ATTACHMENT 1 RESPONSE TO NRC REQUEST FOR ADDITIONAL INFORMATION (RAI) RELATED TO THE MRP-227-A APPLICANT/LICENSEE ACTION ITEM #7 ANALYSIS SUPPORTING THE REACTOR VESSEL INTERNALS INSPECTION PLAN AMENDMENT REQUEST FOR OCONEE NUCLEAR STATION (ONS), UNITS 1, 2, AND 3 [NON-PROPRIETARY VERSION] A AREVA Response to NRC Request for Additional ANP-3267QINP Revision 0 Information (RAI) Related to the MRP-227-A Applicant/Licensee Action Item #7 Analysis Supporting the Reactor Vessel Internals Inspection Plan Amendment Request for Oconee Nuclear Station (ONS), Units 1, 2, and 3 March 2014 AREVA Inc. (c) 2014 AREVA Inc. Copyright © 2014 AREVA Inc. All Rights Reserved AREVA Inc. ANP-3267Q1 NP Revision 0 Response to NRC Request for Additional Information Related to the MRP-227-A Applicant/Licensee Action Item #7 Analysis Supporting the Reactor Vessel Internals Inspection Plan Amendment Request for n'%J K UIO IJOPI Iz.Ji nKSl HI i+ 4 3 C A.I J D.O Ci Nature of Changes Section(s) Item or Page(s) Description and Justification Rev. 0 All Original Issue + AREVA Inc. ANP-3267Q1 NP Revision 0 Response to NRC Request for Additional Information Related to the MRP-227-A Applicant/Licensee Action Item #7 Analysis Supporting the Reactor Vessel Internals Inspection Plan Amendment Request for Oconee Nuclear Station (ONS) Unit 1. 2, and 3 Page ii Contents PaI.e LIST OF TABLES............................................................................... IV LIST O F FIG URES .................................................................................................. V NOM ENCLATURE ..................................................................................................... VI ABSTRACT ................................................................................................................... VII 1.0 INTRO DUCTION AND SUM MARY ................................................................... 1-1 2.0 REQUESTS FOR ADDITIONAL INFORMATION (RAIS) AND RESPO NSES .................................................................................................... 2-1 2 .1 R A I-1 ....................................................................................................... 2 -1 2.1.1 Statem ent of RA-1 ....................................................................... 2-1 2.1.2 Response to RAI-1 ....................................................................... 2-1 2.1.2.1 Response to Part 1: ....................................................... 2-1 2.1.2.2 Response to Part 2: ....................................................... 2-2 2.1.2.3 Response to Part 3 ........................................................ 2-2 2 .2 R A I-2 ....................................................................................................... 2 -3 2.2.1 Statem ent of RAI-2 ....................................................................... 2-3 2.2.2 Response to RAI-2 ....................................................................... 2-4 2.2.2.1 Response to Part 1: ....................................................... 2-4 2.2.2.2 Response to Part 2: ....................................................... 2-4 2.2.2.3 Response to Part 3: ....................................................... 2-5 2.2.2.4 Response to Part 4: ....................................................... 2-6 2 .3 R A I-3 ..................................................................................................... 2 -1 0 AREVA Inc. ANP-3267Q1 NP Revision 0 Response to NRC Request for Additional Information Related to the MRP-227-A Applicant/Licensee Action Item #7 Analysis Supporting the Reactor Vessel Internals Inspection Plan Amendment Request for Oconee Nuclear Station (ONS) Unit 1, 2, and 3 Page iii 2.3.1 Statement of RAI-3 ..................................................................... 2-10 2.3.2 Response to RAI-3 ..................................................................... 2-10 2.3.2.1 Response to Part 1: ..................................................... 2-10 2.3.2.2 Response to Part 2: ..................................................... 2-11 2 .4 R A I-4 ..................................................................................................... 2 -1 2 2.4.1 Statement of RAI-4 ..................................................................... 2-12 2.4.2 Response to RAI-4 ..................................................................... 2-12 2 .5 R A I-5 ..................................................................................................... 2 -1 5 2.5.1 Statement of RAI-5 ..................................................................... 2-15 2.5.2 Response to RAI-5 ..................................................................... 2-15 2.5.2.1 Response to Part 1: ..................................................... 