CHERRY STREET, Between Porter and Scott Avenues

CHERRY STREET, Between Porter and Scott Avenues

<p> Construction New Kosciuszko Bridge</p><p>NOTICE OF STREET CLOSURE CHERRY STREET, between Porter and Scott Avenues </p><p>Cross Street Traffic: Gardner and Varick Avenue Crossings – open to traffic Scott and Stewart Avenue Crossings – closed to traffic</p><p>Closure Start Date: October 22, 2014</p><p>Please Observe All Detour Signs </p><p>The New York State Department of Transportation (NYSDOT) has awarded a $555 million contract to construct Phase I of the new Kosciuszko Bridge. As part of the construction, Cherry Street will be closed to through traffic starting on October 22, 2014. Cross traffic to and from Scott and Stewart Avenues will also be closed. The Gardner and Varick Avenue crossings will remain open. </p><p>The new Kosciuszko Bridge will improve traffic safety, reduce congestion and improve travel speeds. Enhancements to the roadway will include extra lanes, wider lanes and a reduced incline creating longer sight lines and increased visibility. These improvements are projected to reduce traffic delays by more than 65% at peak hours. The project will also include a new bikeway/walkway on the bridge; new parks and open spaces; improved access to the waterfront; and enhancements to local streets. The project is part of the New York Works Program, created to generate jobs and increase economic development.</p><p>The project team will make every effort to minimize impacts during the construction phase. Some disruption and inconvenience typically occur on any construction project, including changes to vehicle and pedestrian traffic patterns, loss of parking, noise, vibrations, and dust. To promptly and proactively address community concerns, NYSDOT has hired a full-time community liaison, Christine Holowacz. Christine will be available to answer your questions, provide additional information and assist you in resolving construction-related issues. She can be reached at (347) 988-4412 or [email protected] . </p><p>Thank you in advance for your patience and cooperation during the construction. For more information, visit www.dot.ny.gov/kbridge.</p><p> www.dot.ny.gov/kbridge</p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us