
the city of Zhovti Vody, Dnipropetrovsk region, Ukraine Р 74 river port –112 km «Zhovti Vody II» Map symbols railway station – 3 km boundaries of the land plot railway lines regional highway Р74 approach automotive road 160 га power transmission line 35kV railway station 150 ha International airport – 55,4 km Р 74 Commercial seaport – 242 km Р 74 Technical specifications of the land plot in the city of Zhovti Vody distance from the land plot to operating water pipe Transport infrastructure: draw off point: min – 0,2 km и max – 1 km; operating water pipe diameter – 400 mm. • approach automotive road (asphalt Water disposal surface) for trucks is located along the In order to provide water disposal, it is necessary to lay an land plot; outdoor sewerage to the «Yuzhnaya» sewerage pumping • European highway: Е50 (М-04) – 18 km; station: • regional highway (Р 74 Piatykhatky – power reserve of operating sewage treatment Kryvyi Rih - Shyroke) – 200 m; facilities –12 000 m³/day; • freight railway station: «Zhovti Vody II» distance from the land plot to operating water (Kryvyi Rih directorate of Cisdnieper disposal system – 1,5 – 2,0 km. railways) – 3 km; • Public utility «Kryvyi Rih International Power supply Airport» of Kryvyi Rih city council – 55,4 Land plot characteristics: Power supply of the land plot can be provided in two km (along the Р 74 highway); • area: ≈ 150 ha (Green-field); ways: • PJSC «Dniprodzerzhynskyi River Port» – • intended purpose of use: reserve lands; 1. connection to power transmission line (PTL), with 112 km (along the Е50/М04 highway); • cadastral number: n/a. voltage of 35 kV (manager – PJSC «Enterprise for the • Mykolaiv commercial seaport – 242 km • map reference: 48°21'25.2"N 33°28'28.1"E operation of electrical networks «Central Energy (along the H11 highway); Engineering infrastructure: Company»: • the city of Dnipro – 133 km (along the Е- substation to which the PTL is connected, has 50 highway); Water supply (manager – Public utility «Zhovti Vody reserves for connection of 10 MW; • the city of Kryvyi Rih – 62 km (along the water services company» of Dnipropetrovsk regional distance from the land plot to PTL with voltage of 35 Р74 highway). council») kV ≈ 400 m; Drinking water: power supply reliability category – I, II; power reserve of drinking water supply – 4800 2. connection to «Severnaya» substation 150/10/6 kV m³/day; (manager – JSC «DTEK Dnipro grid»: distance from the land plot to operating water «Severnaya» substation has power reserve to connect pipe draw off point: min – 0,2 km and max – 1 km; 10 MW; operating water pipe diameter – 400 mm. distance from the land plot to «Severnaya» Service water: substation ≈ 600 m; power reserve of service water supply – power supply reliability category – I, II; 96000 m³/day; EXECUTION OF A LAND LEASE CONTRACT BY WAY OF LAND BIDDING ~10 months ~3 months 1 day Preparation of a land plot Land bidding management Execution of a land lease contract City council: City council: Performing company: . preparation of documents for introduction . solution taking at the city council session on . signing of land plot lease contract with of amendments to urban planning organization of land bidding; Investor. documentation¹; . tender action to select performing company ² . solution taking at the city council session for land bidding as well as land surveying on introduction of amendments to urban organization. planning documentation; (The Land Code of Ukraine; . tender action to select design company for Land surveying organization: The Law of Ukraine «On land lease») preparation of urban planning . preparation and approval of land surveying documentation design. design documentation for the land plot. Design company: Performing company: . preparation and approval of urban . land bidding management. planning documentation design; Investor: City council: . land bidding application filling, registration fee . validation of urban planning and guarantee fee payment. documentation. DESIGN WORKS PHASE DESIGN WORKS Performing company: . identification of land bidding winner. (The Law of Ukraine «On the regulation of the urban development»). (The Land Code of Ukraine; The Law of Ukraine «On land lease»). __________________ the city of Zhovti Vody ¹ Urban planning documentation – master plan of settlement, territory zoning plan, territory comprehensive plan. ² Design works phase – is regulated by The Law of Ukraine «On the regulation of the urban development». .
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages3 Page
-
File Size-