Volume - I Main Report

Volume - I Main Report

NATIONAL HIGHWAYS AUTHORITY OF INDIA (Ministry of Road Transport and Highways) Four laning of Dangiawas (km 96.595 of NH-112) to Jajiwal (km 283.500 of NH 65 Nagaur road) section- Package-I (Design length 74.619 km) of Jodhpur Ring Road (In Principally declared NH) in the State of Rajasthan on Hybrid Annuity Mode under NHDP phase VII VOLUME - I MAIN REPORT SECTION I : DANGIYAWAS TO NAGAUR ROAD FINAL PROJECT REPORT OCTOBER - 2017 (R0) Four laning of Dangiawas (km 96.595 of NH-112) to Jajiwal (km 283.500 of NH 65 Nagaur road) Final Project Report section- Package-I (Design length 74.619 km) of Jodhpur Ring Road in the State of Rajasthan Table of Contents TABLE OF CONTENTS ES. EXECUTIVE SUMMARY ............................................................................................................. 1 ES.1 PROJECT BACKGROUND .................................................................................................................... 1 ES.2 EXISTING PROJECT FEATURES ........................................................................................................... 1 ES.3 PAVEMENT CONDITION .................................................................................................................... 2 ES.4 STRUCTURAL STRENGTH OF PAVEMENT .......................................................................................... 3 ES.5 SUB GRADE INVESTIGATIONS ........................................................................................................... 3 ES.6 TOPOGRAPHIC SURVEYS ................................................................................................................... 5 ES.7 TRAFFIC SURVEYS AND ANALYSIS ..................................................................................................... 5 ES.8 DESIGN STANDARDS ....................................................................................................................... 11 ES.9 IMPROVEMENT PROPOSALS ........................................................................................................... 11 ES.10 PAVEMENT DESIGN ....................................................................................................................... 23 ES.11 IMPROVEMENT PROPOSAL FOR STRUCTURES ............................................................................. 24 ES.12 COST ESTIMATE ............................................................................................................................. 25 CHAPTER – 1: OVERVIEW OF NHAI ORGANISATION ............................................................................ 1 1.1 INTRODUCTION ............................................................................................................................ 1 1.1.1 History of NHAI Organization .................................................................................................... 1 1.2 NATIONAL HIGHWAY DEVELOPMENT PROJECT (NHDP) .............................................................. 3 1.2.1 Golden Quadrilateral (GQ) or Phase-I of NHDP ........................................................................ 4 1.2.2 North-South and East-West Corridors or Phase-II of NHDP ..................................................... 5 1.2.3 NHDP Phase-III .......................................................................................................................... 5 1.2.4 NHDP Phase IV .......................................................................................................................... 5 1.2.5 NHDP Phase V ........................................................................................................................... 5 1.2.6 NHDP Phase VI .......................................................................................................................... 6 1.2.7 NHDP Phase VII ......................................................................................................................... 6 1.3 PROJECT FINANCING..................................................................................................................... 6 1.3.1 Through Budgetary allocations from Government of India (CESS) ........................................... 6 1.3.2 Loan assistance from international funding agencies .............................................................. 6 1.3.3 Market borrowing ..................................................................................................................... 6 1.3.4 Private sector participation....................................................................................................... 7 1.3.5 Special Purpose Vehicles (SPVs) ................................................................................................ 7 1.3.6 Cost Recovery Mechanism ........................................................................................................ 7 CHAPTER – 2: PROJECT DESCRIPTION ................................................................................................. 1 2.1 INTRODUCTION ............................................................................................................................ 1 2.2 OBJECTIVES ................................................................................................................................... 1 2.3 SCOPE OF SERVICES ...................................................................................................................... 2 2.4 STAGES OF SUBMISSION ............................................................................................................... 3 2.5 STRUCTURE OF REPORT ................................................................................................................ 4 2.6 PROJECT AREA .............................................................................................................................. 5 2.6.1 Location ..................................................................................................................................... 5 2.6.2 Terrain ....................................................................................................................................... 6 2.6.3 Land Use .................................................................................................................................... 6 2.6.4 Alignment .................................................................................................................................. 7 2.6.5 Existing Road Width .................................................................................................................. 7 2.6.6 Pavement Condition ................................................................................................................. 7 Feedback Infra Pvt. Ltd. i National Highways Authority of India Four laning of Dangiawas (km 96.595 of NH-112) to Jajiwal (km 283.500 of NH 65 Nagaur road) Final Project Report section- Package-I (Design length 74.619 km) of Jodhpur Ring Road in the State of Rajasthan Table of Contents 2.6.7 Embankment Height ................................................................................................................. 7 2.6.8 Right of Way .............................................................................................................................. 7 2.6.9 Junctions ................................................................................................................................... 8 2.6.10 Utilities ...................................................................................................................................... 8 2.6.11 Rail Over Bridges (ROBs) ........................................................................................................... 9 2.6.12 Bridges and Cross Drainage Structures ..................................................................................... 9 2.6.13 Religious Place........................................................................................................................... 9 2.6.14 Drainage Pattern ....................................................................................................................... 9 2.6.15 Truck lay-Bye ............................................................................................................................. 9 2.6.16 Existing Toll Plaza ...................................................................................................................... 9 CHAPTER 3.0: ADOPTED METHODOLOGY ........................................................................................... 1 3.1 GENERAL ....................................................................................................................................... 1 3.2 BASIS ............................................................................................................................................. 1 3.3 COLLECTION OF AVAILABLE DATA ................................................................................................ 1 3.4 SOCIO-ECONOMIC PROFILE .......................................................................................................... 1 3.5 TRAFFIC SURVEY, ANALYSIS AND PROJECTION ............................................................................ 1 3.6 ENGINEERING SURVEYS AND INVESTIGATIONS ........................................................................... 2 3.6.1 Reconnaissance and Alignment ...............................................................................................

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    280 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us