23Rd September 2019 (Monday) : Working Groups Presentations at Debate Hall, Hotel Vivanta by Taj

23Rd September 2019 (Monday) : Working Groups Presentations at Debate Hall, Hotel Vivanta by Taj

23rd September 2019 (Monday) : Working Groups Presentations at Debate Hall, Hotel Vivanta By Taj Advisory Committee Meeting 0900 - 1000 hrs. WG Title Convener Schedule Advisory Group AG A1.01: 1000 - 1020 Turbo Generators- Overview of WG progress hrs. A1.33 Guide for Cleanliness and Proper Storage Kevin Mayor 1020 -1040 hrs. of Generators and Components [email protected] A1.48 Guidance on the Requirements for High Ben Adams, 1040 - 1100 Speed Balancing / Over-speed Testing of [email protected] hrs. Turbine Generator Rotors Following om Maintenance or Repair. TEA BREAK: 1100 – 1120 Hrs. Advisory Group AG A1.02: 1120 - 1140 Hydro Generators - WG Progress Overview hrs. A1.55 Survey on Split Core Stators Sun Yutian, 1140 - 1200 [email protected] hrs. A1.56 Survey On Lap And Wave Windings And Richard Perers (SE) 1200-1220 hrs. Their Consequences On Maintenance And Performance A1.59 Survey On Industry Practices And Effects Charles Millet (CA) 1220 - 1240 Associated With The Cutting Out Of Stator hrs. Coils In Hydrogenerators A1.60 Guide On Economic Evaluation For Mark Bruintjies (ZA) 1240-1300 hrs. Refurbishment Or Replacement Decisions On Hydrogenerators A1.62 Thrust Bearing For Hydropower – A Survey Daniel Langmayr (AT) 1300-1320 hrs. Of Known Problems And Root Causes LUNCH BREAK: 1320 – 1400 Hrs. A1.67 State Of The Art Methods, Experience And Helio de Pavia 1400-1420 hrs. Limits In End Winding Testing For Hydro- Hamorin Jr (BR) Generators List Of Proposed New Subject And End Of Remi Tremblay (CA) 1420-1440 hrs. Meeting Advisory Group AG A1.05: New Technologies – WG Progress Overview A1/C4 Guide on the Assessment, Specification and D.K. Chaturvedi, 1440 - 1500 JWG-66 Design of Synchronous Condensers for [email protected] hrs. Power Systems with Predominance of Low m or Zero Inertia Generators Advisory Group AG A1.06: 1500 - 1520 Motors – WG Progress Overview hrs. A1.45 Guide for Determining the Health Index of Pinjia Zhang, 1520 - 1540 Large Electric Motors [email protected] hrs. nghua.edu.cn A1.53 Guide on Design Requirements of Motors AK Gupta, 1540 - 1600 for Variable Speed Drive Application [email protected] hrs. TEA BREAK: 1600 – 1620 Hrs. A1.54 Impact of Flexible Operation on Large John Doyle, 1620 - 1640 Motors [email protected] hrs. A1.58 Selection Of Copper Versus Aluminium Fredemar Runco (BR) 1640-1700 hrs Rotors For Induction Motors [email protected] A1.61 Survey of Partial Discharge Monitoring in André Tomaz de 1700 - 1720 hrs Large Motors Carvalho, [email protected] A1.64 Guide for Evaluating the Erli Ferreira 1720 - 1740 Repair/Replacement of Operable Standard Figueiredo, hrs. Efficiency Motors [email protected] A1.68 Evaluating Quality Performance of Electric Kondra Nagesh 1740 - 1800 hrs Motor Manufacturing and Repair Facilities [email protected] Proposals For New Topics Of Study Erli F. Figueiredo 1800-1815 hrs (BR) .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us