Part 1 of 15

Part 1 of 15

SYDNEY METRO NORTHWEST SYSTEM WIDE DESIGN URBAN DESIGN AND CORRIDOR LANDSCAPE PLAN COR CUD RSH KVE BLV NRW SHW CSH CHEH CSF ESF NRT Document Number: NWRLOTS-NRT-SWD-LA-RPT-600100 The information within this report is for the purposes of the Sydney Metro Northwest only. No warranty is given or implied as to its suitability for any other purposes. This report has been prepared by HASSELL on behalf of Northwest Rapid Transit and Transport for NSW. Front cover image: Visualisation of Cudgegong Road Station Image by Ai3D HASSELL Level 2, Pier 8/9 23 Hickson Road Sydney NSW Australia 2000 T +61 9101 2000 F +61 9101 2100 hassellstudio.com @HASSELL_Studio HASSELL Limited ABN 24007711435 /ACN 007711435 Revision Date Status Prepared Checked Approved Purpose Comment _ F _ 25 July 2016 _ Draft _ ARM _ AL _ JB _ DP&E Review Extract Section 01 / 02 / 03 COR / CUD / BLV / NRW / SHW / 04 / Appendix _ G _ 29 July 2016 _ Draft _ ARM _ AL _ JB _ DP&E Review Extract Section 01 / 02 / 03 COR / CUD / BLV / NRW / SHW / 04 / Appendix _ H _ 31 August 2016 _ Draft _ ARM _ AL _ JB _ DP&E Review Report to TfNSW for final review _ I _ 20 September 2016 _ Draft _ ARM _ AL _ JB _ TfNSW Review EXTRACT Section 03 CSF/ ESF only _ J _ 28 September 2016 _ Final _ ARM _ AL _ JB _ DP&E Review Extract Section 03 CHE / RSH / KVE / CSH / CSF / ESP / Appendix ExecutiveIntroduction Summary 01 This Sydney Metro Northwest Urban Design The UDCLP proposes a coordinated This UDCLP report is “modular” and is and Landscape Corridor Plan has been response to the integration of the rail structured as follows. prepared to fulfil Condition 44 of the infrastructure stations and facilities into _ Section 1 contains an outline of the Minister for Planning and Infrastructure’s their existing and proposed settings. UDCLP purpose, scope, approach, Approval for Application No: SSI-5414. Features of the UDCLP include the structure and compliance with Condition Condition 44 requires the Proponent i.e. following: 44. Transport for NSW (TfNSW), to prepare, and _ Three station architectural typologies _ Section 2 deals with the project’s context submit to the Director General, the Urban that respond to “Place” as well as and the overarching system wide Design and Corridor Landscape Plan satisfying the functional and operational strategies that have informed the (UDCLP) prior to the commencement of requirements of the stations. planning and design of the UDCLP. permanent built works and/or landscaping, _ Station environs design that integrates _ Section 3 presents precinct plans for 11 unless otherwise agreed by the Director the facility with the adjacent precinct precincts around stations and service General. This UDCLP is for the contract and maximises the potential to derive facilities, as well as the corridor below works covered by the Operations, Trains and lasting social cultural, economic and the Sky Train viaduct section of the route, Systems design and construct contract, environmental benefits for the where not covered by the UDCLP for the being undertaken by the Northwest Rapid community over the long term. Surface and Viaduct Civil Works Transit Joint Venture (NRTJV), which was a _ A landscape design respectful of the Contract. The precinct plans describe the subject of the project Environmental Impact regional and local natural and cultural station/service facility design and the Statement known as EIS 2. Another Urban (as appropriate to place) settings, measures to integrate it with the Design and Corridor Landscape Plan has directed towards mitigating impacts, adjacent precinct. Each of the Section 3 been prepared for the design and healing disturbed ecosystems and precinct reports can be read alone, in construction contract for the surface and providing sustainable settings for the conjunction with Sections 1,2 and 4 or in viaduct civil works, the subject of project benefit of the environment and its combination with other precinct reports EIS 1. This UDCLP for the NRTJV contract citizens. or as a complete ‘book” of all precinct works does not duplicate matters _ A functional design that promotes reports, with Sections 1,2 and 4. addressed in the UDCLP for the surface and pedestrian and cyclist access and _ Section 4 presents the system wide viaduct civil works. facilitates multi modal transport componentry and elemental strategies integration. that underpin the urban, landscape and The Sydney Metro Northwest UDCLP _ A “kit of parts” architectural design to architectural design for the project. presents an integrated urban, landscape reinforce the Sydney Metro Northwest and architectural design for the project brand and obtain economies of scale This Urban Design and Landscape Corridor extending from Epping Services Facility to while still responding to local conditions. Plan will make a strong contribution to the Cudgegong Road station consistent with _ A public art and interpretation program integration of the Sydney Metro Northwest the requirements of Condition 44. The based on telling the story of the