Appendix 2: Ballast Water Log

Appendix 2: Ballast Water Log

<p> APPENDIX 2: BALLAST WATER LOG PLEASE PHOTOCOPY AS REQUIRED Ships completing this EPA BW log must also enter the EPA BALLAST WATER LOG ballast water information into the ship's deck and engineering logbooks. A ship's logbook must be made available for inspection at any Victorian port or any location within Victorian State Waters. Ship’s name: ______IMO/Lloyd’s no: ______Year built ______Master’s signature: ______Date: ______/______/______PAGE _____ of ______</p><p>Instructions for exchange & completion of this log: Exchange must be carried out to 95% volumetric exchange for empty/refill method and 300% for flow-through and dilution methods. Please fill in either the Empty/Refill column or the Flow-Through/Dilution column, depending on which(A) method you used for each tank (only one method per tank is acceptable). Estimated current pump capacity must(C) be listed for each pump used in exchange. (B) (D) Ballast water Exchange details Ballast water Intended Victorian discharge port tanks or Identify the pumps used and their estimated current pump capacity per hour. G = Gravity source for ballast water cargo holds Pump 1: 500m3 Pump 2: 300m3 Exchange location Empty/refill Flow-through/dilution ONLY (la ONLY tit ud List Exchange Volume e/l Pumps Used Full Volume of ballast on (pump Final BW tank Residual Tank Uptake water git number) & Volume volume discharge Discharge capacity BW uptake PORT volume Percentage 3 3 taken up ud Start (S) whether pumped (m ) port (m ) 3 (m ) gravity used when 3 exchanged e) End (E) 3 (m ) (G) empty (m ) Start (S) End (E) FPT 250 PORT BOTANY 15/1/06 245 S: 35°05’S 153°02’E S: 16/1/06 1045 Pumps1 & 2 10 NA NA 245 MELBOURNE 17/1/06 245 E: 36°10’S 152°10’E E: 16/1/06 1145 G</p><p>S: S:</p><p>E: E:</p><p>S: S:</p><p>E: E:</p><p>S: S:</p><p>E: E:</p><p>S: S:</p><p>E: E:</p><p>S: S:</p><p>E: E:</p><p>S: S:</p><p>E: E:</p><p>S: S:</p><p>E: E:</p><p>BALLAST WATER TANK CODES: Forepeak = FPT Aftpeak = APT Double bottom = DB Bottom tank = BT Bottom side tank = BST Deep tank = DT Wing tank = WT Top side tank = TST Cargo hold = CH Heeling tank = HT Water ballast tank = WBT Port = P Starboard = S Centre = C Bilge = BGT Other = O (specify) APPENDIX 2: BALLAST WATER LOG — PLEASE PHOTOCOPY AS REQUIRED Send this form to EPA as soon as possible before entering Victorian State waters. Fax: +613 9695 2520 or Email: [email protected] Comments:______NOTE: The information provided in this form must be true and correct. The discharge of high-risk domestic ballast water is prohibited in Victorian waters.</p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us