2-15 2.5.2.2 Response to Part 2: ..................................................... 2-16 2.5.2.3 Response to Part 3: ..................................................... 2-16 2 .6 R A I-6 ..................................................................................................... 2 -1 7 2.6.1 Statement of RAI-6 ..................................................................... 2-17 2.6.2 Response to RAI-6 ..................................................................... 2-17 2 .7 R A I-7 ..................................................................................................... 2 -1 8 2.7.1 Statement of RAI-7 ..................................................................... 2-18 2.7.2 Response to RAI-7 ..................................................................... 2-18 2 .8 R A I-8 ..................................................................................................... 2 -1 9 2.8.1 Statement of RAI-8 ..................................................................... 2-19 2.8.2 Response to RAI-8 ..................................................................... 2-19 3.0 OVERALL REPORT REFERENCES ................................................................. 3-1 AREVA Inc. ANP-3267Q1NPRevision 0 Response to NRC Request for Additional Information Related to the MRP-227-A Applicant/Licensee Action Item #7 Analysis Supporting the Reactor Vessel Internals Inspection Plan Amendment Request for Oconee Nuclear Station (ONS) Unit 1, 2, and 3 Page iv List of Tables Table 2-1. Stress Distribution Around Castings ........................................................... 2-9 AREVA Inc. ANP-3267Q1 NP Revision 0 Response to NRC Request for Additional Information Related to the MRP-227-A Applicant/Licensee Action Item #7 Analysis Supporting the Reactor Vessel Internals Inspection Plan Amendment Request for Oconee Nuclear Station (ONS) Unit 1, 2, and 3 Paqe v List of Figures Figure 2-1, Displacement Intact Spacer Casting ........................................................ 2-7 Figure 2-2. Displacement Casting With One Failed Ligament .................................... 2-7 Figure 2-3. Brazement Subassem bly Sketch .............................................................. 2-8 Figure 2-4, Spacer Casting Configuration with Stress Path Lines [ ............................................ 2 -8 AREVA Inc. ANP-3267Q1NP Revision 0 Response to NRC Request for Additional Information Related to the MRP-227-A Applicant/Licensee Action Item #7 Analysis Supporting the Reactor Vessel Internals Inspection Plan Amendment Request for Oconee Nuclear Station (ONS) Unit 1, 2, and 3 Page vi Nomenclature Acronym Definition CASS Cast Austenitic Stainless Steel DPA Displacement Per Atom EFPY Effective Full Power Year FIV Flow-Induced Vibration CRGT Control Rod Guide Tube IE Irradiation Embrittlement IMI Incore Monitoring Instrumentation LOCA Loss of Coolant Accident MRP Materials Reliability Program NRC Nuclear Regulatory Commission ONS Oconee Nuclear Station OD Outer Diameter PH Precipitation-Hardened PWR Pressurized Water Reactor RAI Request for Additional Information RCS Reactor Coolant System RV Reactor Vessel SSE Safe Shutdown Earthquake TE Thermal Aging Embrittlement AREVA Inc. ANP-3267Q1NP Revision 0 Response to NRC Request for Additional Information Related to the MRP-227-A Applicant/Licensee Action Item #7 Analysis Supporting the Reactor Vessel Internals Inspection Plan Amendment Request for Oconee Nuclear Station (ONS) Unit 1, 2, and 3 Page vii ABSTRACT AREVA document ANP-3267, Revision 1, "MRP-227-A Applicant/Licensee Action Item #7 Analysis for the Oconee Nuclear Station Units," was prepared by AREVA for Duke Energy and subsequently submitted to the Nuclear Regulatory Commission (NRC) by Duke Energy. The NRC has issued Requests for Additional Information (RAIs) on this submittal, and this report provides the responses for RAIs 1 (all parts), 2 (all parts), 3 (all parts), 4, 5 (all parts), 6, 7, and 8. AREVA Inc. ANP-3267Q1NP Revision 0 Response to NRC Request for Additional Information Related to the MRP-227-A Applicant/Licensee Action Item #7 Analysis Supporting the Reactor Vessel Internals Inspection Plan Amendment Request for Oconee Nuclear Station (ONS) Unit 1, 2, and 3 Page 1-1 1.0 INTRODUCTION AND SUMMARY AREVA document ANP-3267, Revision 0, "MRP-227-A Applicant/Licensee Action Item #7 Analysis for the Oconee Nuclear Station Units," was prepared by AREVA for Duke Energy and subsequently submitted to the Nuclear Regulatory Commission (NRC) by Duke Energy (1). The NRC has issued Requests for Additional Information (RAIs) (2) on this submittal and this report provides the answers to those RAIs assigned to AREVA.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages37 Page
-
File Size-