retention ponds required) Are dewatering systems needed</p><p>Previous suggestions/corrections addressed</p><p>11/30/2006</p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us