HUSKY OIL LIMITED Lloydminster Border Pipeline Expansion Construction Schedule Update

HUSKY OIL LIMITED Lloydminster Border Pipeline Expansion Construction Schedule Update

HUSKY OIL LIMITED Lloydminster Border Pipeline Expansion Construction Schedule Update DISTRIBUTION LIST AND FOLLOWUP FEBRUARY & MARCH 2005 The distribution list has been modified from the Consultation Program Notification (CPN) List to include recommendations and changes from update and follow up calls conducted for the construction schedule update. Follow-up e-mail and telephone calls completed March 8 – 15, 2005. Any follow up actions that were required are summarised as per the individuals listed herein. There are no outstanding concerns. LANDOWNERS AND TENANTS Landowners were notified by direct contact with Husky as well as mail out of the construction schedule update. Mr. Doug Hastings, 4429 44th Street, Lloydminster, Saskatchewan, S9V 0Z8 For reference only Mr Garnet Kuehn, Husky Oil Operations Ltd., 38th flr #707-8th Avenue S.W., Calgary, Alberta, T2P 1H5 Ph: (403) 298-6231 Mr. Jack Hill, Box 328, Lloydminster, Saskatchewan, S9V 0Y9 Ph: (780) 875-7115 Mr. William Keichinger, General Delivery, Streamstown, Alberta, T0B 5G0 Ph: (780) 847-2587 Mr. Larry Leach, Box 995, Lloydminster, Saskatchewan, S9V 0Y9 Ph: (306) 825-9610 March 9/10: Mr. Leach called EES to enquire if the pipeline would require more land. EES asked Doug Hastings, from Husky, to call Mr. Leach to discuss the project on his land in detail. EES called the landowner back and it was confirmed that Husky had called and provided adequate information. HUSKY OIL LIMITED. SCHEDULE UPDATE DISTRIBUTION LIST Lloydminster Border Pipeline Expansion - 1 - Ms. Pat Larsen, 951 110A Street, Edmonton, Alberta, Ph: (780) 433-8283 Mr. Clancy Hodgeson, 5901 44th Street, Lloydminster, Alberta, T9V 1V6 Ph: (306) 825-3268 Mr. Bruce Sutherland, Box 355, Lloydminster Saskatchewan, S9V 0Y9 Ph: (306) 825-3185 Mr. Glenn Forty, Box 1345, Lloydminster, Alberta, S9V 1K4 Ph: (306) 825-0105 Mr. Ron Rackham, Box 371, Lloydminster, Saskatchewan, S9V 0Y4 Ph: (306) 825-3609 Mr. Garnet Weaver, Box 740, Lloydminster, Alberta, S9V 1C1 Ph: (780) 875-7702 Ms Lavina Perry, Box 310, Punnichy, Saskatchewan, S0A 3C0 Ph: (306) 835-2682 Mr. David Greenway, R.R. #2, Lloydminster, Saskatchewan, S9V OX7 Ph: (306) 825-3610 Neighbouring Acreage Owners, not directly affected by the Border Expansion Mr. Gary McChesney Box 1177 Lloydminster, Saskatchewan, S9V 1G1 Ph: (306) 825-3508 Mr. Peter Wieler Box 1595 Lloydminster, Saskatchewan, S9V 1K5 Ph: (780) 875-8588 NATIONAL ENERGY BOARD HUSKY OIL LIMITED. SCHEDULE UPDATE DISTRIBUTION LIST Lloydminster Border Pipeline Expansion - 2 - Mr. Michel Mantha, National Energy Board, 444 7th Ave. SW, Calgary, Alberta, T2P 0X8 Ph: 1-800-899-1265 www.neb-one.gc.ca TRANSPORT CANADA Navigable Waters Protection Division Suite 200, 401 Burrard St, Vancouver, British Columbia, V6C 3S4 Attn: Mr. Bob Gowe, Superintendent Ph: (604) 775-8867 Fax: (604) 775-8828 E-mail: [email protected] Transport Safety Board of Canada, 4th floor Place du Center, 200 Promenade du Portage, Gatineau, Quebec, K1A 1K8 Attn: Mr. Terry Burtch Ph: (819) 994-8079 Fax: (819) 953-2160 E-mail: [email protected] FISHERIES AND OCEANS CANADA – is now all under Transport Canada Habitat Services, 7646 8th Street N.E., Calgary, Alberta, T2E 8X4 Attn: Mr. Kurt McCallister Ph: (403) 292-6593 Fax: (403) 292-5173 E-mail: [email