Commonwealth Environmental Water Office Long Term Intervention Monitoring Project: Lachlan River System 2018-19 Technical Report: Final

Commonwealth Environmental Water Office Long Term Intervention Monitoring Project: Lachlan River System 2018-19 Technical Report: Final

1 COMMONWEALTH ENVIRONMENTAL WATER OFFICE LONG TERM INTERVENTION MONITORING PROJECT: LACHLAN RIVER SYSTEM 2018-19 TECHNICAL REPORT: FINAL February 2020 APPLIEDECOLOGY.EDU.AU Long Term Intervention monitoring project: Lower Lachlan river system 2018-19 Technical Reports Commonwealth Environmental Water Office Long Term Intervention Monitoring Project Lachlan river system 2018-19 Technical Report FINAL February 2020 This document has been co-ordinated by Dr Fiona Dyer and includes contributions from Mr Ben Broadhurst, Ms Alica Tschierschke, Dr Will Higgisson, Mr Hugh Allan and Professor Ross Thompson (University of Canberra); Dr Patrick Driver and Dr Sharon Bowen (NSW Department of Primary Industries, Water); Dr Joanne Lenehan (NSW Department of Planning, Industry and Environment); and Dr Jason Thiem and Dr Daniel Wright (NSW Department of Primary Industries, Fisheries). This monitoring project was commissioned and funded by Commonwealth Environmental Water Office with additional in-kind support from the University of Canberra, NSW Office of Environment and Heritage, and Department of Primary Industries. Copyright © Copyright Commonwealth of Australia, 2019 APPLIEDECOLOGY.EDU.AU ii Long Term Intervention monitoring project: Lower Lachlan river system 2018-19 Technical Reports Commonwealth Environmental Water Office Long Term Intervention Monitoring Project: Lower Lachlan river system Selected Area is licensed by the Commonwealth of Australia for use under a Creative Commons By Attribution 3.0 Australia licence with the exception of the Coat of Arms of the Commonwealth of Australia, the logo of the agency responsible for publishing the report, content supplied by third parties, and any images depicting people. For licence conditions see: http://creativecommons.org/licenses/by/3.0/au/ This report should be attributed as: Dyer, F., Broadhurst, B., Tschierschke, A., Higgisson, W., Allan, H., Thiem, J., Wright, D., Thompson, R. (2019). Commonwealth Environmental Water Office Long Term Intervention Monitoring Project: Lachlan river system Selected Area 2018-19 Monitoring and Evaluation Technical Report. Commonwealth of Australia, 2019. The Commonwealth of Australia has made all reasonable efforts to identify content supplied by third parties using the following format ‘© Copyright, [name of third party] ’. Disclaimer The views and opinions expressed in this publication are those of the authors and do not necessarily reflect those of the Australian Government or the Ministers for the Department of Agriculture, Water and the Environment. While reasonable efforts have been made to ensure that the contents of this publication are factually correct, the Commonwealth does not accept responsibility for the accuracy or completeness of the contents, and shall not be liable for any loss or damage that may be occasioned directly or indirectly through the use of, or reliance on, the contents of this publication. Inquiries regarding this document should be addressed to: Dr Fiona Dyer Phone: 02 6201 2452 e-mail: [email protected] Document history and status Version Date Issued Issued to Reviewed by Approved by Revision Type Draft Individual August 2019 CEWO Fiona Dyer Fiona Dyer Draft Technical chapters Draft Technical November 2019 CEWO Fiona Dyer & Fiona Dyer Draft report CEWO Final Draft 7 February 2020 CEWO CEWO, Basin Fiona Dyer Final Draft Matter Teams Front cover photo: The Lachlan River at Oxley, April 2019. Photo by Alica Tschierschke, University of Canberra APPLIEDECOLOGY.EDU.AU iii Long Term Intervention monitoring project: Lower Lachlan river system 2018-19 Technical Reports TABLE OF CONTENTS 1 Introduction ................................................................................... 17 2 Lower Lachlan river system – Selected Area .................................... 18 3 2018-19 Watering Actions .............................................................. 20 3.1 Catchment and weather conditions ............................................................................................................. 20 3.2 Enviromental water holdings ....................................................................................................................... 23 3.3 Planned water use ........................................................................................................................................ 23 3.4 Implemented watering actions .................................................................................................................... 24 3.4.1 Commonwealth environmental water delivery ........................................................................................ 24 3.4.2 NSW Watering Actions ............................................................................................................................. 25 3.5 Designing flows for fish ................................................................................................................................ 29 4 Hydrology ...................................................................................... 31 4.1 Introduction .................................................................................................................................................. 31 4.1.1 Action specific evaluation questions: ....................................................................................................... 32 4.1.2 Selected area specific evaluation questions: ............................................................................................ 32 4.2 Methods ....................................................................................................................................................... 34 4.3 Results .......................................................................................................................................................... 35 4.3.1 Watering Actions 1 and 2: Supporting native fish outcomes .................................................................. 36 4.3.2 Watering Action 3: Yarrabandai Lagoon ................................................................................................. 43 4.3.3 Watering Action 4: Autumn-Winter Fresh ............................................................................................... 45 4.4 Evaluation ..................................................................................................................................................... 46 4.5 Final comments and recommendations ....................................................................................................... 48 5 Stream metabolism and water quality ............................................ 49 5.1 Introduction .................................................................................................................................................. 49 5.1.1 Selected Area Specific evaluation questions: ........................................................................................... 50 5.2 Methods ....................................................................................................................................................... 50 5.3 Results .......................................................................................................................................................... 53 5.3.1 Water quality – 2018-19 .......................................................................................................................... 53 5.3.2 Water quality – 2014-19 .......................................................................................................................... 60 5.3.3 Stream Metabolism – 2018-19 ................................................................................................................. 64 5.3.4 Stream metabolism – 2014-19 ................................................................................................................. 70 5.4 Discussion ..................................................................................................................................................... 73 5.4.1 Watering Action 1 .................................................................................................................................... 73 5.4.2 Watering Action 2 .................................................................................................................................... 73 5.4.3 Watering Action 4 .................................................................................................................................... 73 5.4.4 Watering over the period 2014-19 ........................................................................................................... 74 5.5 Evaluation ..................................................................................................................................................... 74 5.6 Final comments and recommendations ....................................................................................................... 74 5.7 Appendix 1: Stream metabolism plots for additional sites in the Lower Lachlan River 2018-19 ................ 76 5.8 Appendix 2: Stream metabolism plots for additional sites in the Mid Lachlan River 2018-19 .................... 80 5.9 Appendix 3: Stream metabolism plots for additional sites in the Lower Lachlan River 2014-19 ................ 84 6 Fish community .............................................................................. 88 6.1 Introduction .................................................................................................................................................

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    242 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us