Cal-PCA Requirements Development Workshop

Cal-PCA Requirements Development Workshop

<p>Cal-PCA Requirements Development Workshop</p><p>EXERCISE 2 – Requirement Set 3</p><p>No. Requirement Description Priority</p><p>1. Any processing environment, when fully configured and operational, shall Desirable not negatively impact the performance of any other processing environment.</p><p>Weaknesses: Accuracy Clarity Complete</p><p>Concise Verifiable Appropriate</p><p>Suggested Revision (this box will expand as the revision is inserted):</p><p>Page 1 of 4 Cal-PCA Requirements Development Workshop</p><p>EXERCISE 2 – Requirement Set 3</p><p>No. Requirement Description Priority</p><p>2. The department desires a solution that is free of hard-coded logic that Mandatory requires highly skilled technical resources to make complex changes that might be easily made if the system were properly architected and logically developed using current technology. Thus, the solution must be architected in a manner that authorized users (not technical staff – e.g., developers) have the ability to add, modify and delete transaction types, reason codes, and business rules (that govern how data is acted upon) through table entry.</p><p>Weaknesses: Accuracy Clarity Complete</p><p>Concise Verifiable Appropriate</p><p>Suggested Revision (this box will expand as the revision is inserted):</p><p>Page 2 of 4 Cal-PCA Requirements Development Workshop</p><p>EXERCISE 2 – Requirement Set 3</p><p>No. Requirement Description Priority</p><p>3. The bidder will assume the department’s current process of preparing the Mandatory product for direct mailing by the United States Postal Service. In addition, the bidder agrees to provide the subsequent updating of the system to indicate the mailing of the product after all products, including employee products, are produced and inspected for quality by the contractor. The Bidder must check “Yes” on the matrix indicating compliance, or “No” on the matrix indicating non-compliance with the requirement.</p><p>Weaknesses: Accuracy Clarity Complete</p><p>Concise Verifiable Appropriate</p><p>Suggested Revision (this box will expand as the revision is inserted):</p><p>Page 3 of 4 Cal-PCA Requirements Development Workshop</p><p>EXERCISE 2 – Requirement Set 3</p><p>No. Requirement Description Priority</p><p>4. Bidder will provide a floor plan depicting both the current and proposed Mandatory equipment together for parallel operation during the transition period. Bidder will submit Appendix H identifying the Bidder’s process to successfully implement a Conversion and Transition Plan. The Bidder must check “Yes” on the matrix indicating compliance, or “No” on the matrix indicating non-compliance with the requirement.</p><p>Weaknesses: Accuracy Clarity Complete</p><p>Concise Verifiable Appropriate</p><p>Suggested Revision (this box will expand as the revision is inserted):</p><p>Page 4 of 4</p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    4 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us