protected] 4253 97th Street, Edmonton, Alberta, T6E 5Y7 Attn: Mr. Brian Makowecki, Impact Assessment Biologist, Ph: (780) 495-3889 Fax: (780) 495-8606 E-mail: [email protected] 4253 97 St, Edmonton, Alberta, T6E 5Y7 Attn: Mr. Steve Drummond, Navigable Waters Protection Officer Ph: (780) 495-3701 Fax: (780) 495-8607 CANADIAN ENVIRONMENTAL ASSESSMENT AGENCY HUSKY OIL LIMITED. SCHEDULE UPDATE DISTRIBUTION LIST Lloydminster Border Pipeline Expansion - 3 - 100 Revillon Bldg, 10237 - 104 Street N.W., Edmonton, Alberta, T5J 1B1 Attn: Mr. Lanny Coulson, Director Alberta Region Ph: (780) 422-7704 Fax: (780) 422-6202 #445, 123 Main Street, Winnipeg, Manitoba, R3C 4W2 Attn: Mr. Dan McNaughton, Regional Director Ph: (204) 984-2457 Fax: (204) 983-7174 E-mail: [email protected] Rm 220, 3211 Albert St, Regina, Saskatchewan, S4S 5W6 Attn: Mr. Larry Lechner, Director, Environmental Assessment Branch Ph: (306) 787-5786 Fax: (306) 787-0930 March 11: Mr. Lechner called EES to ensure that notice had been sent to Mr Graham Mutch. It had been. ENVIRONMENT CANADA Environmental Protection Branch, Alberta Division Rm. 200, 4999 98 Avenue, Edmonton, Alberta, T6B 2X3 Attn: Ms. Margaret Fairbairn, Manager Ph: (780) 951-8860 Fax: (780) 495-4099 E-mail: [email protected] Environmental Protection Branch, Alberta Division Rm. 200, 4999 98 Avenue, Edmonton, Alberta, T6B 2X3 Attn: Mr. Fred Zahl, Environmental Assessment Co-ordinator Ph: (780) 951-8758 Fax: (780) 495-4099 Construction Schedule Update sent by TERA. Environmental Protection Branch, Alberta Division Rm. 200, 4999 98 Avenue, Edmonton, Alberta, T6B 2X3 Attn: Mr Paul Gregoire, Wildlife Biologist Ph: (780) 951-8695 Fax: (780) 495-2615 E-mail: Paul Gregoire@ ec.gc.ca Construction Schedule Update sent by TERA. Environmental Protection Branch, Alberta Division Rm. 200, 4999 98 Avenue, HUSKY OIL LIMITED. SCHEDULE UPDATE DISTRIBUTION LIST Lloydminster Border Pipeline Expansion - 4 - Edmonton, Alberta, T6B 2X3 Attn: Mr. Dale Kirkland Ph: (780) 951-8729 Fax: (780) 495-4099 Email: [email protected] Environment Canada, Rm. 300, 2365 Albert Street, Park Plaza, Regina, Saskatchewan, S4P 4K1 Attn: Mr. Dave Munro, Manager, Saskatchewan Division. Ph: (306) 780-6390 Fax: (306) 780-6466 March 10: Mr. Munro advised that Mr. Andy Smart was to be consulted with. See below. Environment Canada, Rm. 300, 2365 Albert Street, Regina, Saskatchewan, S4P 4K1 Attn: Mr. Andy Smart, Environmental Assessment Co-0rdinator Ph: (306) 780-6544 Fax: (306) 780-6466 Construction Schedule Update sent by TERA. Mr. Smart called EES to report that he did not receive the environmental assessment from the NEB or the Approval Order. EES provided Mr. Smart contact information for the project’s team lead at the NEB; advised him that TERA would be contacting him shortly with more information and e-mailed him a copy of the NEB Approval Order. Environment Canada, Transboundary Waters Unit, Rm. 300, 2365 Albert Street, Regina, Saskatchewan, S4P 4K1 Attn: Mr. Girma Sahlu, Environmental Systems Engineer, Ph: (306) 780-6425 Fax: (306) 780- 7614 Construction Schedule Update sent by TERA. INDIAN AFFAIRS & NORTHERN AFFAIRS Land and Trust Services Suite 630, Canada Place, 9700 Jasper Avenue, Edmonton, Alberta, T5J 4G2 Attn: Ms. Keri-Ann Haggerty Ph: (780) 495-2773 Fax: (780) 495-2201 E-mail: [email protected] HUSKY OIL LIMITED. SCHEDULE UPDATE DISTRIBUTION LIST Lloydminster Border Pipeline Expansion - 5 - Land and Trust Services Rm. 200, 1 