New Work Item Form No 8

New Work Item Form No 8

<p> ETSI New Work Item Form to be used when proposing new Work Items for adoption onto the ETSI Work Programme.</p><p>Work Item details: Which Technical Body is responsible? choose from this list: MTS Working Group: or from this list: (EPs in this list) Subgroup (if any): or from this list: (EPPs in this list) or from this list: (other TBs in this list) or enter name if not in either list: </p><p>WI reference number (if known): Will an STF be requested? TR 00081 part STF number (if known): (number will be allocated by Secretariat if not shown) EC mandate number (if relevant): BC- Working title: Scope of work to be undertaken: UMTS testing methodology Scope of this work is to produce an ETSI Technical Report including testing approach followed by suppliers in their industrialisation process and UMTS Network integration Testing methodology and TSS&TP to be used by operators; the aim is to reducing possibility of failures or incompatibilities in the acceptance test, having at one’s disposal a document that is a multi-experience collection. Rapporteur (named individual person): Supporting ETSI Member organisations: name: Giulio Maggiore (name at least four) organisation: Telecom Italia Mobile Nokia postal address: Via Vitorchiano, 4 Viag Interkom postcode 00189 city Roma Italtel country Italy Telecom Italia e-mail: [email protected] phone: +39 06 39009445 fax: +39 06 39009033</p><p>Deliverable document details: What type of document will be produced? Is it a new document or a revision of an existing one? New choose from list: TR or enter explicitly: If a revision, state the deliverable (e.g. ETS 300 987 ed 1) being revised: Proposed Harmonized Standard? edition / version Formal title of deliverable: UMTS Network Integration Testing; Testing Methodology, TSS&TP; ; Part : </p><p>Work schedule: Milestone Target date Date of creation of this Work Item 11/04/02 (file saved 11/04/2002 12:14:00 AM) Date Work Item adopted by Technical Body 11/04/02 already adopted? Start of work date: already started? Progress milestones up to WG approval (optional): title</p><p>Stable draft mar/02 </p><p>Target date for approval of deliverable by WG: Target date for approval of deliverable by TC or EP: oct/02 For EN deliverables only: Is draft EN to be approved by OAP or TAP? (Approval type)</p><p>Remarks: In 2002 voluntary efforts CJL 2000-02-03</p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us