Contractor Production Report

Contractor Production Report

<p> CONTRACTOR PRODUCTION REPORT DATE 03/03/2011 (ATTACH ADDITIONAL SHEETS IF NECESSARY) CONTRACT NO TITLE AND LOCATION N69450-08-D- REPORT NO PR 010 1781/0006 BRAC Construct East Gate Shaw AFB Sumter, SC CONTRACTOR SUPERINTENDENT Slone Associates, Inc Valdosta, GA Dennis J. Rossi AM WEATHER PM WEATHER MAX TEMP (F) MIN TEMP (F) Sunny Sunny 72 48 WORK PERFORMED TODAY Schedule WORK LOCATION AND DESCRIPTION EMPLOYER NUMBER TRADE HRS Activity No.</p><p>A1050 Clearing & Grubbing CNA 2 Site 20 A1060 Grading operations CNA 5 Site 50 Surveyor CNA 1 Survey 8</p><p>Site Superintendent/QCM Slone Assoc 1 Prime Contractor 10 Site Safety Officer Slone Assoc 1 Prime Contractor 10 TOTAL WORK HOURS ON JOB WAS A JOB SAFETY MEETING HELD THIS DATE? SITE, (If YES attach copy of the meeting minutes) YES NO 98 JOB THIS DATE, INCL CON'T SHEETS SAFETY WERE THERE ANY LOST TIME ACCIDENTS THIS DATE? CUMULATIVE TOTAL OF WORK (If YES attach copy of completed OSHA report) YES NO HOURS FROM PREVIOUS REPORT 584 WAS CRANE/MANLIFT/TRENCHING/SCAFFOLD/HV ELEC/HIGH WORK/ HAZMAT WORK DONE? YES NO (If YES attach statement or checklist showing inspection performed.) TOTAL WORK HOURS FROM WAS HAZARDOUS MATERIAL/WASTE RELEASED INTO THE ENVIRONMENT? START OF CONSTRUCTION 682 (If YES attach description of incident and proposed action.) YES NO Schedule LIST SAFETY ACTIONS TAKEN TODAY/SAFETY INSPECTIONS CONDUCTED SAFETY REQUIREMENTS HAVE BEEN MET. Activity No.</p><p>EQUIPMENT/MATERIAL RECEIVED TODAY TO BE INCORPORATED IN JOB (INDICATE SCHEDULE ACTIVITY NUMBER) Schedule Submittal # Description of Equipment/Material Received Activity No.</p><p>CONSTRUCTION AND PLANT EQUIPMENT ON JOB SITE TODAY. INDICATE HOURS USED AND SCHEDULE ACTIVITY NUMBER. Schedule Owner Description of Construction Equipment Used Today (incl Make and Model) Hours Used Activity No. A1060 CNA Rubber Tired Backhoe 0 A1050 CNA 544F John Deere Loader with root rake and forks 10 A1060 CNA Backhoe Hitachi 10 A1050 CNA Backhoe John Deere 10 A1060 CNA DynaPac Vibratory Roller 5 A1060 CNA Grader John Deere 770B 10 A1050 CNA Trencher Removed from site 0 A1050 CNA Tractor Trailer Dump Druck 10 Schedule REMARKS Activity No. Streets cut to guard shack Proof roll witnessed by Kenny Munoz, and Vince Pellitteri and CQCM. Passed with no Exceptions. Fill operations to start on Monday</p><p>Dennis J. Rossi 03-03-2011 CONTRACTOR/SUPERINTENDENT DATE</p><p>4296/1 (9/98) SHEET 1 OF 1</p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us