East Bay Municipal Utility District

East Bay Municipal Utility District

EAST BAY MUNICIPAL UTILITY DISTRICT DATE: October 23, 2007 MEMO TO: Board of Directors THROUGH: Dennis M. Diemer, General Manager Signed. FROM: Xavier J. Irias, Director of Engineering and Construction SUBJECT: Strategy for Protecting the Mokelumne Aqueducts in the Delta RECOMMENDED ACTION 1. Accept the attached staff report, “Strategy for Protecting the Mokelumne Aqueducts in the Delta,” which discusses the hazards and risks to the aqueducts and evaluates alternative options to mitigate those hazards and risks. 2. Direct staff to use its findings and recommendations in planning future water conveyance capital improvement programs and technical studies, and participating in statewide Delta initiatives. SUMMARY The Mokelumne Aqueducts in the Delta area are a critical component of EBMUD’s water system and the State of California’s (State) overall water infrastructure. EBMUD has interconnections with the San Francisco Public Utilities Commission and the Contra Costa Water District, making the aqueducts a linchpin in an increasingly integrated regional water system. Consistent with this importance as a vital water supply element, over the years EBMUD has invested heavily in improving aqueduct security and making levee improvements to protect this facility. The efficacy of these measures depends upon the State continuing to maintain and repair the Delta levee system. With the advent of the Delta Vision process, the Department of Water Resources (DWR) and the State have clearly signaled that their future maintenance of the levees is not assured. EBMUD has carefully evaluated the hazards and risks of aqueduct failure in the Delta, prompted in part by the limited prospects for a continuing DWR role in protecting the levee system. The findings of the evaluation identify the best long-term option as a tunnel below the Delta to enclose dual pipelines. This option would provide a high degree of protection against both flooding and seismic events, with a preliminary cost of approximately $650 million. The tunnel would take several years to plan, design and construct. Accordingly, interim measures are also recommended to maintain the levees and provide greater operational flexibility. The attached Summary Report on this evaluation discusses the hazards and risks to the aqueducts in the Delta, the array of alternative options and the evaluation of each alternative. Strategy for Protecting the Aqueducts in the Delta Summary Report Preliminary results of this evaluation were discussed at the Finance/Administration Committee on August 14, 2007. DMD:XJI:AST I:\sec\10-23-07 Board Agenda Items\E&C Strategy for Protecting the Aqueducts in the Delta.doc Attachment 2 ________________________________________________________________________ Strategy for Protecting the Mokelumne Aqueducts in the Delta Summary Report Prepared By East Bay Municipal Utility District October 2007 Strategy for Protecting the Aqueducts in the Delta October 18, 2007 Summary Report 1. INTRODUCTION.................................................................................................... 1 1.1 Background ..................................................................................................... 1 1.2 Study Objective ............................................................................................... 2 1.3 Study Approach .............................................................................................. 2 2. SUMMARY .............................................................................................................. 4 3. TECHNICAL ANALYSIS ...................................................................................... 6 3.1 Development of Alternatives.......................................................................... 6 3.2 Cost of Each Alternative ................................................................................ 8 3.3 Risk Analysis ................................................................................................. 11 3.4 Evaluation of Alternatives............................................................................ 15 i Strategy for Protecting the Aqueducts in the Delta October 18, 2007 Summary Report List of Tables Table 1: List of Alternatives .............................................................................................. 6 Table 2: Capital Costs of Alternatives............................................................................... 8 Table 3: Summary of Risk Mitigation for Each Alternative ........................................... 13 Table 4: Summary of Risk Analysis ................................................................................ 15 Table 5: Recommended Short-term Alternatives ............................................................ 16 List of Figures Figure 1: Existing Aqueduct System ................................................................................. 1 Figure 2: Recommended Alternative - Tunnel Below Delta ............................................. 4 Figure 3: Life-cycle Costs – Short-Term Alternatives .................................................... 10 Figure 4: Life-cycle Costs – Long-Term Alternatives..................................................... 10 ii Strategy for Protecting the Aqueducts in the Delta October 18, 2007 Summary Report 1. INTRODUCTION 1.1 Background The East Bay Municipal Utility District’s (EBMUD) Mokelumne Aqueducts traverse approximately 15 miles of the Sacramento-San Joaquin Delta area. See Figure 1 below. Figure 1: Existing Aqueduct System The three aqueducts are a vital lifeline for EBMUD’s 1,300,000 customers, carrying approximately 95 percent of their water supply. Accordingly, EBMUD has, over the years, taken a variety of measures to ensure the reliability of the aqueduct pipelines. Most recently, in 2004, EBMUD completed a $40 million seismic upgrade to the largest of the three aqueducts. Even with those improvements, the continued reliability of the aqueducts depends upon the Delta levee system. In recent years, the future of that levee system has become doubtful, based on scientific assessments of the levees’ fragility and of long-term threats to levee stability such as ground subsidence and global climate change. Compounding these structural issues are environmental concerns about the impact of water diversions on fisheries and other resources. In recognition of the need to proactively address the Delta’s future, the State of California (State) is currently conducting studies on the Delta region as part of their Delta Vision, Delta Risk Management Strategy (DRMS) and Bay Delta Conservation Plan projects. The State’s Delta Vision process will result in recommendations for sustainable management of the Delta region. In the meantime, in light of the staggering cost of levee repair for the 2004 Jones Tract levee failure, the State is examining whether or not it will commit to repairing future levee failures. This 1 Strategy for Protecting the Aqueducts in the Delta October 18, 2007 Summary Report potential change in policy makes EBMUD’s aqueducts in the Delta unsustainable in their current configuration. This report recommends a strategy to secure EBMUD’s water supply through the Delta region in light of the emerging State strategy for managing the Delta. It identifies a range of possible short-term and long-term alternatives and then evaluates each alternative for its cost as well as its risk reduction benefits. 1.2 Study Objective The study objective is to recommend strategies, both short and long term, for protecting the aqueducts in the Delta region against a variety of hazards. The hazards include earthquakes, storm flooding, Delta island subsidence, and climatic changes driving sea level rise. The study considers the need to protect the aqueducts not only from direct impacts of each hazard, but indirect impacts caused by levee failure. The project limits of this study consist of approximately 15 miles of aqueduct alignment across the Sacramento-San Joaquin Delta area. See Figure 1 for the map of the aqueducts in the Delta region and the project limits. This reach of the aqueducts consists of approximately 4.5 miles of buried pipeline, 10 miles of elevated pipeline, and 3 major river crossings with about 0.5 miles of submerged pipeline. In seeking to protect EBMUD’s water lifeline through the Delta, this study considers not only the probability of damage to the aqueducts in the Delta, but also the degree of damage. Specifically, the available aqueduct flow in a damaged state is considered, as well as the likely duration of repairs. One key criterion to evaluate alternatives is whether at least 177 million gallons per day (MGD) is available soon after a hazard event such as a flood or earthquake. This is the estimated flow available when Aqueduct No. 3 is the sole functioning aqueduct in the vulnerable Delta region; it also roughly matches winter-time average demands. The strategies developed in this report will be used in EBMUD’s decision-making as well as guiding its participation in regional Delta strategies advanced by the State or others. 1.3 Study Approach A series of Technical Memoranda (TM) were prepared to study the following topics: • Development of Alternatives (TM No. 1). • Cost of Each Alternative (TM No. 2). • Risk Evaluation of Alternatives (TM No. 3). • Risk versus Benefit for Each Alternative (TM No. 4). 2 Strategy for Protecting the Aqueducts in the Delta October 18, 2007 Summary Report The next section of this report summarizes findings. The third

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    23 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us