First Nations Way, Regina, Saskatchewan, S4S 7K5 Attn: Ms. Jackie Conrod Ph: (306) 780-8457 Fax: (306) 780-6128 E-mail: [email protected] NATURAL RESOURCES CANADA Office of Environmental Affairs Natural Resources Canada, 3rd Floor, 580 Booth Street, Ottawa, Ontario, K1A 0E4 Attn: Ms. Michelin Turpin, Environmental Assessment Officer Ph: (613) 996-0055 Fax: (613) 995-5719 E-mail: oea-ea/[email protected] Socio-Economics, Policy and Liaison, 5320-122 Street, Edmonton, Alberta, T6H 3S5 Attn: Mr. Derek Johnson Ph: (780) 435-7306 Fax: (780) 435-7359 E-mail: [email protected] HEALTH CANADA Healthy Environment & Consumer Safety Branch, Alberta Region, 14th flr, Sunlife Bldg., #1440, 10123 99th Street, Edmonton, Alberta, T5J 3H1 Attn: Mr Tak Nakamura, Environmental Assessment Co-ordinator, Ph: (780) 495-2342 Fax: (780) 495-2642 E-mail : [email protected] March 3: Mr. Nakamura called EES to report that he had not received a Federal Co-ordination Referral for the project. Advised him to directly contact the NEB on this matter. Healthy Environment & Consumer Safety Branch, Saskatchewan Region, 510 Lagimodiere Blvd., Winnipeg, Manitoba, R2J 3Y1 Attn: Mr.Rick Grabowecky, Environmental Assessment Co-ordinator Ph: (204) 984-8318 Fax: (204) 984-0461 E-mail: [email protected] HUSKY OIL LIMITED. SCHEDULE UPDATE DISTRIBUTION LIST Lloydminster Border Pipeline Expansion - 6 - ALBERTA COMMUNITY DEVELOPMENT Historical Sites and Services 8820 - 112 Street, Edmonton, Alberta, T6G 2P8 Attn: Mr. George Chalut, Resource Management Planner Ph: (780) 431-2329 Fax: (780) 427-3956 Contact Shamim 780 431 2328 E-mail: shamim.shivji @gov.ab.ca Alberta Natural Heritage Information Centre, 2nd Flr Oxbridge Place, 9820 106 Street, Edmonton, Alberta, T5K 2J6 Attn: Mr. John Rintoul, Data Co-ordinator Ph: (780) 427-6639 Fax: (780) 427-5980 E-mail: [email protected] Construction Schedule Update sent by TERA. MINISTRY OF SUSTAINABLE RESOURCE DEVELOPMENT Fish and Wildlife Division 2nd flr, Great West Life Bldg, 9920 108 St, Edmonton, Alberta, T5K 2M4 Attn: Mr. Dave Borutski, Resource Integration and Planning Ph: (780) 427-7793 Fax: (780) 422-9559 E-mail: [email protected] Fish &Wildlife, 2nd flr, Provincial Bldg., 5124 50 Street, Lloydminster, Alberta, T9V 0M8 Attn: Ms. Susan Goodhope Ph: (780) 871-6495 Fax: (780) 871-6486 E-mail: [email protected] Alberta Sustainable Resource Development, 2nd flr, Provincial Bldg, 4701 52nd Street, Vermilion, Alberta, T9X 1J9 Attn: Mr David Moore, Senior Wildlife Technician, Ph: (780) 853-8137 Fax: (780) 853- 8264 Construction Schedule Update sent by TERA. HUSKY OIL LIMITED. SCHEDULE UPDATE DISTRIBUTION LIST Lloydminster Border Pipeline Expansion - 7 - ALBERTA ENVIRONMENT Regional Services, Southern Region, Approvals, 203, 2938 - 11 Street N.E., Calgary, Alberta, T2E 7L7 Attn: Mr. Don McCabe, Pipeline Approvals Co-ordinator Ph: (403) 297-5671 Fax: (403) 297-5944 E-mail: [email protected] Regional Compliance Inspector, 2nd flr, Provincial Bldg, #28, 810 14th Ave, Wainwright, Alberta, T9W 1R2 Attn: Mr. Mike Smith, Regional Compliance Inspector Ph: (780) 842-7535 Cell: (780) 842-7946 Fax: (780) 842-7530 Construction Schedule Update sent by TERA. ALBERTA TRANSPORTATION Alberta Infrastructure, Surface Engineering and Aggregates, 2nd flr, Twin Atria Bldg, 4999 98th Ave, Edmonton, Alberta, T6B 2X3 Attn: Mr.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    21 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us