area’s project with its environment and design has been based on an examination heritage as well as using cultural links to communities. It will be a catalyser for a new of functional, natural and cultural drivers of introduce new initiatives focused on the age of service, community and urban the project at the metropolitan, regional theme “Light Line Social Square”, which development possibilities for generations of and local scales, consultations with will interpret the stories of the past in people living in the North West region of stakeholders and an agreed process of the new spaces created by Sydney Metro Sydney. iterative design. Northwest. Figure 1.1_Artist Impression of Rouse Hill Station. Source: Ai3D 01_3 Contents Section Appendix Executive Summary 04 System Wide Components Appendix A: Planning Approval Urban Design Condition 4.1 Introduction and Scope 44 - Extract from SSI 5414 Ministerial Infrastructure Approval 01 Introduction 4.2 Design Initiatives to Integrate Rail 1.1 Purpose Infrastructure, Stations and Facilities Appendix B: Summary of Stakeholder Consultation and Design Review Panel Interaction 1.2 Scope into their Existing and Proposed Settings Appendix C: Authorship and Competence 1.3 Approach 4.3 Landscaping Measures to Minimise, Mitigate and/or offset the Impacts of the SSI Appendix D: Glossary and References 1.4 Compliance 4.4. Built Elements in the Landscape Appendix E: Relevant Design Standards and Guidelines 1.5 Common Abbreviations used in this report 4.5. Sustainable Design and Maintenance 02 Project Metropolitan Planning Context and 4.6 Station Access Strategy (Condition C5) System Wide Design Framework 4.7 Pedestrian and Cyclist Network Facilities Strategy (Condition C10) 2.1 Project Context 4.8 Parking Management Strategy (Condition C11) 2.2 Strategic and Statutory Context 4.9 Signage and Wayfinding Strategy 2.3 Functional, Land Use and Transport Context 4.10 Aboriginal Archaeological and Cultural 2.4 Metropolitan Scale Design Objectives and Heritage Interpretation Installations Vision 4.11 Public Art Plan 2.5 Urban and Landscape Design Values and Approach 4.12 Built Elements Typical System Wide Design Details 2.6 Design Themes and Conceptual Approach 4.13 Implementation Management and Monitoring 2.7 Environmental and Sustainability Strategy Strategies 2.8 Passenger and Community Safety and Security 2.9 Community Amenity and Privacy 2.10 Stakeholder Consultation Strategy 2.11 Visual Impact Strategy (Condition 27) 2.12 Heritage Interpretation 03 Precinct Plans 3.1 Precinct Context 3.2 Urban Design and Landscape Plan 3.3 Architectural Design Introduction 01 01 Introduction Artist Impression of Rouse Hill Station. Source: Ai3D. 01_7 Introduction 01 1.1 Purpose 1.2 Scope This report has been prepared to document In June 2015, North West Rail Link (NWRL) This Urban Design and Corridor Landscape The information contained in this report is the Urban Design and Landscape Corridor was renamed Sydney Metro Northwest. The Plan (UDCLP), describes the design of the the latest available at the time of writing. Plan (UDCLP) for the Sydney Metro new name has been used throughout this permanent built works and landscaping of The nature of the design process on a Northwest project (formerly North West Rail document except where “North West Rail the corridor, stations and management project of this scale is one that requires Link). The plan has been prepared and Link” or “NWRL” appear as part of the title of facilities of the Sydney Metro Northwest continuous development and refinement implemented to guide the design of the an existing policy, strategy document or and the interaction these elements will until the project is constructed. permanent built works and landscaping report prepared prior to June 2015. have with the environment within which associated with the project. The preparation they are located. It responds to the Notwithstanding this, the material herein of the UDCLP was a requirement of requirements of Condition 44. provides a clear appreciation of the scale, Condition 44 of the Ministerial nature and treatment of the facilities Infrastructure Approval granted on 8 May Other UDCLPs have been prepared for proposed and their interactions with the 2013. Refer Appendix A: Urban Design different parts of the the overall Sydney environment. Condition 44 - extract from SSI Ministerial Metro Northwest project. For example the Infrastructure Approval. Surface and Viaduct Civil Works and Rapid Rail Transit Facility (SMTF). Reference The UDCLP and its contents have been used should be made to such documents for throughout the design evolution of the other information about the urban design project as well as to assist in consultations and landscape proposals of the Sydney with relevant authorities, councils and the Metro Northwest. community. Refer Appendix B: Summary of Stakeholder Consultation and DRP Thia document draws upon numerous Interaction.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    11 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us