La. Hwy. 22 Bridge Construction and Drainage Improvements

La. Hwy. 22 Bridge Construction and Drainage Improvements

REGIONAL RETENTION/DETENTION PROJECTS AND NATURAL FLOOD MANAGEMENT STATE PROJECTS AND PROGRAMS Louisiana Highway 22 Bridge Construction and Drainage Improvements PROGRAM DESCRIPTION In 2020, the Louisiana Watershed Initiative’s five coordinating state agencies selected 15 projects to receive $163 million in federal funding. The projects were selected because they align with the missions of these agencies and the long-term resilience objectives of LWI. Specifically, the projects will reduce flood risk in communities throughout the state, store floodwaters in ways that enhance natural habitats and move people in flood-prone areas out of harm’s way. As the granting agency of these funds, the Louisiana Office of Community Development reviewed the projects to ensure they meet HUD requirements and align with the state’s $1.2 billion CDBG-MIT Action Plan. PROJECT DESCRIPTION La. Hwy. 22 functions as a barrier impeding natural hydrology in the Amite River floodplain. The highway prevents the natural flow of water into the adjacent McElroy Swamp, increases surface elevation in the river and exacerbates area flood risk. The La. Hwy. 22 Bridge Construction and Drainage Improvements project includes the construction of two bridge structures and the excavation of two drainage basins for the purpose of improving local hydrology, reducing area flood risk and restoring the McElroy Swamp. COST ESTIMATE $ 41.7 million Aerial view of La. Hwy. 22 where project improvements will be implemented to reduce flood risk upstream of the highway and restore natrual hydrology downstream of the highway. PROJECT DURATION PLAN CONSISTENCY LOUISIANA CDBG-MIT MASTER ACTION PLAN (2020) Planning/Engineering Complete The project is consistent with the Louisiana CDBG- and Design MIT Master Action Plan’s focus on implementing “state-identified regional retention/detention, natural flood management and infrastructure projects.” OCD Construction/ TBD identifies flood control projects as unmet mitigation Implementation needs. PROJECT LOCATION LOUISIANA’S COMPREHENSIVE MASTER PLAN FOR A Ascension Parish SUSTAINABLE COAST (2017) (HUD-Identified Most Impacted and Distressed Area) The Coastal Protection and Restoration Authority incorporated the Flood Risk and Resilience Program into the agency’s State Coastal Master Plan. The Livingston Parish proposed project is consistent with CPRA’s goal of implementing high-performing risk reduction projects (HUD-Identified Most Impacted and Distressed Area) in coastal parishes. SCALE OF INFLUENCE LOCAL SUB-BASIN BASIN REGIONAL PROVISIONAL WATERSHED REGION AND PROJECT LOCATION The project is located in Provisional Watershed Region 7, which includes 13 parishes in eastern Louisiana among the Mississippi River, Lake Pontchartrain and Mississippi. Those portions of La. Hwy. 22 impacted by the project are located near Bayou Terrace in St. Amant. Project Location(s) Project Location Parish(es) Provisional Watershed Region(s) Location of Watershed Region 7, with project location indicated by the green circle. LEARN MORE AT WATERSHED.LA.GOV/STATE-PROJECTS-AND-PROGRAMS.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us