For Office Use Only

For Office Use Only

<p>1 For Office Use Only Permit # ______Fee $______Map # _____ /Lot # _____</p><p>TOWN OF BETHLEHEM SOLAR PERMIT APPLICATION</p><p>OWNER: ______Email: ______Address: ______Phone: ______Cell Phone:______</p><p>LOCATION OF PROPERTY: Map # ______Lot # ______Physical Address: ______Size of Lot: ______</p><p>INSTALLER: ______Email: ______Address: ______Phone: ______Cell Phone:______Licensed Electrician: ______Electrician’s License #:______</p><p>SYSTEM DESCRIPTION: A. Is the system to be interconnected to the local utility grid? Yes: ____ No: ____ If yes, provide a copy of the interconnection form showing an approval to install facility from the Electric Utility: Eversource ______Littleton Water & Light ______B. AC Rating of system (per manufacturer’s specs) ______C. DC Rating of system (per manufacturer’s specs) ______D. Provide a simple diagram, with the location of the safety disconnects and locations with the appropriate explanations of what these disconnects do and how much current is left beyond the disconnect. This diagram must be provided to and approved by the Bethlehem Fire Chief before installation. E. Inverter Manufacturer:______Model:______Rating (kw): ______UL 1741 listed Yes:______No:______F. Labeling- Show on attached plan G. Type of System: Ground Mounted: ______Roof Mounted:______If Roof Mounted: Rafter Size: ______x______Rafter Span:______‘ Rafters:______” on center If Ground Mounted attach site plan showing location and setbacks H. Cost of the System Installed: $______2 OWNER’S CERTIFICATION: I certify that, to the best of my knowledge, all of the information provided in this application is true. The proposed installation complies with the Bethlehem Zoning Regulations. I grant the Bethlehem Building Inspector, Fire Chief and/or Selectmen permission to enter my property for the purpose of inspection for the Solar Phot-Voltaic Installation. I acknowledge that the installation must be inspected by the Building Inspector prior to the system being utilized.</p><p>______Property Owner’s Signature Date</p><p>______Property Owner’s Signature Date</p><p>INSTALLER’S CERTIFICATION: I agree to comply with the State of New Hampshire Building Code. New Hampshire Fire Code and the 2014 edition of the National Electric Code. I certify that at all times that work involving the solar panels and connections will be done by a licensed NH Electrician.</p><p>______Installer’s Signature Date</p><p>PERMIT FEE: Permit Fee of $50 must be paid at the time of the application</p><p>PERMIT APPROVAL:</p><p>______Dave Wiley, Code Officer’s Signature Date</p><p>Required Inspections: □ Electrical □ Fire Inspection □ Final</p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us