CIGRE Study Committee N XX

CIGRE Study Committee N XX

<p>CIGRE Study Committee C2, « System Operation and Control »</p><p>PROPOSAL FOR CREATION OF A NEW WORKING GROUP *</p><p>Working Group C2.13 Name of Convenor : Rui Pestana, Portugal </p><p>Title of Working Group C2.13: Voltage and Var support in System Operation </p><p>Scope, deliverables and proposed time schedule of the Group :</p><p>Background : </p><p>With increased loading of the power system elements, the voltage support problems and in extreme cases voltage collapse, have increased in power systems. While the balancing services for real power and energy have been well established, there is hardly any functioning market for voltage and var support. The market rules are not harmonized and system operation depends on the interpretation of those rules to assure the reliability. In case of ambiguous rules, operator inaction may result is system wide disturbances. In addition Dispersed Generation, especially wind generators, poses different challenges to System operators for voltage control.</p><p>To maintain reliability there is a need to reconsider the voltage and var support in liberalized unbundled market The coordination of reactive power control between TSO & DSO and between TSOs in different jurisdictions is important to maintain a good voltage profile in a large system. Also the introduction of FACTs devices, which are under direct control of system operation and control, need better coordination with classical reactor / capacitor switching and transformer control. </p><p>Scope :The steps to be followed are: • Reactive Devices at the disposal of system operator • Techniques for Reactive power and voltage control • EMS Modelling, Control techniques, local and centralized • Finding systematic weak points for Voltage/var control in the power system • Voltage/Var during normal and emergency conditions • Implementation of Reactive Power Management • Reactive Power Management and De-Regulation</p><p>Deliverables : Paper in SC C2 -2009,</p><p>Report to be published as a technical brochure with summary in Electra.</p><p>Time Schedule : start : August 2007 Final report : End 2008</p><p>Comments from Chairmen of SCs concerned : </p><p>Approval by Technical Committee Chairman : Date :</p><p>* or Joint Working Group (JWG), or Task Force (TF), or Joint Task Force (JTF)</p><p>0c039db130ac37fb45e18a8de3ca9d5a.doc</p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us