Master Transportation Plan 2009-2016 January 2009

Master Transportation Plan 2009-2016 January 2009

20092009 Connecticut Connecticut Master Transportation Plan 2009-2016 January 2009 This page is left intentionally blank This page is left intentionally blank 2009 – 2016 STATE OF CONNECTICUT DEPARTMENT OF TRANSPORTATION 2009 MASTER TRANSPORTATION PLAN Prepared by: OFFICE OF POLICY CONNECTICUT DEPARTMENT OF TRANSPORTATION P.O. BOX 317546-2800 BERLIN TURNPIKE NEWINGTON, CONNECTICUT 06131-7546 IN COOPERATION WITH THE U.S. DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION January 2009 This page is left intentionally blank TABLE OF CONTENTS INTRODUCTION ........................................................................................................................................................1 MISSION STATEMENT, VISION & VALUES.....................................................................................................2 I. FULFILLING THE DEPARTMENT’S MISSION: BACKGROUND & STRATEGIC ACTION PLAN ..................................................................................................................................................I-1 A. BACKGROUND..........................................................................................................................................I-1 B. STRATEGIC FIVE-POINT ACTION PLAN ........................................................................................I-2 II. DEPARTMENT INITIATIVES.....................................................................................................................II-1 A. MAJOR PRIORITY PROJECTS...........................................................................................................II-1 PROJECTS UNDER CONSTRUCTION .....................................................................................................II-1 Aviation Projects ....................................................................................................................... II-1 Bradley International Airport, Rehabilitation of Runway 6-24 (Project No. 165-391) ............. II-1 Public Transportation Projects................................................................................................ II-1 Replacement of NHL Rail Car Fleet - Purchase of M8 Rail Cars, New Havel Line (Project No. 300-0116).............................................................................................................. II-1 New Haven Bus Maintenance Facility, CT Transit (Project 402-002)..................................... II-2 Fairfield Railroad Station Joint Development Project (Project No. 0301-0060 & 301- 096)............................................................................................................................................ II-2 New Haven Main Line Catenary Replacement (Project Nos. 0301-0054(B), 301-0070 (C1B) 0301-040 (C1A), 0301-T120 (C2).................................................................................. II-2 Highway Projects....................................................................................................................... II-3 Interstate 95 (I-95) New Haven Harbor Crossing Corridor Improvement Program– Pearl Harbor Memorial Bridge (“Q” Bridge) (Project Nos. 0092-0533, 0092-0569, 0092-0613, 0092-0618, 0014-0173, 0043-0122, 0092-0529, 0092-0531, 0092-0532, 0092-0619; list does not include all “Q”-Bridge projects)......................................................... II-3 CT 72- Relocation from End of Rte 72 Expressway to Rte 229, Bristol (Project No. 17- 137)............................................................................................................................................ II-4 U.S. 44 – Safety & Traffic Operational Improvements (Project No. 04-123) .......................... II-4 U.S. 7 – Bypass, Brookfield (Project No. 18-113).................................................................... II-4 PROJECTS BEING DESIGNED ................................................................................................................. II-5 Public Transportation Projects................................................................................................ II-5 New Britain to Hartford Bus Rapid Transit System (Project No. 0171-0305) ......................... II-5 Waterbury Bus Maintenance Facility (Project No. 431-0006) ................................................. II-5 CTDOT - 2009 MASTER TRANSPORTATION PLAN i West Haven Railroad Station (Project No. 106-116)............................................................... II-6 Shore Line East Railroad Station Improvements (Project 310-0048) ..................................... II-6 Preliminary Engineering–Walk and Saga Movable Bridges (Project No. 0301-0040, 301-xxx)..................................................................................................................................... II-6 New Haven Rail Maintenance Facility Complex – Program 1A, NHY- Program 1B and NHY – Program 2. (Project Nos. 300-0138, 300-T189, 300-139, 300-137, 300-0131, 301-110, 301-106) .................................................................................................................... II-6 Installation of Centralized Traffic Control (CTC) on the Danbury Branch (Project No. 0302-0007).............................................................................................................................. II-10 Highway Projects.....................................................................................................................II-10 Interstate 95 (I-95) New Haven Harbor Crossing Corridor Improvement Program– Pearl Harbor Memorial Bridge (“Q” Bridge) (Project Nos. 92-531 and 92-532) ................... II-10 Replace Interstate 95 bridge over the West River – New Haven (Project No. 0092- 0522) ....................................................................................................................................... II-11 Replacement of the Moses Wheeler Bridge, Stratford and Milford (Project Nos. 138- 221, 138-232).......................................................................................................................... II-11 I- 84 – Upgrade Expressway, Farmington (Project No. 0051-0259)..................................... II-11 PROJECTS IN THE PLANNING STAGE ................................................................................................. II-11 Airport Projects........................................................................................................................II-11 Waterbury-Oxford Airport, Airport Master Plan (10 Year Initiatives) (Project No. 107- 154).......................................................................................................................................... II-11 Bradley International Airport, New Terminal B Program – Reconstruct Murphy Terminal (Project No. 165-393) .............................................................................................. II-11 Danielson Airport, Airport Master Plan (10 Year Initiatives) (Project No.68-204)................. II-12 Waterbury-Oxford Airport, Noise Study/Environmental Assessment and Relocation Plan (Project No. 0107-0156)................................................................................................. II-12 Public Transportation Projects..............................................................................................II-13 Purchase of 80 Additional M8 Rail Cars (Project No. 300-0116).......................................... II-13 Construction of New Rail Station in Orange (Project No. 106-120) ...................................... II-13 New Haven Line Communication & Signal Replacement –New Haven to NY State Line (Project 300-0125) .......................................................................................................... II-13 New Haven – Hartford – Springfield Commuter Rail Proposal (Project No. 170-2296)....... II-13 Danbury Branch Electrification Study and Environmental Impact Statement (Project No. 302-0008) ......................................................................................................................... II-14 Waterbury and New Canaan Branch Lines Planning Study (Project No. 170-2562)........... II-14 Highway Projects.....................................................................................................................II-14 Reconstruction of I-95 through Long Wharf, New Haven (Project No. 92-572) ................... II-14 Transportation Improvements to the I-95 Corridor from Interchanges 70 to 84 – EIS/EIE (Project Number 170-2725) ..................................................................................... II-15 CTDOT - 2009 MASTER TRANSPORTATION PLAN ii I-84, Aetna Viaduct, Hartford (Project Nos. 63-648, 63-616, 63-644)................................... II-15 Transportation Improvements to the I-84 Corridor from the NY State Line to Waterbury EIS/EIE (Project No. 174-316) ............................................................................. II-15 I-84/Route 8 Waterbury Interchange Needs Study, (Project No. 151-301) .......................... II-16 Route 11 Extension: Salem to Waterford (Project No. 120-81) ............................................ II-17 B. BICYCLE AND PEDESTRIAN INITIATIVES.................................................................................II-17 Statewide Bicycle and Pedestrian Plan and Map Updates ................................................... II-17 C. ACTIONS TO COMPLY WITH CLEAN AIR ACT........................................................................II-18

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    202 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us